Kyushu Railway Company TSE:9142
Kyushu Railway : The Future Railway Project(3,572 KB)
Source: MarketScreener
JR KYUSHU IR DAY 2025
The Future Railway ProjectNovember 26, 2025
Director and Managing Corporate Officer,
Director General of Railway Operations Headquarters
Michiya Sadakari
ContentsⅠ Need for the Future Railway Project 3
Ⅱ The Future Railway Project in Review 6
Ⅲ Outcomes of and Progress on the Future Railway Project 11
Ⅳ Impact of the Future Railway Project within the
Medium-Term Business Plan 17
Realize Sustainable Mobility Services
Ⅰ Need for the Future Railway ProjectNeed for the Future Railway Project
Internal environment: aging of railway infrastructure
0-10
years
11-15
years
16-20 21-25 26-30 31-35
years years years years
36-40
years
41-45 46-50 51-55
years years years
56-60 More
years than 60
years
1,600
1,200
Aging bridges
800
400
0
~10 ~20 ~30 ~40 ~50 ~60 ~70 ~80 ~90 ~100 ~110 ~120 ~130 ~140
0-10
11-20
21-30
31-40
41-50
51-60
61-70
71-80
81-90
91-100 101-110 111-120
~150
121-130 131-140 141-150
years
90
years
years
years
years
years
years
years
years
years
years
years
years
years
years
Aging tunnels
60
30
~10 ~20 ~30 ~40 ~50 ~60 ~70 ~80 ~90 ~100 ~110 ~120 ~130 ~140 ~150
0
0-10
11-20
21-30
31-40
41-50
51-60
61-70
71-80
81-90
91-100 101-110 111-120
121-130 131-140 141-150
years
years
years
years
years
years
years
years
years
years years years
years years years
16,000
12,000
Aging utility poles
8,000
4,000
0
Need for the Future Railway ProjectInternal environment: rolling stock renovation on Shinkansen and
電車
新幹 線
気動 車
内燃機 関車
客車
Shinkansen
Diesel railcars
Passenger cars
Internal combustion locomotives
Electric trains
conventional lines
160
140
120
100
80
60
The standard replacement period for conventional lines: 45-60 years
The standard replacement period for Shinkansen: 25-30 years
40
20
0
1972 1975 1978 1981 1984 1987 1990 1993 1996 1999 2002 2005 2008 2011 2014 2017 2020 2023
Ⅱ The Future Railway Project in ReviewThe Future Railway Project in Review
Business structural reforms in the railway business, the segment most impacted
by the COVID-19 pandemic
Impact of the pandemic and project initiatives
As part of cost reduction efforts in the railway business, we achieved a ¥14.0 billion
reduction in fixed costs through BPR.
To further deepen business structural reforms, we launched the Future Railway
Project in FY23.3.
Return to a growth
trajectory
Achieving sustainable
growth
Return to
profitability
2016 2017 2018 2019
(Initial public offering)
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Future Railway Project
*Building on BPR to achieve lasting improvements in the earnings structure
BPR* project: Completed in two and a half years with ongoing impact
Medium-Term Business Plan 2025-2027
Impact of the pandemic
Illustration of operating income:
Loss
Profit
* We conducted business process re-engineering (BPR) in a short timeframe and successfully achieved a ¥14.0 billion reduction in fixed costs in FY23.3.
The Future Railway Project in Review
Creating the "railway of the future" to drive city-building in Kyushu
Overview of the Future Railway Project
The Future Railway Project builds on the lean railway business established through BPR and aims to strengthen both mobility innovation and financial resilience.
Cross-functional teams are working to harness the railway's strengths and assets to create new revenue opportunities
BPR impact
Operating expenses
Operating revenues
(Billions of yen)
and drive innovation through technological development and adoption of new technologies.
Goals of the Future Railway Project
-14.0
→Profit improvement due to the Future Railway Project
Quantitative goal
187.7
162.3
Through DX promotion and technological innovation, the project aims to further reduce fixed costs and increase revenues, targeting an improvement of over ¥14.0 billion in operating profit by FY31.3.
Qualitative goal
The project is driven by a foundation of safety, security, and a customer-first mindset, with the goal of enhancing the value of railways and creating a virtuous cycle of growth.
Operating income
25.4
Forecast for FY26.3
Figures as of Q2 FY26.3 results announcement
Enhance value and ensure
sustainable growth of the railway
Improvement of
provided value
Customer Employee growth satisfaction and job
Revitalization of satisfaction local communities
Future Railway Project
Customer perspective
Safety
Investment
in human capital Investment in growth
Creation of a
sustainable profit-generating management foundation
Furthe
r strengt hening
Note: The ¥14.0 billion improvement target is measured from
FY2022 earnings, after the COVID-19 pandemic.
The Future Railway Project in Review
Improving revenue and expenditures through revenue acquisition and investment, and creating the future beyond organizational boundaries.
Purpose of the Future Railway Project
With rising depreciation costs, it is essential to build a resilient management foundation for the future-both defensively and offensively.
Defensive efforts at future-
oriented reinforcement
Build unwavering management resilience to fulfill the mission of rail and mobility even amid unforeseen challenges.
Proactive efforts at future-
oriented reinforcement
Prioritize safety while evolving into a management structure capable of bold investments in new technologies and services.
Population decline, inflation, climate change
(increasingly severe disasters)
Large-scale renovation of rolling stock and infrastructure ahead, as well as investment aligned with evolving customer needs
Rise in depreciation cost
Differences between BPR and the Future Railway Project
Considered by cross-functional teams
Medium to long term (sights set on FY2031.3)
Improve provides by earning revenues and investing
Focus on cutting costs
Short term (completion to take approximately two and a half years)
Considered by individual organizations
BPR Project Future Railway Project
The Future Railway Project in Review
Promotion system and Decision-Making Framework for Reliable Project Execution
Future Railway Project Promotion Framework
Originally launched with nine cross-functional teams; currently progressing across five
cross-functional teams spanning multiple divisions
Cross-functional teams
Future
maintenance
Future
earning methods
Future
facilities
Future
back office
Future
transpor tation systems
The teams that implemented the initiatives have now transitioned to the full operation phase, where each department or relevant unit is responsible for ongoing management and verification.
Future earning methods (railway-adjacent areas)
Future Group
companies
Future income/expense management (visualization of income and expenses)
Future local lines
Project discussions and frequency
To ensure achievement of the ¥14.0 billion income improvement target for the Future Railway Project, each initiative
is monitored, tracked, and risk-assessed.
[President's briefing]
Frequency: Once per month
Participants: President, executive officers, and others
[Progress meeting] Frequency: Once per month
Participants: Railway business division heads and others
[Secretariat meeting] Frequency: Once per month
Working-level meetings for each team
Ⅲ Outcomes of and Progress on the Future Railway ProjectOutcomes of and Progress on the Future Railway Project (Future Transportatioon Systems)
Building a Safe, Customer-Centric, and Environmentally Sustainable Railway
Creating a Rewarding and Comfortable Workplace through Expanded Roles
Expanded autonomous driving section
Promote automation and mechanization of tasks to ensure long-term maintenance of transportation
infrastructure amid declining labor population.
Automated
Operation GOA2.5
Automated operation with on-board certified operators (internal
qualification).
In emergencies, operators perform emergency stop and guide evacuation.
Automated
Operation GOA2.0
Automated operation with licensed drivers (national
qualification).
In emergencies, drivers perform emergency stop and guide evacuation.
March 2024: GOA 2.5 automated operation launched on the Kashii Line; GOA 2.0 trial operation started on Kagoshima Main Line (Orio-Futsukaichi).Future plans:
Further expansion of automated operation sections.(GOA: Grade of Automation)
Flexible Transportation Capacity to Meet Demand
Exploring Optimal Transportation Capacity and Improved Convenience through New Turnback Facilities
Developing an Eco-Friendly Railway
Deployment of Energy-Efficient Driving (Eco Driving)
Conventional Lines: Display eco marks on timetables and designate priority sections for energy-efficient driving.
Shinkansen: Standardize buffer times between stations and set priority
periods for energy-efficient driving.
Short-Term (by 2027) Medium-Term (by 2035)
Indicate buffer times between stations with eco (leaf) marks.
leaf mark : 15 seconds
leaf mark : 30 seconds
leaf mark : 45seconds or more
Promote efficient driving by moderating maximum
speed to reduce traction power and CO₂ emissions.
Expand energy-efficient driving to all areas (mainly local trains).
Full-area implementation; reduce traction power by 5%.
FY2025 Initiatives
Outcomes of and Progress on the Future Railway Project (Future Maintenance)
Driving the Future of Railways with Advanced, Creative Maintenance
Target Cycle
Mechanizing, robotizing, and leveraging AI to streamline the entire maintenance
cycle-from inspection and analysis to repair.
Minimizing Lifecycle Costs through Condition-Based Maintenance
Deployment and Full-Scale Operation of Multi-
Functional Inspection Vehicle "BIGEYE"
Replacing traditional on-foot patrols with the multi-functional inspection vehicle "BIGEYE" enables material monitoring, displacement measurement, and point cloud data conversion for comprehensive condition monitoring.
Our ultimate goal is to eliminate on-foot patrols entirely by introducing AI-driven decision-making for maintenance necessity.
Material monitoring
Rail
Joint plate
Orbital
displacement
Rail bond
Future image
AI development
Judging the need for repair
Introduction and Development of REDEYE
and Smart REDEYE
In addition to replacing train patrols with "REDEYE,"
we are developing a portable version, Smart REDEYE.
These systems enable image analysis via onboard cameras and measurement of train vibrations
Image analysis
Confirmation of
environment and
overhead equipment
Sway measurement
Autonomous Drone Security
Conducting surveillance and inspection of structures and track surroundings through low-altitude, remote autonomous flight.Reducing human patrols to enhance safety and efficiency.
Future goal: Full automation of structural inspections.
Bridge Inspection (Patent Granted: Nov 2024)
On-Site / Walking Patrol (Patent Granted: Nov 2024)
Enhancing Productivity and Safety through Mechanization and Workforce Optimization
One-person operation of the track checking
vehicles (Kyushu Shinkansen)
Equipped with AI-powered cameras to automatically detect obstacles within the clearance envelope. Drivers monitor via onboard display.
Note:AI Forward Monitoring System jointly developed with Tokyo Artisan Intelligence Co., Ltd..
AI utilization reduces workforce requirements for track confirmation tasks.
Obstacle Detection
Detection of Intruding Objects
Development Case Utilizing Segmentation
Single-Operator Conversion
Outcomes of and Progress on the Future Railway Project (Future Facilities)
Optimization of railway assets using new technologies according to
transportation systems
Enhancing Safety and Convenience through Train Control Using General-Purpose Wireless Communication
Development of Wireless Train Control System
•
Introduce train control systems utilizing general-purpose wireless communication
to streamline equipment and improve safety through in-cab signal display.
Wireless Train Control System (Concept)
•
In the future, aim to enhance convenience by enabling flexible timetable
management.
Streamlining Expected Equipment
Central control unit
Wireless communication devices
Signal equipment
Cables
Level crossing controllers Activation circuits
Stop limit point
Train speed control
Level crossing control information
Train control information
Network
Current
Future
Browser implementation
Dispatcher
Announcement
Station staff
Station staff
Expansion of train operation information services
Introduction of Next-Generation Information System
Implement large LCD panels for departure indicators to improve convenience.
Considering services that allow passengers to check real-time train operation and location information anytime, anywhere via PC or smartphone.
Aim to streamline station facilities and operations while enhancing
customer service.
Outcomes of and Progress on the Future Railway Project
(Future earning methods for Railways)
Development of products and initiatives that encourage people to ride and travel
Revenue
Growth
Rail transportation revenue = Number of Passengers (New customers + Repeat
users) × Average Spend "Maximize Customer Lifetime Value (LTV)"
Expanding New Customers and Repeat Users, Driving Demand for Travel, and Maximizing LTV
Challenge: Acquire and expand new customers
Secure inbound demand effectively
Ensure fair value capture from
customers
Advance yield management
sophistication
Specific Achievements and Progress
Development of Target-Specific Product Initiatives
【Driver's License Return Going Out Ticket】
Area-limited pass for customers aged 65 and above who have returned their driver's license
Repeat Users: Build highly loyal fans for long-term relationships
Develop products that nurture core enthusiasts and enhance apps and loyalty programs
Creating events (developing purposes to generate travel demand)
Implement themed trains and initiatives that
leverage fan engagement to drive traffic
Expansion of QR ticketless services
Since the launch of this service in September 26, last year, usage has been on the rise. The service contributes to reduced workload at station counters and helps ease congestion.
Starting in July 8, we will expand coverage from the northern Kyushu area to all conventional lines limited express and D&S trains.
(Note: Does not apply to 36+3, KANPACHI/ICHIROKU, and ARU RESSHA.)
Sales Performance: Over 1,000 passes sold since July 2024
(Unit: people) 9000
September October-
December
January-
March
October
FY25.3 FY26.3
July-September
April-June
6000
3000
9月
4~6月
1~3月
10~12月
25.3期
26.3期
7~9月
10月
0
Average daily usage of QR ticketless
The proportion of QR ticketless usage among products eligible for QR ticketless service
90.0%
80.0%
70.0%
60.0%
Outcomes of and Progress on the Future Railway Project (Open Innovation)
Leveraging open innovation to explore knowledge and co-create new value
Capital and business alliance with Tokyo Artisan Intelligence Co., Ltd.
Background and objective of the capital and business alliance
We have been collaborating under the Future Railway Project since 2022, to jointly pursue technology development.
The alliance aims to further strengthen the development of AI products that contribute to labor-saving and workforce reduction under the Future Railway Project.
Partnership agreement with Plug and Play Japan Inc.
Objective in forming the partnership
To gain opportunities for co-creation with numerous global startups, and drive business transformation through fresh ideas and cutting-edge technologies beyond the scope of existing frameworks, JR Kyushu entered into a partnership agreement.
With Plug and Play Japan serving as a catalyst, the company aims to accelerate the Future Railway Project by combining its existing technologies and management resources with those of startups to co-create new mobility value.
Future outlook
We aim to strengthen collaboration through initiatives such as promoting joint development, expanding external sales, and fostering talent-including through secondments.
AI-based obstacle detection system
Shinkansen track monitoring device
Future outlook
Through collaboration, JR Kyushu will strengthen efforts toward accelerated implementation, creation of new businesses, and the exploration of next-generation products. These initiatives aim to lead to tangible, measurable results.
Demonstration test of "SPACECOOL," a radiative cooling material
Ⅳ Impact of the Future Railway Project on the Medium- Term Business PlanImpact of the Future Railway Project on the Medium-Term Business Plan
Impact of the Future Railway Project on the Medium-Term Business Plan
(Visualization of cost-specific effects, capital investment, and profit improvement impact)
Current Planned Cost-Specific Profit Improvement and Capital Investment(Target Image for 2030)
収支改 善額
Income improvement
【Capital Investment Plan for the Future Railway Project】
30
3.0
【Estimated Profit Improvement Effect (Image)】
¥14.0 billion
¥9.0 billion
¥7.0 billion
Income improvements due to the Future Railway Project
¥14.0 billion
Reductions in fixed costs due to BPR
2022
(Based on 2021 projections)
(Unit ¥bil)
15
2025 2027 2030
|Medium-Term Business Plan
2025-2027|
*The profit improvement target of ¥14 billion represents the improvement from
FY2022 post-COVID profit levels.
【Breakdown of Cost-Specific Effects (Image)】
収入
業務
動力
減価償 却
140
120
100
80
8.0
Depreciation cost
Energy cost
Outsourcing costs
Reduction in costs via technological innovation
Revenue
Revenue generation
Maintenance cost
Personnel expense
14.0
12.0
10.0
Revenue
6.0
4.0
2.0
BPR
Energy cost Depreciation cost
Operational
expenses
Maintenance Outsourcing costs
cost
Personnel
expense
Investment in growth
Operational
expenses
(Unit ¥bil)
0
1.5
2025 2026 2027 2028 2029 2030
Evolution of mobility Strengthening of operational resilience
【Structure of Profit Improvement Effects】
人件
修繕
社外委 託
社外委 託
減価償 却
人件
収入
動力
業務
修繕
60
40
20
0
Forward-Looking Statements
These materials contain forward-looking statements concerning business forecasts, targets, etc. of the JR Kyushu Group.
These statements are judgments made by the Company based on
information, projections, and assumptions available at the time of the
materials' creation.
Accordingly, please be advised that actual operating results could greatly differ from the contents of the materials due to the economic situation inside and outside Japan and the economic situation in Kyushu; real estate market conditions; the progress of respective projects; changes in laws and regulations; and a wide range of other risk factors.
IR materials can be viewed on our corporate website: https://www.jrkyushu.co.jp/company/ir_eng/library/earnings/