March 2026 Quarterly Report
Filed with ASX · · 13 pages · English
Odyssey Gold Limited (ASX: ODY) (“Odyssey” or “Company”) is pleased to present its Quarterly Report for the quarter ended 31 March 2026. HIGHLIGHTS • Commenced 2026 field work and studies designed to accelerate the path to production at the Company’s flagship Tuckanarra Gold Project (“Tuckanarra” or “the Project”). • A reverse circulation (“RC”) drill rig commenced resource definition drilling at
Story so far
Earlier from Odyssey Gold
- Assay Results of Metallurgical Drillholes
- December 2025 Quarterly Report
- Successful Placement to Raise $9 Million
- Trading Halt
- Shallow Oxide Results Outside Existing Mineral Resource
Later from Odyssey Gold
- Metallurgical Results Confirm 95% Gold Recoveries
- Kirkalocka Toll Milling Agreement for Tuckanarra Project
- High-Grade Drill Results Confirm Growth Potential at Bollard
- Cable Drilling Continues to Strengthen Development Pathway
- New Cable Resource Increased to 60% Indicated
Follow Odyssey Gold into a list and get an email when it puts out news.
Follow Odyssey Gold