Koryx Copper S.a.TSXV: KRY

Koryx Copper Announces Further Positive Drill Results at the Haib Copper Project, Southern Namibia

· Issued by Koryx Copper S.a. via GlobeNewswire

Highlights

  • Assays reported for a further 9 drill holes for 4,007m of diamond drilling.

  • Consistent drill results with excellent localized higher-grade zones providing a potential opportunity for higher-grade mine scheduling within the wider mineral resource envelope.

  • Notable drill intercepts from the holes include:

  • HM103:

74m @ 0.36% Cu (66 to 140m) incl. 16m @ 0.56% Cu (106 to 122m)

  • HM102:

19m @ 0.64% Cu (204 to 223m)

  • HM107:

18m @ 0.45% Cu (12 to 30m)

  • HM104:

26m @ 0.36% Cu (220 to 246m)
214m @ 0.34% Cu (272 to 486m)

  • HM101:

62m @ 0.31% Cu (0 to 62m)
66m @ 0.37% Cu (254 to 320m)

  • HM97:

22m @ 0.31% Cu (264 to 376m)

  • HM98:

56m @ 0.33% Cu (38 to 94m)

  • HM105:

66m @ 0.32% Cu (428 to 494m)
16m @ 0.39% Cu (540 to 556m)

  • Two additional drill rigs recently arrived on site for a total of 12 active drill rigs on site presently.

  • Significant progress with PFS preparation drilling (pit and civils geotechnical) in addition to ongoing infill & expansion drilling.

  • Geological modelling and mineral resource estimation work ongoing, with the aim of publishing an updated mineral resource estimate (MRE) before the end of January 2026.

  • Engineering & met studies (power & water, infrastructure, transport logistics) and permitting activities (environmental, mining, land access) ongoing.

VANCOUVER, British Columbia, Dec. 12, 2025 (GLOBE NEWSWIRE) -- Koryx Copper Inc. (“Koryx” or the "Company") (TSX-V: KRY) is pleased to announce assay results from 9 drill holes (4,007m) received as part of the Phase 2 and 3 drill program for its 2025 exploration and project development strategy on the wholly-owned Haib Copper Project (“Haib” or the “Project”) in southern Namibia.

Haib is an advanced-stage, open pit porphyry Cu/Mo/Au project that is envisaged to produce a copper concentrate via conventional crushing/milling/flotation, with the potential for additional copper production via heap leaching. What sets it apart are its world-class geological scale, technical simplicity with no fatal flaws, scalability and predictable permitting environment in Namibia.

Heye Daun, Koryx Copper’s President and CEO commented: “The latest drill results reinforce the strong fundamentals of the Haib Copper Project, confirming consistent grades over wide intercepts like 214m @ 0.34% Cu in HM104, and delivering localized higher-grade intercepts such as 19m @ 0.64% Cu in HM102. These results provide confidence in the consistency of the metal content as well as opportunities to enhance the grade profile during the mine scheduling process. The team continues to fast track the drill programs, with 12 rigs now operating on site and undertaking varied programs, focused on resource conversion as well as advancing pit wall stability and civil construction geotechnical drilling in preparation for the PFS study which has been initiated. Also, we are fully engaged in completing the updated mineral resource estimate, which for the first time will include gold & molybdenum by-product credits plus a substantially enhanced geological interpretation and improved understanding of the geological controls of the Haib deposit.”

Plan view indicating recent drill hole locations. Assay results indicated in black shown on the long section below
Long section looking northeast showing nine drillhole intersections relative to the model for Cu mineralization
Figure 1: Plan view indicating recent drill hole locations. Assay results indicated in black shown on the long section below

Figure 2. Long section looking northeast showing nine drillhole intersections relative to the model for Cu mineralization

Discussion of Drill Results

Nine drillholes are reported across the main mineralised zone at Haib including one in Target 1, two in Target 2, four in Target 3 and two in Target 4. Approximately half are in-fill holes, while the remainder tested extensions of mineralisation around the periphery of known higher-grade zones. Most peripheral holes returned positive results, suggesting potential for localised increases in resource tonnage. Another encouraging observation is the presence of broad, Au-enriched intervals (>0.1 g/t), particularly in the northern parts of Targets 2 and 3, although their overall significance is not yet fully understood.

Target 1 Results

HM102 was collared just south of the Volstruis River in the northwest of Target 1 to test the down-dip extension of shallow higher-grade mineralisation. Cu mineralisation begins at 204m, slightly deeper than predicted, and continues to end of hole. Based on nearby drilling, this depth difference is more likely related to faulting near the Volstruis River than to a change in dip. Mo and Au are generally absent, except for a 6m interval between 206–212m averaging 0.13 g/t Au and 1.18% Cu.

Target 2 Results

HM98 was drilled northwards from the centre of Target 2, to better define the northern limit of Cu mineralisation. Results align closely with expectations with mineralisation ending at 358m (predicted 360m). Within the broad mineralised zones, Cu grades remain consistently between 0.30 and 0.35%, with higher grades restricted to isolated samples. Mo is not present in significant amounts, and Au is low overall, except for a short interval between 62 and 70m where it averages just below 0.1 g/t.

HM105 was collared southwest of Target 2 to test the westward extension of newly identified NW–SE trending Cu mineralisation along the southwestern margin of the target. A secondary objective was to determine whether Cu mineralisation intersected historically by RTZ hole HB012, located 145m to the south, extended north-eastwards. As no mineralisation had previously been modelled in this area, the positive Cu intersections represent new resource tonnage and potentially a new Cu zone. Mo is largely absent except between 40 and 114m, where it averages 0.02% (including three samples >0.1%). Gold remains at or near the detection limit (0.005 g/t).

Target 3 Results

HM97 was collared in the north of Target 4 and drilled northwards into the main Target 3 system. As expected, Cu grades are initially low and continue down to 230m, which is deeper than the current resource model. Although this suggests potential localised tonnage loss, the mineralised interval at depth is significantly wider, offsetting this. Mo increases between 198 and 338m, averaging 0.03%, including two samples >0.1% and one at 0.43%. Gold is mostly absent except for a substantial 76m interval between 590 and 660m averaging 0.17 g/t, including multiple samples exceeding 0.2–0.4 g/t and a maximum of 0.55g/t.

HM104 was also collared in northern Target 4 and drilled northwards. It intersects shallow higher-grade mineralisation consistent with holes to the south, confirming that this zone reaches surface just north of the collar. Multiple narrower Cu intervals (6 and 26m wide) occur to 246m, after which the hole enters the main Target 3 mineralisation for 214m intersection width from 272m depth. These results represent significant local tonnage gains, both within the deeper Target 3 and in the volume between Targets 4 and 3.

HM106 was drilled in the northeastern part of Target 3 and positioned to tighten hole spacing near the Shear Zone that bounds the northern extent of mineralisation. Here, Cu occurs in several moderately steep, parallel zones separated by low-grade intervals. This is reflected in HM106 where an upper barren interval is followed by Cu mineralisation between 70 and 120m with multiple narrower higher-grade zones, including a peak grade of 2.2% Cu with 0.16 g/t Au. Below 120m, Cu grades decrease but remain above 0.1%, suggesting the hole did not intersect the Shear Zone. Mo remains low throughout.

HM107 was drilled 80m north of HM106 on the same section and encountered Cu mineralisation near surface, including 12m at 0.9 g/t Au. This correlates well with HM106 and supports a southwest-dipping mineralised geometry. From 34m downward, Cu drops below 0.1% for the remainder of the hole, indicating intersection of the main Shear Zone. Mo is absent; however, between 92–104m, Au averages 0.1 g/t, and the final 2.8m sample returned 0.51 g/t Au.

Target 4 Results

HM101 was collared in the northwest of Target 4 and drilled towards Target 3. It unexpectedly intersected a relatively broad, well-mineralised Cu zone from surface to 62m, despite the resource model predicting little to no shallow Cu here. Additional higher-grade intervals extend to 106m. A 66m intersection averaging 0.37% Cu from 254m lies outside the existing higher-grade domain and, together with upper mineralisation, should contribute positively to local resource tonnage. Mo is elevated between 142 to 204m (~0.02%) and largely absent elsewhere. Gold remains at detection limit.

HM103 was collared west of HM101 and drilled towards Target 3. It also contrasts with the resource model prediction by intersecting a well-developed higher-grade Cu zone between 66 to 144m, followed by three further high-grade intervals down to 436m. At 478m, the hole enters the main Target 3 mineralisation, remaining in it to 498m. Mo is sporadic and low grade, becoming absent below 466m. Au remains at detection limit throughout.

Table of Significant Intersections

Hole#

Zone

From (m)

To (m)

Width (m)1

Cu (%)

Mo (%)

Au (g/t)

HM97

Entire Hole

0

839

839

0.16

0.007

0.029

Main

2

12

10

0.32

0.001

0.010

Main

264

376

112

0.31

0.026

0.024

Including

286

292

6

0.59

0.022

0.037

Including

322

326

4

0.53

0.254

0.069

Including

358

362

4

0.69

0.003

0.047

Main

480

494

14

0.31

0.002

0.020

HM98

Entire Hole

0

462

462

0.24

0.003

0.028

Main

0

12

12

0.30

0.002

0.018

Main

38

94

56

0.33

0.005

0.039

Main

120

138

18

0.31

0.006

0.035

Main

250

358

108

0.30

0.003

0.024

Including

280

286

6

0.48

0.003

0.026

Including

352

358

6

1.07

0.003

0.055

HM101

Entire Hole

0

417

417

0.20

0.004

0.009

Main

0

62

62

0.31

0.002

0.009

Including

20

24

4

0.49

0.004

0.004

Including

30

34

4

0.56

0.001

0.022

Main

68

82

14

0.33

0.008

0.018

Main

102

106

4

0.49

0.013

0.011

Main

150

154

4

0.39

0.021

0.008

Main

178

190

12

0.30

0.011

0.009

Main

200

208

8

0.42

0.008

0.011

Main

254

320

66

0.37

0.005

0.011

Including

278

282

4

1.19

0.001

0.011

Including

296

302

6

0.54

0.003

0.011

Including

314

318

4

0.70

0.001

0.016

Main

374

382

8

0.62

0.002

0.041

HM102

Entire Hole

0

223

223

0.16

0.001

0.021

Main

204

223

19

0.64

0.002

0.058

Including

204

212

8

1.04

0.003

0.126

HM103

Entire Hole

0

591

591

0.24

0.004

0.027

Main

66

140

74

0.36

0.006

0.015

Including

66

70

4

1.28

0.002

0.017

Including

84

92

8

0.50

0.005

0.014

Including

106

122

16

0.56

0.015

0.026

Main

152

160

8

0.37

0.002

0.029

Main

306

314

8

0.32

0.008

0.020

Main

428

436

8

0.47

0.001

0.048

Main

478

498

20

0.30

0.000

0.034

HM104

Entire Hole

0

515

515

0.25

0.008

0.022

Main

10

22

12

0.33

0.001

0.021

Main

50

56

6

0.33

0.001

0.023

Main

106

120

14

0.34

0.011

0.024

Including

118

120

2

0.76

0.001

0.040

Main

126

134

8

0.44

0.008

0.030

Including

126

128

2

0.60

0.008

0.049

Including

132

134

2

0.84

0.008

0.049

Main

220

246

26

0.36

0.005

0.027

Main

272

486

214

0.34

0.010

0.024

Including

312

316

4

0.83

0.005

0.031

Including

320

330

10

0.97

0.006

0.052

Including

338

348

10

0.65

0.007

0.030

Including

414

420

6

0.44

0.004

0.027

HM105

Entire Hole

0

657

657

0.15

0.005

0.013

Main

56

76

20

0.31

0.042

0.019

Main

428

494

66

0.32

0.002

0.018

Including

434

440

6

0.52

0.001

0.015

Including

460

464

4

0.97

0.003

0.051

Main

540

556

16

0.39

0.002

0.025

HM106

Entire Hole

0

223

223

0.16

0.002

0.022

Main

70

80

10

0.78

0.006

0.063

Including

72

76

4

1.42

0.010

0.107

Main

100

106

6

0.34

0.003

0.021

HM107

Entire Hole

0

223

223

0.10

0.001

0.040

Main

12

30

18

0.45

0.006

0.060

  1. Widths are interval widths and not true widths. The reported intervals are calculated using the following parameters:

    1. Only Cu(%) was used to determine the intervals

    2. The target composite grade is ≥0.30% Cu.

    3. Composites start and end with samples ≥0.30% Cu.

    4. Grades between 0.20% and 0.30% are included in interval but generally constitute <40% of the interval.

    5. Consecutive samples between 0.20% and 0.30% should be fewer than 5 samples (10m).

    6. Grades below 0.20% are included but generally constitute <20% of the interval.

    7. Consecutive grades <0.2% should be fewer than 2 samples (4m).