TORONTO, Feb. 9 /CNW/ - Karmin Exploration Incorporated (TSX-V-KAR) is pleased to report that initial assay results have been received for 11 of 28 diamond drill holes completed in 2005 on its 28.5% owned Aripuana zinc project. Aripuana is one of the largest undeveloped zinc projects in Brazil, covering a complete mineralized massive sulphide district, with five areas of mineralization (Arex, Ambrex, Babacu, Massaranduba and Mocoto) over a 25 kilometer strike length. Karmin is a junior exploration stage mining company focused on the discovery, exploration and development of zinc projects in Brazil. Drilling Program The current drilling is part of the ongoing 15,000 metre Phase II program, of which 7,626 meters, or approximately 50% had been completed by the end of 2005 (see collar maps at http://www.karmin.com/html/properties-graphics.html). With three diamond drill rigs onsite, the Phase II program represents the largest drilling program ever mounted on the Aripuana zinc project. The Phase I program completed in 2004 consisted of 8,600 meters of drilling and included 48.4 meters of 13.2% zinc, 5.5% lead and 100 g/t silver and 14.6 meters grading 18.5% zinc, 5.5% lead and 108 g/t silver (see release of September 27th, 2005). This release summarizes the assay results reported from 10 holes at the Arex deposit and a single hole from the adjacent Ambrex deposit (see attached table). The Arex deposit contains both copper-rich and zinc-rich zones. Of the ten assayed holes at Arex, eight encountered mineralization (20, 21, 23, 25, 26, 27, 49, 50) while two (22, 24) did not, with the best holes reporting: - 7.1 m of 5.4% copper and 4.15 g/t gold in Hole 21 (copper-gold zone); - 6.0 m of 12.38% zinc, 5.67% lead, and 61.62 g/t silver in Hole 50; - 9.9 m of 9.94% zinc, 5.39% lead, and 213.88 g/t silver in Hole 26; and - 4.7 m of 15.56% zinc, 5.44% lead, and 84.74 g/t silver in Hole 27. The attached tables summarize the Phase II program to date, including all significant intercepts and details of the 28 holes completed up to the end of 2005. The Company is on schedule to complete the 15,000 m Phase II program in the second quarter of 2006. Assay results from the remaining 17 drill holes will continue to be received throughout the current year and updates provided accordingly. Additional Progress Votarantim Metais (NASQ: AAUK), Karmin's partner in the Aripuana project also reports that: - A new geological model is being constructed to calculate indicated resources and this work is expected to be completed in the first quarter of 2006. - The previously announced soil geochemical program was completed in December for a total of 144.95 line kilometres and 657 samples. The assay results are expected by mid-February. - Detailed geological mapping was completed in the Arex and Ambrex areas and in January the program will progress towards the Massaranduba area. However, the onset of the rainy season will likely result in slower progress between now and March. About Karmin Exploration: Karmin Exploration is a mineral exploration company focused on exploration and development in Brazil. Karmin is publicly traded on the TSX-Venture Exchange under the symbol KAR. The company has 33,190,434 shares outstanding and 34,790,434 fully diluted. William Fisher, P.Geo. President of Karmin, is the designated Qualified Person under NI 43-101. He has reviewed this release for accuracy. Karmin Exploration through its subsidiary Mineracao Rio Aripuana Ltda. owns 28.5% of the project, while SGV Merchant Bank owns 1.5% of the project. The remaining 70% interest in the project is owned by Anglo American PLC (LSE: AAL) and Votorantim Metais (NASQ: AAUK) is currently earning into Anglo American's interest. Karmin and SGV Merchant Bank's interests are carried until a bankable feasibility study is completed, at which time, Karmin and SGV Merchant Bank must contribute their pro-rata contributions towards bringing Aripuana into production. Votorantim is the fifth largest zinc producer in the world, with two zinc smelters in Brazil. Currently, Votorantim imports zinc concentrates from other countries. The TSX Venture Exchange neither approves nor disapproves of the information contained in this news release. FORWARD-LOOKING STATEMENTS: Except for statements of historical fact, all statements in this news release -- including, without limitation, statements regarding production estimates and future plans and objectives of Karmin are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate; actual results and future events could differ materially from those anticipated in such statements. To view table of assay results, visit here: http://files.newswire.ca/476/karmintable.doc
Karmin Exploration Update: Initial Results from Phase II 15,000 m diamond drilling campaign at ARIPUANA zinc project, BRAZIL
Story so far
Earlier from Karmin Exploration
- Karmin Exploration Inc. Announces Appointment of Vice President Exploration and Stock Option Grant: 23,600 Drilling Program Continues on Aripuana Zinc Project
- Karmin Exploration reports drill results from Aripuana project in Brazil - 15,000 metre program underway with 4 drill rigs
- Karmin Exploration Inc. - Termination of Letter of Intent to Acquire Coal Interest
Later from Karmin Exploration
- Karmin Exploration: 13 metres of 13.1% zinc and 5.4% lead from drilling at ARIPUANA zinc project, BRAZIL. Partners announce US$3 million program for 2006
- Karmin Exploration Inc. Shares for Debt Issuance
- Karmin Exploration Inc. completes Shares for Debt Issuance
- Karmin's Aripuana Zinc Project update: Scoping study and US$3.5 million program for 2007
- Karmin Exploration Inc. Update: Stock Option Grant and Acquisition of Additional 1.5% Interest in the Aripuana Project
Follow Karmin Exploration into a list and get an email when it puts out news.
Follow Karmin Exploration