Maiden Drilling at Muchea West Silica Confirms High Grade
Filed with ASX · · 21 pages · English
Results confirm the grades from previous drilling, and includes intercepts such as: MW0077 – 15m @ 99.81% SiO2, 222 ppm Fe2O3 and 154 ppm Al2O3 from 1m MW0092 – 20m @ 99.69% SiO2, 450 ppm Fe2O3 and 313 ppm Al2O3 from 1m MW0127 – 17m @ 99.70% SiO2, 350 ppm Fe2O3 and 260 ppm Al2O3 from 1m MW0142 – 21m @ 99.76% SiO2, 329 ppm Fe2O3 and 310 ppm Al2O3 from 1m 233 holes drilled along existing tracks for
Carbine Resources Limited on 6ix
Story so far
Earlier from Carbine Resources
- CRB Completes Maiden Drilling at Muchea West Silica Sands
- Maiden Exploration Target at Muchea West Silica Sands Projec
- ASX Grants Extension of Removal Date
- Prospectus
- Quarterly Activities Report
Later from Carbine Resources
- Trading Halt
- Suspension from Official Quotation
- Carbine to acquire the Sandbox Silica Sands Project
- Sandbox Acquisition Not to Proceed
- Maiden Muchea West Silica Sand Resource 93Mt at 99.71% SiO2
Follow Carbine Resources into a list and get an email when it puts out news.
Follow Carbine Resources