Modec, Inc.TSE: 6269

ExxonMobil and MODEC celebrate First Oil milestone of FPSO Errea Wittu

· Issued by Modec, Inc.

Summary by 6ix AI

MODEC, Inc. said its FPSO Errea Wittu, a floating vessel that produces, stores and offloads oil, achieved First Oil, meaning its first oil production, on November 16, 2026. MODEC said this was ahead of schedule. The vessel is deployed in the Guyana Stabroek block for ExxonMobil Guyana Ltd. and is MODEC's first FPSO operation in Guyana for ExxonMobil.

Key details

  • Errea Wittu is designed to produce approximately 250,000 barrels of oil per day and has a storage capacity of 2 million barrels of crude oil. It is moored at a water depth of 1,690m offshore Guyana using a SOFEC Spread Mooring System.
  • MODEC will also operate and maintain the vessel for ExxonMobil.
  • MODEC says that with Errea Wittu deployed in the Stabroek block, Guyana's production capacity is set to ultimately pass one million barrels of oil per day.
  • Errea Wittu is MODEC's 18th FPSO or FSO (floating storage and offloading unit) delivered in South America and one of 54 floating units MODEC has delivered globally. As of the date of the announcement, 21 of those units are in operation.
  • MODEC says the vessel uses a Gas Turbine Combined Cycle system designed to improve energy efficiency and reduce CO2 emissions. It is designed for remote operation from shore, with onboard operations run on an AI suite from Shape Digital, a MODEC spin-off.

6ix AI wrote this summary from the release below and checked it against the release.

Tokyo, Nov. 17, 2026

PDF [375.3 KB]

MODEC, Inc. ("MODEC") is proud to announce that FPSO Errea Wittu achieved First Oil ahead of schedule on November 16, 2026. The early start-up reflects disciplined project execution and close collaboration between ExxonMobil Guyana Ltd. ("ExxonMobil") and MODEC from final investment through construction, sail-away and offshore commissioning. This milestone marks the successful start-up of MODEC's first FPSO operation in Guyana for ExxonMobil.

Named Errea Wittu, meaning "Abundance" in the Warrau language, the FPSO reflects Guyana's rich Indigenous heritage and the promise of opportunity and growth. With Errea Wittu deployed in the Guyana Stabroek block, it is set to ultimately take the country's production capacity past one million barrels of oil per day.

FPSO Errea Wittu

"Entire journey to First Oil from Errea Wittu demonstrates the industry leading performance by the result of the strong collaboration between MODEC, ExxonMobil, and everyone whose dedication and expertise contributed to this achievement. With our advanced technologies, innovative design and Build-to-Operate philosophy, Errea Wittu is set to operate safely, reliably and efficiently. We look forward to continuing as a trusted lifecycle counterpart to ExxonMobil and being part of Guyana's long-term energy future," says Soichi Ide, Head of Floating Production Solutions Business Unit, MODEC.

The FPSO is built on MODEC's proprietary hull design, with a full double hull and an enlarged topsides deck area to accommodate high-capacity processing systems. It is also equipped with a Gas Turbine Combined Cycle system, designed to improve energy efficiency and reduce CO2 emissions. These design features enable reliable and efficient operations over the life of the asset.

MODEC embedded cutting edge digital technology into the FPSO. It is designed for remote operations from shore and its onboard operations run on Shape Digital's AI suite1, which draws on a wealth of fleet-wide data from large scale operations across the world. Shape Digital uses more than 200 AI models to flag potential equipment failures in advance, while optimizing energy use in real time to reduce emissions. Together, these technologies deliver smarter, safer, more efficient and sustainable operations.

Using SOFEC®Spread Mooring System, the FPSO is currently deployed at a water depth of 1,690m offshore Guyana. Errea Wittu has a storage capacity of 2 million barrels of crude oil, and is designed to produce approximately 250,000 barrels of oil per day. MODEC will also operate and maintain the vessel for ExxonMobil, supporting its long-term performance and operational continuity throughout the asset's lifecycle.

First Oil by FPSO Errea Wittu reinforces MODEC's long-term commitment to Guyana. Beyond delivering the asset, MODEC is building local capability through dedicated training for Guyanese nationals and partnerships with local vendors, creating lasting value in the country.

FPSO Errea Wittu is MODEC's 18th FPSO/FSO delivered in South America and one of 54 floating units delivered by MODEC globally. As of the date of this announcement, 21 of these units are in operation.

  • 1 Shape Digital is a MODEC spin-off and digital services provider offering AI-based solutions for capital-intensive industries.
Reference
  • Projects > FPSO Errea Wittu
  • Projects > South America
  • Business > Floating Production Systems > FPSO/FSO
News of 2026
Latest News

Modec, Inc. on 6ix

Story so far

Earlier from Modec

Later from Modec

All Modec news releases