Lion Rock Resources IncTSXV: ROAR

Mainstream Minerals / Kings Bay Gold Rare Earth Elements and Gold Drill Results, Bobjo Mine Project, Red Lake, Ontario

· Issued by Lion Rock Resources Inc

Jun. 9, 2009 (TheNewswire.ca) --

June 9 2009 - Mainstream Minerals (OOTC:MSMCF) (TSXV:MJO) Corporation (TSX.V: MJO) and King's Bay Gold Corporation (TSXV:KBG) (TSX.V: KBG) are pleased to announce that they have received the final rare earth elements and gold drill results from their Phase 2 program at their Bobjo Mine Project, located in Earngey and Agnew Townships, Red Lake, Ontario.

Phase 2 included 5 holes, Holes #28 to #32 inclusive, in the vicinity of the high-grade gold discovery area, two holes in the rare earth elements discovery area and 10 exploratory holes 2 kilometres south at the bottom end of the property.

Hole #11-B was drilled approximately 100 metres east of the companies' high-grade gold discovery along a fault with a strike length of approximately 10 kilometres and included the discovery of significant zones of rare earth elements, iron, magnesium, manganese and others.

Hole #11-B

Dip -45 Degrees

From 40.25 to 43.50 metres:

3.25 metres grading 22.66 g/t Sc (Scandium), 16.83 g/t Rb (Rubidium), 25.33 g/t Nd (Neodymium), 37.83 g/t Ce (Cerium), 5.16 g/t Hf (Hafnium), 17.83 g/t Y (Yttrium), 11.83 g/t Li (Lithium), 80.33 g/t Cr (Chromium), 18.33 g/t La (Lanthanum), 72.00 g/t Sr (Strontium), 1.15 g/t Tb (Terbium), 2.28 g/t Th (Thorium), 3.81 g/t Yb (Ytterbium), 1.75 g/t Eu (Europium), 5.85 g/t Sm (Samarium), 57.16 g/t V (Vanadium), 1.215 % Mg (Magnesium), 4.383 % Ca (Calcium) and 9.733 % Fe (Iron).

From 59.25 to 65.75 metres:

6.50 metres grading 26.09 g/t Sc (Scandium), 17.81g/t N (Neodymium), 19.00 g/t Ce (Cerium), 3.01 g/t Hf (Hafnium), 17.33 g/t Y (Yttrium), 18.41 g/t li (Lithium), 47.72 g/t Cr (Chromium), 10.01 g/t La (Lanthanum), 82.75 g/t Sr (Strontium), 4.40 g/t Yb (Ytterbium), 2.42 g/t Eu (Europium), 4.42 g/t Sm (Samarium), 113.83 g/t V (Vanadium), 2.035 % Mg (Magnesium), 0.402 % Mn (Manganese), 5.617 % Ca (Calcium) and 17.201 % Fe (Iron).

From 139.75 to 151.25 metres:

11.50 metres grading 28.56 g/t Sc ( Scandium), 19.69 g/t Nd ( Neodymium), 24.91 g/t Ce (Cerium), 4.01 g/t Hf (Hafnium), 12.15 g/t Y (Yttrium), 9.69 g/t Li (Lithium), 41.01 g/t Cr (Chromium), 11.73 g/t La (Lanthanum), 41.46 g/t Sr ( Strontium), 4.10 g/t Yb (Ytterbium), 1.80 g/t Eu (Europium), 5.34 g/t Sm (Samarium), 98.30 g/t V (Vanadium), 136.57 g/t Tl (Thallium), 1.472 % Mg (Magnesium), 0.282 % Mn (Manganese), 6.015 % C (Calcium) and 13.617 % Fe (Iron).

From 156.25 to 160.25 metres:

4.0 metres grading 32.88 g/t Sc (Scandium), 21.44 g/t Nd (Neodymium), 24.44 g/t Ce (Cerium), 4.02 g/t Hf (Hafnium), 9.00 g/t Y (Yttrium), 7.50 g/t Li (Lithium), 51.33 g/t Cr (Chromium), 11.44 g/t La (Lanthanum), 45.00 g/t Sr (Strontium), 4.51 g/t Yb (Ytterbium), 1.75 g/t Eu (Europium), 4.83 g/t Sm (Samarium), 72.10 g/t V (Vanadium), 110.40 g/t Tl (Thallium), 1.644 % Mg (Magnesium), 0.288 % Mn (Manganese), 6.250 % Ca (Calcium) and 11.301 % Fe (Iron).

From 167.0 to 171.25 metres:

4.25 metres grading 24.33 g/t Sc (Scandium), 17.33 g/t Nd (Neodymium), 20.44 g/t Ce (Cerium), 3.33 g/t Hf (Hafnium), 8.01 g/t Y (Yttrium), 17.00 g/t Li (Lithium), 132.11 g/t Cr (Chromium), 10.33 g/t La (Lanthanum), 40.11 g/t Sr (Strontium), 3.35 g/t Yb (Ytterbium), 1.21 g/t Eu (Europium), 4.01 g/t Sm (Samarium), 85.00 g/t V (Vanadium), 131.77 g/t Tl (Thallium), 2.094 % Mg (Magnesium), 0.155 % Mn (Manganese), 3.894 % Ca (Calcium) and 11.488 % Fe (Iron).

Highlights from the 6 holes drilled to date that intersected rare earth elements, rare metals and other minerals included a high from Hole #23 of:

54.25 metres grading 30.57 g/t Sc (Scandium), 5.01 g/t Rb (Rubidium), 15.31 g/t Nd (Neodymium), 26.23 g/t Ce (Cerium), 12.10 g/t Li (Lithium), 5.01 g/t Sm (Samarium), 11.01 g/t Y (Yttrium), 12.03 g/t Ba (Barium), 15.30 g/t B (Boron), 3.72 g/t Hf (Hafnium), 3.90 g/t Yb (Ytterbium), 1.00 g/t Th (Thorium), 1.23 g/t Tb (Terbium),10.51 g/t La (Lanthanum), 2.00 g/t Eu (Europium), 110.18 g/t Cr (Chromium), 109.00 g/t V (Vanadium), 55.11 g/t Sr (Strontium); 0.022 % Zn (Zinc), 0.053 % P (Phosphorus), 0.101 % Ti (Titanium), 0.117 % Mn (Manganese), 1.101 % Mg (Magnesium), 5.210 % Ca (Calcium), and 13.270 % Fe (Iron).

True Widths are Not Known

Detailed results from the 6 drill holes that intersected rare earth elements, rare metals and other minerals to date on this project can be seen at:

http://www.mainstreamminerals.com/site/properties/bobjo/resultsreebobjo.pdf

Included below are all the gold results from this Phase 2

True Widths are Not Known

Hole        Dip   Interval From   Interval To   Interval Metres   Au g/t   
BJ08-28     -75   87.40           87.90         0.50              3.081    
                  117.00          117.25        0.25              1.430    
                  125.25          126.25        1.00              27.433   
                  142.25          142.50        0.25              1.455    
                  313.25          313.75        0.50              8.229    
                                                                           
BJ08-29     -45   13.50           14.00         0.50              0.699    
                  58.50           58.75         0.25              0.904    
                                                                           
BJ08-30     -45   50.75           51.25         0.50              1.318    
                  79.75           80.00         0.25              5.943    
                  84.75           85.00         0.25              2.853    
                                                                           
BJ08-31     -45   13.75           14.25         0.50              2.126    
                  14.75           15.25         0.50              7.017    
                  18.75           19.00         0.25              1.074    
                                                                           
BJ08-32     -45   2.50            5.00          2.50              1.703    
including         4.50            5.00          0.50              4.030    
                  6.75            7.25          0.50              1.770    
                  8.25            9.25          1.00              1.463    
                  9.75            10.25         0.50              4.294    
                  13.25           13.75         0.50              1.058    
                  18.25           18.75         0.50              3.469    

Highlights from the 32 holes drilled by the partners to date at the high-grade gold discovery area included:

53.61 g/t Au over 2.45 metres32.95 g/t Au over 1.10 metres27.43 g/t Au over 1.00 metres19.61 g/t Au over 2.00 metres18.18 g/t Au over 0.50 metres14.55 g/t Au over 1.00 metres12.80 g/t Au over 0.50 metres12.01 g/t Au over 0.50 metres8.70 g/t Au over 1.10 metres9.45 g/t Au over 1.00 metres8.45 g/t Au over 3.40 metres6.84 g/t Au over 1.00 metres6.25 g/t Au over 1.50 metres5.77 g/t Au over 3.00 metresDetailed gold results of all thirty two holes drilled by the partners to date can be seen at:

http://www.mainstreamminerals.com/site/properties/bobjo/resultsaubobjo.pdf

The partners drilled 10 exploratory holes 2 kilometres south of the main discovery area at the bottom end of the property. All ten holes intersected wide zones of anomalous Platinum values. This area will need to be investigated further.

The Bobjo Mine Project is located between the former South Bay Zinc / Copper Mine and Uchi Lake Gold Mine. It is noted that an existing power line passes through the southern part of the property. The joint venture is 50 % Kings Bay Gold (TSX.V: KBG) and 50 % Mainstream Minerals (TSX.V: MJO) with Mainstream Minerals being the Operator of the project.

Andrew Gracie, Ph.D, P. Eng, P.Geo is the Qualified Person under National Instrument 43-101. All of the samples herein were analyzed by Acurassay Labs using the Neutron Activation Method and Acqua Regia Digestion with an ICPAES finish and standard fire assay for gold. True widths are not known.

The partners are pleased with the progress made to date at this project and with the fact that drilling has so far intersected gold in twenty seven out of thirty two holes from surface to a depth of 312 metres so far, which included high-grade gold in many intersections. All zones are open at depth and in all directions. The rare earth elements, rare metals, and other minerals were a surprise on this gold project and will definitely need some follow up drilling.

Most of the veins tested so far ran in an east-west direction. The area just north of the high-grade gold discovery is also host to many other quartz veins that have not been tested as of yet, including a 2 metre wide quartz vein than is running in a north-south direction. Grab samples from this vein yielded results as high as 115.00 g/t Au.

The partners are planning an aggressive Phase 3 exploration program for this exciting project in the near future and Mainstream Minerals is planning on commencing a financing very shortly.

About Mainstream Minerals

Mainstream Minerals Corporation is a mineral exploration and development company focused on precious metal mining properties with economic potential, with the aim of bringing such properties to commercial production. The Company's portfolio of properties is primarily located in the prolific Red Lake Gold Camp and other areas of Northwestern Ontario. The properties include - (i) 50% of the Bobjo Mine project and (ii) 50 % of the Phyllis Lake project.

MJO Shares Outstanding: 19,176,087

Mainstream Minerals Corporation

Richard R. Rivet

President CEO

(204) 222-0137

info@mainstreamminerals.comwww.mainstreamminerals.com

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release. Some of the statements contained in this release are forward-looking statements, such as estimates and statements that describe KBG's and / or MJO's future plans, objectives or goals, including words to the effect that KBG and / or MJO or their respective managements expect a stated condition or result to occur. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties.

Copyright (c) 2009 Thenewswire.ca - All rights reserved.