Modec, Inc.TSE: 6269

Forward Section of MODEC’s Next Generation Hull for FPSO Gato do Mato Departs for Integration at China Yard

· Issued by Modec, Inc.

Summary by 6ix AI

MODEC, Inc. completed the forward hull section of the FPSO Gato do Mato, a floating vessel that produces, stores and offloads oil, at Sumitomo Heavy Industries, Ltd.'s (SHI-ME) Yokosuka shipyard in Japan. The section has left Japan for China, where it will be joined with the aft hull section, which is still under construction.

Key details

  • MODEC says the project is the first to feature its Next Generation Hull (NGH) design. Soichi Ide, Head of MODEC's Floating Production Solutions Business Unit, says it is MODEC's first time partnering with SHI-ME on FPSO hull construction, using a multi-yard construction model in which hull sections are built in parallel at different yards.
  • MODEC says the FPSO will have a production capacity of approximately 120,000 barrels of oil per day and will be moored at around 2,000-meter water depth approximately 200 kilometers south of Rio de Janeiro, using a SOFEC spread mooring system.
  • FPSO Gato do Mato will be the 19th FPSO or FSO (a floating storage and offloading unit) developed by MODEC for Brazil and the second unit MODEC delivers directly to Shell for operation in the Orca Field, Brazil.
  • Orca is a partnership among Shell, as operator, and Ecopetrol, with PPSA participating as the Production Sharing Contract manager.

What’s still pending

  • The forward and aft hull sections still have to be integrated in China before the full hull moves to the next phase of construction.

6ix AI wrote this summary from the release below and checked it against the release.

Tokyo, Jul. 2, 2026

PDF [344.6 KB]

MODEC, Inc. (MODEC) announces a significant milestone in the construction of its latest Floating Production Storage and Offloading (FPSO) vessel with the successful completion of the forward hull section at Sumitomo Heavy Industries, Ltd.'s (SHI-ME) Yokosuka shipyard in Japan.

The completed forward hull section has departed Japan and is en route to China, where it will be integrated with the aft hull section currently under construction before the full hull progresses to the next phase.

Forward Section of MODEC's Next Generation Hull for FPSO Gato do Mato

The multi-yard construction model enables parallel fabrication, optimizes yard capacity and enhances project execution while maintaining the highest standards of quality and safety.

"This milestone is more than the completion of a major hull section. It demonstrates how innovation and collaboration are shaping the future of FPSO delivery. By partnering with SHI-ME on FPSO hull construction for the first time and adopting a multi-yard construction model, we are pioneering a new approach to hull fabrication that expands execution flexibility and strengthens our global delivery capabilities," said Soichi Ide, Head of Floating Production Solutions Business Unit, MODEC.

The project is the first to feature MODEC's Next Generation Hull (NGH) design, developed to enhance constructability, scalability, improve execution efficiency and support the delivery of increasingly complex offshore developments.

"Combined with our NGH design, this project reflects our commitment to continuously pushing boundaries, embracing new partnerships and delivering smarter, more resilient solutions for our clients," added Ide.

The FPSO will have a production capacity of approximately 120,000 barrels of oil per day (BOPD). It will be moored at around 2,000-meter water depth approximately 200 kilometers south of Rio de Janeiro, using a SOFEC® spread mooring system.

FPSO Gato do Mato will be the 19th FPSO/FSO to be developed by MODEC for Brazil. It will be the second unit to be delivered directly to Shell by MODEC for operation in the Orca Field, Brazil. Orca is being carried out through a partnership among Shell, as operator, and Ecopetrol, with PPSA participating as the Production Sharing Contract manager.

Reference
  • Projects > FPSO Gato do Mato
News of 2026
Latest News

Modec, Inc. on 6ix

Earlier from Modec

Later from Modec

All Modec news releases