Lorelle-3H Update
Filed with ASX · · 4 pages · English
On 6ix: 6ix.com/news/lorelle-3h-update
• Elixir has drilled and cased the heel of the Lorelle-3H well through the overlying coal and into the primary target, the Tinowon ‘Dunk’ Sandstone. This interim milestone marks a significant de-risking moment for the horizontal section of the well which will commence drilling imminently. • SLB have completed the Lorelle-3H Horizontal Landing Optimisation Study which has been used to identify the
Earlier from Elixir Energy
- R&D Funding Program Update
- Outstanding results at Lorelle-3
- Lorelle-3 intersects multiple Permian reservoirs
- Lorelle-3 Update
- Q2FY26 Quarterly Report and Appendix 5B
Later from Elixir Energy
- Teelba 2D Seismic Campaign Commences Mobilisation
- Over 1,000m of net gas pay recorded in Lorelle-3H
- EXR Euroz Rottnest Conference
- Teelba Seismic Survey Complete
- Elixir commences feasibility on Taroom Trough pipeline
Follow Elixir Energy into a list and get an email when it puts out news.
Follow Elixir Energy