VANCOUVER, Nov. 7 /CNW/ - Kimber Resources Inc. (AMEX:KBX, TSX:KBR)

The main event of the month was the agreement which led to the setting
aside of the looming proxy battle. Continuation of that conflict was in
no-one's interest, certainly not that of the shareholders. Among the several
people who contributed to the resolution, I would like to pay a particular
tribute to my colleague Michael Hoole, who resigned as director solely to
facilitate a solution. I am glad to be able to report that Michael will
continue as an officer of the Company in his role as Vice President &
Corporate Secretary.
We are very pleased to be able to welcome two new and very experienced
directors. Larry Bell was appointed to the position vacated by Michael Hoole
for a term expiring at the Annual General Meeting in 2007. Leanne Baker was
appointed as a seventh director until the AGM in December, when she will be on
the board's slate of directors recommended for election.
We are now addressing priorities which could not be dealt with over the
last two months. The Company needs expertise in mine-building, which it does
not have. In particular, we need the kind of experience which has taken a
mineral deposit from a resource estimate through feasibility studies to
production. We are well served by experienced and talented consultants, but
there is no substitute for having these skills in house. We aim to engage a
senior mining engineer with experience in mine development and construction to
champion this part of the Monterde project, while our geological team
continues to explore and drill for more ounces at Carotare, El Orito, and
elsewhere.
As we have known and as shareholders have told us, the principal
disappointments of the last two months have been the non-delivery of the
pre-feasibility study in September and the delay in drilling the western
targets (Carotare and El Orito Norte).
Silver metallurgy remains the governing factor in delivery of the
pre-feasibility report on the Carmen deposit. We now know that we started the
study too soon, with only a basic understanding of silver recoveries, and
without knowing the way in which leach recoveries (some high, some low) vary
with location within the deposit. We have sent numerous samples from core
drilling and from underground to the metallurgical laboratory and this will
continue. The data from the lab is already helping us to learn more about the
recovery of silver and specifically how it varies within the deposit. Once we
have sufficient data, we will be able to estimate a delivery date (in 2007)
for the pre-feasibility study. While the characterization tests (which are
mostly encouraging) take only days to process, the only leach recovery tests
which can be used for a feasibility study are column tests, which take months.
In our pursuit of maximizing the rate of return, we also continue to review
different mining methods. These alternatives range from run-of-mine leaching
(which would probably lead to good recovery of gold but not of silver) to
milling the high grade in order to maximize silver recovery. It may also be
possible to mine simultaneously from underground and an open pit. As any
experienced miner will tell you, no two deposits are the same and each has to
be optimized in its own way.
On the basis of our current understanding of the deposit, drilling for
open pittable resources on the Carmen is complete. The smaller of the RC rigs
is working on Carotare along with the core drill. The second, larger RC
machine is too large for the narrow roads and tight switchbacks on the steep
slopes of El Orito Norte and Carotare and has been returned to the drill
contractor. We have requested its replacement with a smaller, more suitable
machine in January. In retrospect we should have started the year by spending
some four months building roads on El Orito Norte before attempting to drill.
The compressor and jacklegs added in August have led to considerable progress
in building the required access roads and drill pads. The roads on El Orito
may well join with those on Carotare during the next two months. We expect to
be back drilling on El Orito (after four holes in October) early in the new
year. Several holes were drilled on the Carotare East target in October and a
lot of progress made on access to Carotare West.
Also in October, we announced the acquisition of another property in
Mexico. This, the Pericones, was acquired because it covers at least two
targets deemed prospective for bulk tonnage silver deposits. Although we first
staked this property some time ago, we delayed announcing it until last month
because of potential title deficiencies that had to be addressed. One
geologist with a small team of local help has been working here for the past
few months. Surface sampling, trenching, and geological mapping will now be
used to locate drill sites.
The Annual General Meeting is scheduled for December 12. Notices and the
Information Circular will be mailed within the next 10 days.

Robert Longe, P.Eng
President and CEO


About Kimber

Kimber Resources Inc. holds a 100% interest in the Monterde property in
the Sierra Madre of northern Mexico. On the Monterde property, The Company is
advancing the Carmen gold-silver deposit towards production. The Carmen
deposit, an underground mine in the 1930's, is a typical low sulphidation
epithermal system, oxidized, and believed to be suitable for open pit mining.
Two adjacent epithermal systems first identified in 2005, the Carotare deposit
and El Orito Norte exploration target appear to be similar to the Carmen. The
goal of the company is to demonstrate at least three million resource ounces
from the two deposits and exploration target identified. For further
information on the company visit SEDAR or the company website at
www.kimberresources.com.

Cautionary Statement
Statements in this release may be viewed as forward-looking statements.
Such statements involve risks and uncertainties that could cause actual
results to differ materially from those projected. There are no assurances the
Company can fulfil such forward-looking statements and the Company undertakes
no obligation to update such statements. Such forward-looking statements are
only predictions; actual events or results may differ materially as a result
of risks facing the Company, some of which are beyond the Company's control.


Kimber Res Inc on 6ix

Story so far

Earlier from Kimber Res

Later from Kimber Res

All Kimber Res news releases