Kimber Res IncTSX: KBR

Kimber intersects 162 metres of grade on Carmen deposit

· Issued by Kimber Res Inc via CNW
 (TSX:KBR)

VANCOUVER, July 20 /CNW/ - The results of the following two drill holes
were not available in time to be reviewed and included in the previous news
release (July 19). One of the holes (MTR-250) could be particularly
significant.

Carmen Deposit

MTR-250 was drilled in the same direction (towards the southwest) as the
majority of holes into the Carmen deposit. Most such holes intersect
mineralized structures dipping to the north east at about 65 degrees. True
widths generally range between 65% and 85 % of the intersections reported.

<<

                                                                    Gold
                                                                    ----
Drill Hole        From        To  Interval      Gold   Silver Equivalent
----------        ----        --  --------      ----   ------ ----------
                   (m)       (m)       (m)     (g/t)     (g/t)  (g/t)(x)
MTR-250             96       258       162     1.274        36      1.69

(x)   Gold-equivalent grades assume equivalence of 85 grams of silver to
      1.0 gram of gold.

The exceptional 162 metre interval (531 feet) in MTR-250 is probably due
to a "shoot" of mineralization occurring at the intersection of two
structures: the northwest-southeast trending Cob structure, and an east-west
structure, the "Dome 2" fault. Intersections of such structures make a
significant contribution to the Carmen deposit by producing greater widths
than normal. A previous example was MTR-19 (78 m of 3.29 g/t gold & 9.1 g/t
silver) at the intersection of the Carmen structure and Dome fault.
Other shoots, some with similar grades and widths, are expected in the
Carmen deposit.

Carotare Exploration Target

CTR-15 is the most westerly step-out hole drilled on the Carotare
exploration target. The 17 holes drilled to date belong to two clusters, 12 in
the east around the discovery hole and four in the west. The distance between
the farthest holes is now 550 metres.
Intersections have been reported on all but two of the 16 holes for which
results are available.

                                                                    Gold
                                                                    ----
Drill Hole        From        To  Interval      Gold   Silver Equivalent
----------        ----        --  --------      ----   ------ ----------
                   (m)       (m)       (m)     (g/t)     (g/t)   (g/t)(x)
CTR-15              42        54        12     1.290        10      1.40

Current Activity

Drilling continues on both the Carmen deposit and the Carotare
exploration target.

Robert Longe, P.Eng.
President & CEO

Mr. Alan Hitchborn, B.Sc., Vice President Development, manages the field
program of drilling and trenching on the Monterde project. Mr. J.B. Richards,
P.Eng., Vice President Engineering, and designated Q.P. for the project is
responsible for quality control and has verified the data disclosed. He has
determined that the laboratory reports matched the drill sample logs and that
the quality control assays fall within reasonable limits. QA./QC procedures
incorporate blanks and duplicates inserted at the drill site and standards
inserted after sample preparation. Drilling is by reverse circulation. A one
eighth split of each two-metre section of the drill hole, weighing
approximately 6 kg is processed by ALS Chemex at its preparation laboratory in
Hermosillo, Mexico. Pulps are analysed by ALS Chemex at its laboratory in
North Vancouver, British Columbia, using 50 gram subsamples, fire assay with
an AA finish for gold and four-acid digestion and ICP finish for silver from a
0.4 gram subsample. Highgrade gold or silver intervals are re-assayed by fire
assay with gravimetric finish.

Statements in this release may be viewed as forward-looking statements.
Such statements involve risks and uncertainties that could cause actual
results to differ materially from those projected. There are no assurances the
Company can fulfil such forward-looking statements and the Company undertakes
no obligation to update such statements. Such forward-looking statements are
only predictions; actual events or results may differ materially as a result
of risks facing the Company, some of which are beyond the Company's control.

>>
%SEDAR: 00017718E

Kimber Res Inc on 6ix

Story so far

Earlier from Kimber Res

Later from Kimber Res

All Kimber Res news releases