Jan. 18, 2011 (Baystreet.ca) --
By James West
MidasLetter.com
January 18, 2011
Xtierra (TSX.V:XAG)has to rank among the TSX Venture’s best kept secrets. With the
advanced Bilboa silver-zinc-lead project in Zacatecas, Mexico in
feasibility with a 140 million ounce silver equivalent resource, and
trading at a market cap of $14 million, the disparity between the
reality and the should-be makes this a nearly too-good-to-be-true
story. But while developing the understanding of the project and the
company for this piece, the reasons for the low price become clear.
(This is all of course my own speculation.)
The company is owned 60% by Minco PLC, and AIM-listed company in
based in London, and a further 18.1% is owned by Pacific Road Resource
Funds. Pacific Roads has an option to provide construction financing up
to $32 million dollars, and I assume Minco would do the rest, since the
budget is anticipated at a paltry $50 million. If you were going to
finance a mine, would you rather do it at $0.20 a share or $1?
The president of the company, Terrence McKillen, only controls 1.25
million shares, or 1.65% of Xtierra, but he is also CEO of Minco and
owns 7.5 million shares of Minco and a further 1.75 million options.
So there is a strong incentive for Xtierra to stay cheap for the
principle shareholders, and that fact is the silver lining in this
otherwise cloudy picture. Once construction of the mine is fully
capitalized, and production begins (expected by Q1-2012 at the latest),
the market will probably take these shares much higher – like into the
stratosphere where they will soon belong, barring a catastrophe between
now and the start of production.
Bilboa also contains lots of exploration blue sky, and recent drill
results demonstrates additional mineralization to the south, west and
northwest of the defined deposit, and the deposit remains open to the
southwest. The additional mineralization discovered will add to the
existing resource base. Of particular note are the higher grades of
zinc and lead encountered in the southwest area and the discovery of
high grade silver and gold mineralization along the western flank of
the deposit. Drilling also confirmed the presence of thick zones of
oxide mineralization near to
surface and amenable to open-pit extraction in the northern part of the deposit.
Besides this near term production project, the company has a
tailings project which is very advanced and likely to follow close on
the heels of Bilboa into production.
The La Laguna Pedernalillo silve-gold-mercury project, on the basis
of a Measured and Indicated Resource prepared by Micon International,
it is estimated the mineral reserve as a total of 6,799,000 tonnes,
containing an average of 57.92 grams per tonne silver, 0.31 grams per
tonne gold and 328.92 grams per tonne mercury. This reserve includes
only that material that is classified in either the proven or probable
categories.
Then there’s the El Dorado Gold property 7 kilometers northeast of
the historic Pinos gold deposits where veins with reported bonanza
grades of more than 200grams per tonne gold were mined historically on
northwest striking veins making the Pinos district the largest gold
producer in the State of Zacatecas during the Colonial Period. Historic
records suggest the average mined grade was 97 grams per tonne silver
and 58.26 grams per tonne gold.
Preliminary work completed by Xtierra confirms the high grade nature
of the El Dorado vein with channel sampling returning values ranging
from 0.5 to 57.0 g/t gold over widths of 0.10 to 1.0 metre with
individual grab samples as high as 1,760 g/t gold and 3,590 g/t silver.
Such grades indicate the potential for bonanza deposition zone
development within an epithermal boiling zone. The property has seen no
drilling as of yet and its not clear when Xtierra plans to advance this
exploration project.
To summarize, this is one of those dream scenarios that come along
every so often that is overlooked by the general market because of its
share price. This is a seriously undervalued company that won’t be for
long, in my opinion.
DISCLOSURE: MidasLetter subcribers were first alerted to Xtierra on
November 7, 2010 when the stock was trading at $0.19. As such,
subscribers are likely to exit some or all of their positions in the
days ahead based on the 100% appreciation in share price since that
time. Midas subscribers typically exit at least 50% of their positions
when the stocks we feature double.
MidasLetter Premium Edition identifies 5 stocks on the first
Sunday of each month from the TSX Venture Exchange that are expected to
double within 12 to 18 months, 9 out of 10 times. Subscribe now for $49 per month, or $499 for one year,
at http://www.midasletter.com/subscribe.php. 30 day instant refund
period from your first subscription day if not 100% satisfied.