MetalsTech Fast Tracks Drilling at Sturec Gold Mine
Filed with ASX · · 6 pages · English
Mining operations have recommenced at the Andrej Adit. Diamond Drilling on the Kremnica Mining Licence ENDS Background: Sturec Gold Mine Table 1: Mineral Resource Estimate – Sturec Gold Project 1 AuEq g/t = ((Au g/t grade*Met. Rec.Au price/g) + (Ag g/t gradeMet. Rec.*Ag price/g)) / (Met. Rec.*Au price/g) Long term Forecast Gold and Silver Price USD/oz (source: World Bank, JP Morgan): $1,500 and $2
Story so far
Earlier from MetalsTech
- MetalsTech Secures $3.6 million Strategic Funding Package
- MetalsTech Targets High Grade Gold Zone at Sturec
- NWR Small-Cap Virtual Conference Presentation
- JORC 2012 Mineral Resource Estimate for Sturec Gold Mine
- MetalsTech Awarded Extension to Underground Mining Permit
Later from MetalsTech
- BCC Bookbuild and Sell Down Completed
- Diamond Drilling Commences at Sturec Gold Project
- Interim Drilling Update - Sturec Gold Mine
- Diamond Drilling Update at Sturec Gold Mine
- Excellent Gravity and Flotation Recoveries at Sturec Gold
Follow MetalsTech into a list and get an email when it puts out news.
Follow MetalsTech