Maiden Drilling Commences at Mustang Lithium Project
Filed with ASX · · 4 pages · English
Summary by 6ix AI
Red Mountain Mining Ltd has announced the commencement of its maiden drilling program at the Mustang Lithium Project in Nevada, USA, with a Reverse Circulation drill rig now on site. The drilling program, managed by Alloy Drilling LLC, will consist of eight holes targeting lithium-bearing clay horizons. Additionally, surface sampling is nearing completion at the Lithic Lithium Project, with plans for a subsequent drilling program based on assay results.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Red Mountain Mining Ltd on 6ix
Story so far
Earlier from Red Mountain Mining
- Drill Permit Granted for Mustang Lithium Project USA
- High Grade Claystone Lithium Obtained at Lithic Project
- Drill Permit Successfully Lodged for Mustang Lithium Project
- Commencement of Field Work at Charlotte Lithium Project
- Red Mountain Lithium Project Activities Update
Later from Red Mountain Mining
- Completion of Maiden Drilling at Mustang Lithium Project
- Red Mountain Enters Into Farm-In with Liontown
- High Grade Lithium Discovery From Near Surface at Mustang
- Successful Completion of Placement
- High Grade Lithium Results Continue to Impress at Lithic
Follow Red Mountain Mining into a list and get an email when it puts out news.
Follow Red Mountain Mining