Mahalo North 2 Second Lateral Section Successfully Drilled
Filed with ASX · · 3 pages · English
• Second Mahalo North 2 dual lateral well section successfully drilled and lined, reaching a total (along hole) distance of 1152m. • Over 2100m of total lateral section successfully drilled with almost 1900m in-seam for production. • High drilling fluid losses indicative of a good natural fracture network along both lateral well sections. • Rig released and soon moving off location. Comet Ridge Li
In the deck
Story so far
Earlier from Comet Ridge
- Mahalo North 2 first lateral section successfully drilled
- Comet Ridge Limited - Mahalo North 2 dual lateral well spuds
- Very Positive Results at Mahalo North 1
- Mahalo North 1 vertical well spuds
- Corporate and Operations Update
Later from Comet Ridge
- Comet Ridge Limited - Mahalo North 2 second lateral section successfully drilled and rig released
- Managing Directors 2021 AGM Presentation
- Comet Ridge Limited - Mahalo North operations update
- Comet Ridge Limited - Mahalo North production testing successfully commenced
- Bell Potter Unearthed Conference MD Presentation
Follow Comet Ridge into a list and get an email when it puts out news.
Follow Comet Ridge