KONE OyjOMXHEX: KNEBV

Kone Oyj to equip landmark mixed-use development Vista on London’s South Bank

· Issued by KONE Oyj

Summary by 6ix AI

KONE Corporation, an elevator and escalator company, has won an order to supply elevators and escalators for the Vista development on London's South Bank, on the former ITV Television Centre site. KONE booked the order in the first quarter of 2026.

Key details

  • KONE will deliver 31 units, including elevators (KONE MonoSpace 700 DX), double-deck elevators (KONE MiniSpace HiRi DX, with KONE UltraRope technology), goods elevators (KONE Transys DX) and two KONE TravelMaster 110 escalators.
  • Vista is being developed by Mitsubishi Estate London Limited with CO-RE and built by Multiplex Construction Europe Ltd.
  • Vista will combine offices, cultural spaces and public areas, with two office buildings of 26 and 13 storeys on a six-storey podium with a roof garden; around 40% of the site will be opened to the public.
  • KONE says the development is expected to serve around 5,700 people daily.

What’s still pending

  • Installation is scheduled to begin in 2027 and is expected to be completed in mid-2029.
  • The development is targeting net-zero carbon in operation, as well as BREEAM Outstanding and WELL Platinum certifications, which are building sustainability and wellbeing ratings.

6ix AI wrote this summary from the release below and checked it against the release.

KONE Corporation, a global leader in the elevator and escalator industry, has won an order to supply a range of people flow solutions for the new Vista development on London's South Bank. The project will transform the former ITV Television Centre site into a vibrant destination combining offices, cultural spaces, and public areas.

"Complex mixed-use developments require reliable, efficient and sustainable people flow solutions," says Karla Lindahl, EVP Europe at KONE. "We are proud to contribute to this landmark project that will create new workplaces, cultural spaces and public areas in one of London's most dynamic districts."

Developed by Mitsubishi Estate London Limited with CO-RE and built by Multiplex Construction Europe Ltd, the development will feature two office buildings supported by a six-storey podium with a large roof garden.
The south office building rises to 26 storeys. The riverfront office building has 13 storeys and features a rooftop public restaurant and terrace. Around 40% of the site will be opened to the public, creating new squares and pedestrian walkways. The development is targeting net-zero carbon in operation, as well as BREEAM Outstanding and WELL Platinum certifications.

KONE will deliver 31 units, including KONE MonoSpace® 700 DX elevators, KONE MiniSpace™ HiRi DX double-deck elevators equipped with KONE UltraRope® technology, and KONE Transys DX goods elevators, as well as two KONE TravelMaster™ 110 escalators. The solutions are designed to ensure smooth and efficient people flow across the development, which is expected to serve around 5,700 people daily.

KONE booked the order in Q1 2026. Installation is scheduled to begin in 2027 and expected to be completed in mid-2029.

More information on the scheme can be found here and via Linkedin.

For further information, please contact:

Eveliina Linderborg, Senior Vice President, Communications, KONE Corporation, +358451722151, media@kone.com.

Read more:

https://www.kone.com/en/news-and-insights/releases/

3657 72UG-London 02 Aerial From East

KONE Oyj on 6ix

Earlier from KONE

Later from KONE

All KONE news releases