MANAGEMENT'S DISCUSSION AND ANALYSIS FOR THE YEARS ENDED DECEMBER 31, 2025 AND 2024
(Expressed in Canadian dollars)
This Management's Discussion and Analysis ("MD&A"), prepared as of April 21, 2026, should be read in conjunction with the audited consolidated financial statements of Japan Gold Corp. ("Japan Gold" or the "Company") for the year ended December 31, 2025 and the notes thereto, which have been prepared in accordance with IFRS Accounting Standards ("IFRS") as issued by the International Accounting Standards Board. All amounts are stated in Canadian dollars unless otherwise indicated. Statements in this MD&A that are not historical facts are "forward-looking statements" that are subject to risk factors set out in a cautionary note contained herein. Readers are cautioned not to put undue reliance on forward-looking statements.
Japan Gold Projects
Hakuryu ProjectIn December 2025, the Company completed a 34 line-kilometre Controlled-Source Audio Magnetotellurics ("CSAMT") and natural source Audio Magnetotellurics ("AMT") geophysical survey at its Hakuryu Project in Hokkaido. The ground-based survey utilized advanced electrical techniques to produce high-resolution images of resistivity contrasts of the subsurface geology.
Subsequent to the reporting period, the survey results identified multiple resistivity anomalies that correlate with previously mapped surface alteration zones and projected vein trends. These resistivity anomalies extend across multiple survey lines, suggesting continuity along strike within the proposed target areas. The confirmation of multiple anomalies at depth along the approximately five-kilometre prospective strike length supports proceeding with drill pad preparation in advance of a planned drilling campaign to further evaluate the project area.
The Hakuryu Project is located at the southern end of the 16-kilometre-long Konomai gold field. The northern and central parts of the Konomai vein field were developed and mined by Sumitomo Metal Mining Co., Ltd. ("Sumitomo") between 1915-1973 reaching a historic production of 2.35 million ounces of gold.
Drilling at the Hakuryu Project commenced in April 2025. This first phase of drilling was comprised of three holes, with a total drilling length of 568 metres, from two drilling sites designed to test the Hakuryu No. 3 vein. Assay results indicated that two drillholes (DDH-HAK-001 & DDH-HAK-002) intersected anomalous gold mineralization. The mineralization is associated with a zone of hydrothermal brecciation which sits on the hanging wall side of a well-developed fault zone. The mineralization in both holes is associated with the same structural zone, indicating continuity of the mineral intersection over 145 metres of strike. The largely untested structural zone is part of a much more extensive corridor of alteration that extends for over 5 km.
The next stage of drill targeting will build on the encouraging 2025 drill results, including drill hole DDH-HAK-001, which returned 24.10 g/t Au over 0.60 metres, reinforcing the potential for high grade mineralization at the Hakuryu Project.
Preceding the drill program, a drone magnetic survey was completed in July 2024 over the majority of the project at 100 m spacing to further advance identification of multiple targets across the project. In addition, soil sampling was conducted for multi-element analysis and Terra-Spec analysis over the Hakuryu No.3- Yakiyama Trend. A total of 312 samples were collected.
Mizobe ProjectIn September 2025, the Company announced the next phase of diamond drilling at Mizobe. The drill program consisted of two drill holes totaling 1,156 metres intersecting gold mineralization in both holes with the first recorded intercept of a banded chalcedony vein.
The Mizobe Project is located in the Hokusatsu district of southern Kyushu, Japan, approximately 23 kilometres south of the 13Moz Hishikari Mine, operated by Sumitomo. The Mizobe Project is largely overlain by post mineralization cover; however, limited previous drilling below this cover (7 drill holes completed) confirmed the presence of anomalous gold, arsenic and antimony.
Mineralization is associated with localised zones of silicification, clay-pyrite alteration, narrow zones of hydrothermal brecciation and anomalous arsenic and antimony. This style of alteration and geochemical association is interpreted to represent the upper or peripheral parts of an epithermal system.
The drill program was designed to test for higher grade mineralization below previous intercepts, as well as to test resistivity and chargeability defined from the 2023 Induced Polarization survey. Subsequent to the reporting period, the Company announced that the drill holes totaling 1,156 metres completed at the Mizobe Project intersected gold mineralization in both holes and recorded the first intercept of a banded chalcedony vein.
Ebino ProjectThe Ebino drill program commenced in June 2025, consisting of three drill holes totalling 1,528 metres to test the Otsuka and Kuwanoki-zuru ("KZ") targets located within the Hokusatsu district in Kyushu. Located 10 kilometres north of the Hishikari Mine, drilling at Ebino aimed to assess the potential for concealed epithermal quartz veins at depth.
The Otsuka, KZ and Masaki prospects, occur along a 10 by 2.5-kilometre corridor on the east side of the project. Geological mapping, soil sampling and a ground magnetic survey were previously completed over the area. A total of 1,060 soil samples were collected, as well as a 575- km line of ground magnetics.
All three drillholes successfully intersected strong zones of hydrothermal clay alteration including structurally controlled kaolinite and dickite zones, characteristic of a shallow environment in an epithermal system. While the drilling did not intersect significant gold mineralization, the results were encouraging, as broad zones of alteration were intersected and can be used to help vector into potential epithermal targets within the vicinity of Ebino. The next phase of exploration will comprise additional target generation work within the Masaki, KZ and Otsuka alteration zones.
Togi ProjectMapping within the Togi Project confirmed the potential for concealed targets along a four-kilometre normal fault zone Northeast of the Mori vein workings. Eight line-kilometres of CSAMT geophysics were completed over the target in November 2023 highlighting resistivity features interpreted as normal faults associated with low sulfidation systems.
A two-hole (968.2 metres) drill program was completed at the Akasaka target in November 2024 targeting concealed strike extensions of the Mori vein. Drilling intersected anomalous gold within a broader gold-bearing system adjacent to historical production, warranting further exploration.
Conclusion of the Barrick Alliance
On October 31, 2025, the Company and Barrick Mining Corp. ("Barrick") mutually agreed to terminate the strategic alliance agreement (the "Barrick Alliance") dated February 23, 2020.
The Barrick Alliance was established in 2020 with the aim to jointly explore, develop and mine certain gold mineral properties and mining projects in Japan which have the potential to host Tier 1 or Tier 2 gold deposits.
Japan Gold received total funding of $23,257,218 (US$17,447,251) from Barrick for all work completed by the Barrick Alliance, primarily to create a comprehensive geochemical and geophysical database covering most of the Company's 3,000 sq km portfolio of mineral rights across Japan's three main islands.
In August 2024, the Barrick Alliance announced that it would focus its exploration activities on the Togi, Hakuryu and Ebino Projects. The Company subsequently carried out initial drill programs at each of these three projects. Three initial scout drill programs totalling 8 drill holes for 3,062 metres provided valuable geological insights, but the scale of work conducted was not sufficient to fully evaluate the potential of these projects. With the termination of the Barrick Alliance, Barrick waived any right to or interest in any of Japan Gold's portfolio of mineral rights in Japan, including the former Barrick Alliance Projects, Hakuryu, Togi and Ebino.
Japan Gold will continue to advance 2 district scale-areas in Kyushu and Hokkaido, as well as several individual projects including the former Barrick Alliance Projects, independently or through new joint ventures or partnerships.
Capital Raising Activities
Equity Financing
On August 22, 2025, the Company closed a non-brokered private placement financing of 25,845,000 common shares of the Company at a price of $0.08 per share for gross proceeds of $2,067,600, which included 17,182,500 shares sold to Equinox Partners Investment Management LLC ("Equinox"), a strategic investor and major shareholder of the Company. In connection with the financing, the Company issued 150,000 shares in finder's fees to an arm's-length finder valued at $12,000. The Company also incurred $10,870 in filing and regulatory fees and $16,320 in professional fees related to the financing.
Royalty Sale
On February 4, 2025, the Company along with its wholly-owned subsidiary JGKK entered into an investment agreement ("Investment Agreement") with Osisko Gold Royalties Ltd ("OR Royalties") to sell to OR Royalties 1.5% net smelter royalty (the "Initial Royalty") on certain Japan Gold Corp. properties and assets in Japan, now including properties that were formerly subject to the Barrick Alliance (collectively, the "Royalty Properties'), as evidenced by a royalty agreement entered into by the Company and OR Royalties concurrently with the Investment Agreement, for cash consideration of US$5,000,000.
The Royalty is a secured obligation of the Company evidenced initially by, among other things, a share pledge by the Company of JGKK's shares as well as by a guarantee from Japan Gold Corp., with a full security package to be put in place by the parties following further consultation with the applicable governmental authorities and to the extent permitted under applicable laws. Following the conclusion of the Barrick Alliance, the former Barrick Alliance Projects, Hakuryu, Togi and Ebino have now been added to the Royalty Properties. The Company has granted OR Royalties certain rights as part of the Transaction, including a right of first refusal on future royalty and stream transactions on present and future Japan Gold Corp. properties. Net proceeds of the Transaction were primarily used by the Company for the exploration, development and general advancement of the Royalty Properties, with the balance for general working capital purposes.
On the first anniversary of the Investment Agreement, or such other date mutually agreed to between the Company and OR Royalties, OR Royalties will have the option to purchase an additional 0.5% net smelter return royalty (together with the Initial Royalty, as the case may be, the "Royalty") from JGKK on the Royalty Properties, for additional cash consideration of US$3,000,000 payable by OR Royalties to the Company on such date.
Subsequent to the reporting period, the Company granted a 9-month extension to OR Royalties through an amending agreement, giving OR Royalties until November 4, 2026, to exercise the right to increase its existing royalty interest. The amending agreement includes a 30 day's notice acceleration clause if the Company enters into a joint venture agreement with a mid-tier or major mining company, and that agreement requires the partner to invest a minimum of
$5.0 million in cash proceeds into Japan Gold or the properties covered by the royalty in favour of OR Royalties, within six months of the date on which the joint venture agreement is executed.
Convertible Debentures
On April 10, 2026, the Company announced a non-brokered private placement of unsecured convertible debentures (the "Debenture") for gross proceeds of $1,390,700 (US$1,000,000) (the "Offering") to Equinox Partners Investment Management, LLC ("Equinox"), a strategic investor and major shareholder of the Company.
The Debenture will mature on the date that is three years from the date of issuance (the "Maturity Date"). The Debenture bears interest at a rate of 10% per annum (non-compounded), accruing daily but payable, in cash, only at the Maturity Date, on the occurrence of an Event of Default or upon an early redemption. The Company will have the right, at its option, to make an early redemption in cash of all or any part of the principal amount together with payment of any accrued but unpaid interest. In addition, the Company will have the right, at its election, to satisfy its obligation to pay cash to the Debenture holder through the delivery of common shares of the Company ("Shares") in lieu of cash, at a price per share which equals the greater of: (i) the most recent Market Price of the Shares on the TSX Venture Exchange ("TSXV") on the date that the accrued interest becomes payable; (ii) $0.11; and (iii) a price per security or conversion price of debt securities in a Future Financing Event. A "Future Financing Event" will be considered the most recent issuance and sale of securities by the Company in which the Company issues or sells any common shares (or units consisting of common shares and warrants), or in which the Company issues or sells any convertible debt security issued by the Company by way of a private placement during the twelve (12) month period immediately
following the closing date of the Offering, provided that such Future Financing Event results in gross offering proceeds of not less than $2,000,000.
The net proceeds from the Offering will be used for general working capital purposes. The Debenture and any securities issuable upon conversion will be subject to a statutory hold period of four months from the date of issuance of the Debenture. The Offering and conversion of the Debenture into Shares is subject to final approval by the TSX Venture Exchange.
On April 29, 2024, the Company closed a non-brokered private placement of unsecured convertible debentures (the "Debentures") for gross proceeds of $2,755,000 (US$2,000,000) to Equinox. The Debentures had an original Maturity Date of April 29, 2027, being the date that was three years from the date of issuance. The principal amount of the Debentures was convertible, at the election of the Company after the initial four month hold period prior to the Maturity Date, into common shares of the Company at a price of $0.13 per common share.
The Debentures bore interest from the date of issue until the Maturity Date or date of conversion at a rate of 10% per annum non-compounded and payable on the Maturity Date in common shares. With TSXV acceptance, all interest that was accrued in arrears on the principal amount outstanding under the Debentures was payable in common shares at a price per share which equals the greater of the 'Market Price' (as that term is defined in the policies of the TSXV) or
$0.13 on the date the accrued interest became payable.
In connection with the Debentures, the proceeds received were initially classified and recorded as equity because the Company had the ability to settle this obligation by delivering a fixed number of shares. The interest component of the convertible debt was recognized as a derivative asset and accounted for as part of the host debt contract since the interest was payable solely in shares and the interest is closely related to the principal amount. The total transaction costs amounted to $33,887, which have been recorded as share issuance costs. These costs are associated with legal fees and TSXV filing fees.
On November 7, 2024, the Company announced that disinterested shareholders approved Equinox becoming a new "Control Person" of the Company upon conversion of outstanding Debentures. The Company converted the Debentures issued to Equinox in April 2024, totalling $2,755,000 (US$2,000,000) in principal, plus accrued interest, into 22,338,738 common shares of the Company at a deemed price of $0.13 per share.
Other
The Company announced a brokered private placement disclosed in the press release dated April 14, 2025. On May 30, 2025, the private placement expired, and the engagement letter with the agents was terminated.
Leadership
On April 14, 2025, the Company appointed Jason Letto as Vice President, Exploration and Masanao Kusui as General Manager, Business Administration. Mr. Letto brings extensive geological expertise to the Company's gold exploration programs in Japan. He had previously worked at Vale for 21 years over a wide range of projects and commodities globally, including gold exploration and projects in Asia. He has a proven track record in mineral discovery, including six significant mineral deposits and additions to mineral resource inventories across Inferred, Indicated and Measured resource classifications. Mr. Kusui is responsible for managing the Company's office in Tokyo, overseeing all aspects of Japan Gold KK, including managing the prospecting rights, accounting and logistics in Japan. Mr. Kusui had previously worked for Marubeni Group, a major Japanese integrated trading and investment business conglomerate and has been with the Company for the past seven years.
The Company also announced the appointment of Fraser MacCorquodale as Senior Technical Advisor focusing on technical guidance for the Company's discovery team. Mr. MacCorquodale was previously President & COO of the Company. He is a mining expert in a variety of gold and copper deposits built through exploring and assessing over 300 global projects. Mr. MacCorquodale has over 35 years of global gold and copper exploration experience, including leading Newcrest Mining's global exploration team from 2008 to 2023, which resulted in the discoveries of Golpu Deeps, (Papua New Guinea), East Ridge (Canada), Havieron (Australia), Toguraci Deeps (Indonesia), and Seguela (West Africa). Mr. MacCorquodale is skilled in strategy development and execution, development of growth pipelines, mergers and acquisitions and targeting, built on a deep technical knowledge of epithermal gold and porphyry copper-gold deposits. He has expertise in near-mine, brownfield, and greenfield exploration across different cultural and geographical settings, including Australia, Indonesia, Papua New Guinea, Canada, USA, Ecuador, Argentina, and Chile. Mr. MacCorquodale is a recipient of the Colin Spence Award for Excellence in Global Mineral Exploration from the Association for Mineral Exploration.
On January 17, 2025, the Company appointed Cailey Barker to its Advisory Board. Mr. Barker's experience in the mining and finance industry spans over 30 years, having most recently served as Portfolio Manager at BlackRock Investment Management, where he also held concurrent roles as Head of Mining and Head of Research. Before joining BlackRock, he was a top ranked Senior Mining Analyst at several sell-side institutions including Numis Securities and Royal Bank of Canada, as well as industry consultancy Brook Hunt (now Wood Mackenzie). Mr. Barker is also an entrepreneur and small business executive who has a deep understanding of the mining industry, having started his career as an exploration geologist in Africa.
Japan Gold Corp. (TSX-V: JG) (OTCQB: JGLDF) is a Canadian mineral exploration company focused solely on gold exploration across the three largest islands of Japan: Hokkaido, Honshu, and Kyushu. The Company holds a significant portfolio of gold projects which cover areas with known gold occurrences, a history of mining, and are prospective for high-grade epithermal gold mineralization. The Company's leadership team represents decades of resource industry and business experience, and the Company has an operational team of geologists, drillers and technical advisors with experience exploring and operating in Japan and have a track record of discoveries world-wide.
Japan is considered one of the most stable and corruption-free jurisdictions in the world. The mining regulatory framework is well established and transparent with appropriate access to government officials and a comprehensive support program to facilitate stakeholder consultation. The Company deliberately selected project areas in sparsely populated areas with a history of gold mining.
On February 24, 2020, the Company announced an alliance with Barrick to jointly explore, develop, and mine certain gold mineral properties and mining projects with the potential to host Tier 1 or Tier 2 gold ore bodies. Barrick sole funded a 30 -month Initial Evaluation Phase on the majority of the Company project portfolio. Japan Gold acted as the Manager of each project, subject to Barrick's right at any time to become the Manager of a project. Barrick could identify a project as a Designated Project at any time during the Initial Evaluation Phase or the Second Evaluation Phase and elect to sole fund to completion of a pre-feasibility study ("PFS"). Upon completion of a PFS, Barrick would earn a 51% interest in the Designated Project. Barrick could elect to continue to sole fund a Designated Project following the completion of a PFS to a bankable feasibility study ("BFS"). Barrick's interest in the Designated Project at the completion of the BFS would increase to 75%. Where Barrick had elected to sole fund a Designated Project through to completion of a BFS, Japan Gold would be fully carried through completion of the BFS and retain a 25% interest in the Designated Project. On receipt of funds from Barrick, the Company records amounts received as restricted cash with an offsetting payable to Barrick. The payable to Barrick is decreased as qualifying expenditures are incurred.
On September 6, 2022, the Company announced that Barrick had selected six projects from the portfolio to continue within the Second Evaluation Phase. Barrick provided full support and solely funded all Barrick Alliance activities.
On August 19, 2024, the Company announced the advancement of the Ebino, Togi and Hakuryu projects in Japan which were under the Barrick Alliance Second Evaluation Phase. The three projects were prioritized and were advanced to being tested through drilling. The three remaining projects (Mizobe, Aibetsu and Tenryu) that did not proceed under the Barrick Alliance are now included in Japan Gold's portfolio of assets and the Company will continue to advance these projects independently. To date, Barrick funded a total of $23,257,218 (US$17,447,251). Under the Alliance, Barrick did not declare any project as a Designated Project.
On September 29, 2025, the Company announced the termination of the Barrick Alliance by mutual agreement. The effective date of the termination of the Barrick Alliance was October 31, 2025.
Under the Barrick Alliance, 3 priority projects were advanced to the drilling phase. Three initial scout drill programs totalling 8 drill holes for 3,062 metres, provided valuable geological insights, but the scale of work conducted to date has not been sufficient to fully evaluate the potential of these projects. With the termination of the Barrick Alliance, Barrick no longer holds any rights to or interest in any of Japan Gold's portfolio of mineral rights in Japan, including the former Barrick Alliance Projects, Hakuryu, Togi and Ebino.
Japan Gold will continue to advance 2 district scale-areas in Kyushu and Hokkaido, as well as several individual projects including the former Barrick Alliance Projects, independently or through new joint ventures or partnerships.
FINANCIAL SNAPSHOTDecember 31, 2025 | December 31, 2024 | December 31, 2023 | |
Total assets | $ 23,948,279 | $ 27,437,582 | $ 28,758,287 |
Working capital (1) | 2,661,402 | (70,084) | 1,954,859 |
Net loss | (4,985,884) | (4,156,605) | (3,271,587) |
Comprehensive loss | (6,246,414) | (4,561,029) | (5,361,175) |
Loss per share | (0.02) | (0.02) | (0.01) |
(1)Working capital is defined as current assets less current liabilities.
PROPERTY REVIEW AND OUTLOOKWhen the Japan Mining Act was amended in 2012 for the first time allowing foreign mineral companies the ability to hold exploration and mining permits, Japan Gold began reviewing Japan's extensive geoscientific database and historical gold production data to pinpoint areas with good exploration potential and commenced building of its exploration portfolio with its first submission of prospecting rights applications in late 2014.
Having prospecting rights applications accepted by Ministry of Economy, Trade and Industry, ("METI") reserves the land for Japan Gold and allows for active surface exploration programs such as mapping, surface sampling and geophysics. Granting of Prospecting Rights by the METI allows for more advanced forms of exploration, such as drilling. As of the date of this MD&A report the Company holds priority over 26 projects across the three main islands of Japan, for a total of 276,699 hectares. This encompasses a total of 910 prospecting rights license applications accepted by METI, of which 383 have been granted as prospecting rights licenses.
The following is a breakdown of the 383 current Prospecting Rights:
9 Prospecting Rights at the Aibetsu Project (2,840 hectares)
21 Prospecting Rights at the Bajo Project (6,332 hectares)
51 Prospecting Rights at the Ebino Project (15,741 hectares)
39 Prospecting Rights at the Gumyo Project (10,529 hectares)
3 Prospecting Rights at the Hakuryu Project (1,017 hectares)
18 Prospecting Rights at the Ikutahara Project (6,293 hectares)
20 Prospecting Rights at the Isa Project (5,959 hectares)
6 Prospecting Rights at the Kurino Project (933 hectares)
35 Prospecting Rights at the Kushikino-Iriki Project (11,163 hectares)
22 Prospecting Rights at the Mizobe Project (5,163 hectares)
20 Prospecting Rights at the Mizobe-Onoyama Project (5,125 hectares)
9 Prospecting Rights at the Mizobe West Project (2,416 hectares)
22 Prospecting Rights at the North Taio Project (7,009 hectares)
3 Prospecting Rights at the Ohra-Takamine Project (1,018 hectares)
11 Prospecting Rights at the Onoyama Project (2,784 hectares)
18 Prospecting Rights at the Onoyama-Yamagano Project (5,774 hectares)
20 Prospecting Rights at the OT-Yaeyama Project (6,175 hectares)
4 Prospecting Rights at the Tobaru Project (1,347 hectares)
37 Prospecting Rights at the Tobaru-Fuke Project (10,935 hectares)
15 Prospecting Rights at the Togi Project (3,990 hectares)
The following is a summary of work completed to date by the Company:
Ebino Project
The Ebino Project, located 10 kilometres north of the Hishikari Mine, includes three distinct prospects, Otsuka, KZ and Masaki, that occur along a 10 by 2.5-kilometre corridor on the east side of the project. Induced Polarization surveying was completed in November 2022 at the Otsuka prospect. A total of 9.4-line kilometres were completed along a 4-kilometre-long alteration zone which overlies well-defined gravity anomalies.
Several other significant alteration zones are located within the project including the Masaki, KZ and Aoki zones, distributed along the same or parallel structures to those that host the high-grade Hishikari and Okuchi gold mines. Systematic programs completed over the project by the Barrick Alliance including mapping, soil sampling and ground magnetics define an extensive epithermal alteration system. Zoned clay alteration assemblages identified including alunite + kaolinite + dickite indicate shallow level preservation and raise the potential for discovery of high-grade gold epithermal veins at depth or on the peripheries of the alteration.
The Ebino drill program commenced in June 2025, consisting of three drill holes totalling 1,528 metres to test the Otsuka and KZ targets. All three drillholes successfully intersected strong zones of hydrothermal clay alteration including structurally controlled kaolinite and dickite zones, characteristic of a shallow environment in an epithermal system. While the drilling did not intersect significant gold mineralization, the results are encouraging, as broad zones of alteration were intersected and can be used to help vector into potential epithermal targets within the vicinity of Ebino.
The next phase of exploration will comprise additional target generation work within the Masaki, KZ and Otsuka alteration zones.
Hakuryu Project
The Hakuryu Project is located at the southern end of the 16-kilometre-long Konomai gold field. The northern and central parts of the Konomai vein field were developed and mined by Sumitomo between 1915-1973 producing 2.35 Moz of gold at an average grade of 6.4 g/t1.
Mapping completed by the Barrick Alliance in 2023 focused on several vein prospects in the southern part of the project including the Hakuryu, Kokuryu, Yakiyama and Sekizen vein zones. At the Hakuryu No. 3 Vein, mapping identified vein outcrops up to 30 metres wide and 140 metres long. Discontinuous vein outcrops up to 15 metres wide and vein scree are mapped an additional 500 metres along strike to the northeast where further strike extension is covered by younger basalt lava. To the southwest of the No. 3 Vein, vein scree was sampled along a 2.3-kilometre-long section of the Yakiyama Ridge towards the Yakiyama No. 2 Vein. No production records for the Yakiyama No. 2 vein have been located; however, sampling of scattered vein floats around the rehabilitated workings has yielded up to 54.6 g/t gold. Gold grades up to 24.0 g/t were reported from float shedding off the Hakuryu No. 3 vein. These targets had not been previously drilled.
To confirm drill targeting, the Barrick Alliance completed a drone magnetic survey over the majority of the project at 100 m spacing to further advance interpretation of multiple targets across the project.
The survey proposed to map out hydrothermal alteration associated with strike extensions of the discontinuously exposed veins. Soil sampling was conducted for multi-element analysis and Terra-Spec analysis over the Hakuryu No.3- Yakiyama Trend. A total of 312 samples were collected.
Drilling at the Hakuryu Project commenced in April 2025. The first phase of drilling comprised three holes from two drilling sites, with a total drilling length of 568.2 metres, designed to test the Hakuryu No. 3 vein.
Assay highlights include:
16.15 g/t Au over 0.60 metres (Drill hole: DDH-HAK-001), from 103.8 metres (a re-assay of this interval yielded 24.10 g/t over 0.60 metres, from 103.8 metres)
1 Garwin, S.G. et al. 2005. Tectonic setting, Geology, and gold and copper mineralization in the Cenozoic magmatic arcs of Southeast Asia and the West Pacific. Economic Geology 100th Anniversary Vol. pp 891-930
1.52 g/t Au over 3.30 metres (Drill hole: DDH-HAK-002), from 164.2 metres
Assay results indicated that two drillholes (DDH-HAK-001 & DDH-HAK-002) intersected anomalous gold mineralization. The mineralization is associated with a zone of hydrothermal brecciation which sits on the hanging wall side of a well-developed fault zone. The mineralization in both holes is associated with the same structural zone, indicating continuity of the mineral intersection over 145 metres of strike. Drillhole 3 (DDH-HAK-003) targeted the same structural zone but did not intersect anomalous gold, possibly due to a structural offset from faulting. Originally planned for four drill holes totalling up to 700 metres, three holes totalling 568.2 metres were sufficient to effectively evaluate the immediate target.
The drill results confirmed anomalous gold mineralization including the presence of high-grade mineralization within a zone of well-developed faulting and brecciation. Although no primary epithermal veins were encountered, the largely untested structural zone is part of a much more extensive corridor of alteration that extends for over 5km.
In December 2025, the Company completed of a 34 line-kilometre CSAMT and AMT geophysical survey at the Hakuryu Project. The ground-based survey utilized advanced electrical techniques to produce high-resolution images of resistivity contrasts of the subsurface geology.
Subsequent to the reporting period, the survey results identified multiple resistivity anomalies that correlate with previously mapped surface alteration zones and projected vein trends. These resistivity anomalies extend across multiple survey lines, suggesting continuity along strike within the proposed target areas. The confirmation of multiple anomalies at depth along the approximately five-kilometre prospective strike length supports proceeding with drill pad preparation in advance of a planned drilling campaign to further evaluate the project area.
Togi Project
The Togi Project is located in the central west part of Honshu Island on the Noto Peninsula covering the historic Togi goldfield. Gold mineralization was discovered in the Togi area in 1896, and historic records report seven separate areas of workings along a 7-kilometre trend which produced a combined 48,000 ounces of gold and 180,000 ounces of silver between 1910-2112. A similar geological setting is noted 160 kilometres along strike to the northeast on Sado Island, which hosts Japan's second largest gold mine, the Sado Mine with production of 2.5 million ounces of gold and 74 million ounces of silver prior to its closure in 19743.
In Q2, 2023, mapping was completed at the Togi Project confirming the potential for concealed targets along a four-kilometre normal fault zone NE of the Mori vein workings. Deposits mined in the project area are divided into the Urugami deposits in the southwest and Hirochi deposits in the northeast, the latter now falling within a newly defined 'Akasaka target' area. The Mori vein within the Akasaka target produced 16,500 ounces of gold at an average grade of 14 g/t gold and is reported to be up to 4 metres wide, with gold values ranging between 8 to 20 g/t gold1. Records show the mineralization at lower mine levels open at depth with average grades of 8.12 g/t gold and 56.9 g/t silver4;workings did not exceed 120 metres portal level.
Exploration by the Barrick Alliance was focused on searching for the strike extensions of the Mori vein obscured by post mineralization cover. Geological mapping of the potential strike extent identified sinter scree, and mineralized quartz vein boulders and cobbles hosting gold grades up to 79.7 g/t gold. SMAT geophysics was used to help target within the area of cover at the Akasaka target, and surveying was completed along a 2-kilometre section of the Mori fault. The survey highlighted
2 Garwin, S. L., Hall, R., & Watanabe, Y. (2005).
Tectonic setting, geology, and gold and copper mineralization in Cenozoic magmatic arcs of Southeast Asia and the West Pacific. [Supplementary Appendix 2].
3 Garwin, S. L., Hall, R., & Watanabe, Y. (2005).
Tectonic setting, geology, and gold and copper mineralization in Cenozoic magmatic arcs of Southeast Asia and the West Pacific. [Supplementary Appendix 2].
4 Gold Mines of Japan, 1989. The Mining & Materials Processing Institute of Japan
resistivity features which may represent vein targets. An initial 968.2-metre 2-hole drill program to test the Akasaka target commenced in September 2024 and was completed in November 2024.
Two drill holes located 700 metres along strike of the Mori workings and spaced 350 metres apart targeted vein extensions below concentrations of sinter scree, and quartz vein boulders and cobbles hosting gold grades up to 79.7 g/t gold. Drilling intersected parallel alteration zones representing inferred structural extensions of the Mori fault and Mori vein hanging-wall structures concealed by up to 140 metres of syn to post mineralization andesite and conglomerate. Alteration intersected hosts low-temperature clay assemblages and spaced narrow opaline to chalcedonic-carbonate-sulphide veins anomalous in pathfinder elements including gold. Drilling intersected anomalous gold within a broader gold-bearing system adjacent to historical production, warranting further exploration.
References1The Mining and Materials Processing Institute of Japan (1989) Gold Mines in Japan Vol.1
Ikutahara Project
The Ikutahara Project consists of 21,332-hectares, which includes 6,293 hectares of prospecting rights and 15,039 hectares of prospecting rights application. Located 20 kilometres southeast of the historic Konomai mine in north Hokkaido, the Ikutahara Project hosts 17 historic gold mines and workings including the Kitano-o mine (1924-43) which produced 96,450 ounces5 of gold from surficial eluvial placers associated with sinter deposits and sub-sinter epithermal veins.
The Ryuo Prospect located in the northwest of the Ikutahara project hosts five areas of historical workings along a 1 km open ended zone of alteration and mineralization. Drilling in 2021-22 encountered high-grade extensions below the historical Jinja workings including: 4.9 metres @ 12.1 g/t Au and 33 g/t Ag (IKDD21-001); and IKDD21-010: 20 m @ 6.3 g/t Au and 15.7 g/t Ag, including 5 metres @ 15.2 g/t Au and 13.1 g/t Ag (IKDD21-010). Additional high-grade intersections were encountered up to 750 metres further along strike including 0.45 metres @ 1,395 g/t Au and 768 g/t Ag (IKDD21-008) and 1.00 metre @
30.0 g/t Au & 284.0 g/t Ag (IKDD21-007). The mineralization at Ryuo is hosted within an elongate ~1-kilometre-long window of pre-mineral geology, and late or post-mineral rhyolite lava encloses and overlies potential strike extensions. Two phases of soil grids were completed in 2021 and 2022 to test for concealed extensions, this work identified areas of silicification and pathfinder element anomalism in the northeast & southeast corners of the 4.5 by 3.5-kilometre grid area which remain open and require further follow up.
Important insights gained from the drilling at Ryuo to date include the identification of high-grade gold events across the prospect, wide high-grade mineralized vein structures, and the intimate relationship of certain rhyolite phases with mineralization. The down-plunge extension of the Jinja shoot along the rhyolite dome margin remains open and post-mineral faulting across the prospect has off-set of vein-zone extensions that require further modelling.
Upon completion of drilling at Ryuo in 2022 operations shifted to the east side of the Kitano-o prospect where three 700-metre-deep drill holes were completed to target the source of 96,000 ounces of gold mined from the paleosurface sinter at Kitano-o6.The initial scout drill holes at east Kitano-o targeted combined geochemical and geophysical anomalies below historic workings and adjacent to major graben and rhyolite dome structures proximal to the Cretaceous basement interface.
Drilling, to date, has not yielded a source for the significant amount of gold precipitated at the paleo-surface. With a more complete geochemical coverage from soil sampling, it is now interpreted that these gold-bearing paleo-surface expressions are de-coupled from structures hosting the boiling-zone vein systems developed at depth.
5 A Tectonic Model for Epithermal Au Mineralization in NE Hokkaido, Japan. Yasushi Watanabe. Resources Geology Special Issue, No. 18, p. 261-263, 1995. Tectonic setting, geology, and gold and copper mineralization in Cenozoic, magmatic arcs of Southeast Asia and the West Pacific. Garwin, S.L., Hall, R., & Watanabe, Y. (2005). [Supplementary Appendix 2].
6 A Tectonic Model for Epithermal Au Mineralization in NE Hokkaido, Japan. Yasushi Watanabe. Resources Geology Special Issue, No. 18, p. 261-263, 1995. Tectonic setting, geology, and gold and copper mineralization in Cenozoic, magmatic arcs of Southeast Asia and the West Pacific. Garwin, S.L., Hall, R., & Watanabe, Y. (2005). [Supplementary Appendix 2].
Between 2020 and 2022 composite soil samples were collected along a 7-kilometre-long section of a major deep-seated graben fault which bounds the east side of the Kitano-o gold district and localizes the majority of epithermal mineralization in the project. The presence of both sinter material at Kitano-o and of numerous areas of steam-heated clay alteration with coincident gold and path-finder elements indicate at least three fully preserved epithermal systems are developed at depth within the district.
A careful screening of the soil geochemical data combined with other data sets was required to define deeper boiling-zone targets. Three new target areas have been defined based on their supporting multi-element pathfinder signatures which are up to 1.5 kilometres in strike length and remain open off the soil grid. The two highest priorities are located west of the Ikutahara-Showa mines and lie along linear strike extensions of known veins sets mapped at surface. A third more subtle anomalous zone, in the northern part of the district, lies along the southern edge of a large rhyolite dome, and is further supported by fine-grained chalcedonic vein and sinter float trains.
To further advance the Showa-Ikutahara mine strong gold and pathfinder element anomalies an 11-line kilometre CSAMT survey was completed over the prospects in Q4, 2023. The CSAMT data identified thick resistive features below the anomalous soils, potentially indicating widespread silicification associated with a concealed vein system. This area is near drill ready and will be advanced based on permits and funding.
On December 14, 2022, the Company announced the completion of the drilling activities at the Saroma prospect, where six initial scout drill holes tested a 1-kilometre section of the Saroma vein. The Saroma vein is located at the northeast end of an open-ended 3.5-kilometre-long mineralized structure defined by the Saroma, Chitose and Taiho mine workings.
Multiple veins hosting high-grade silver, and gold mineralization were successfully intercepted in all six drill holes with vein widths up to 8 metres (true width). Quartz veining exhibits impressive chalcedony-rich low-sulphidation epithermal vein textures, indicating good preservation of the vein system and potential to depth and along strike.
Reconnaissance mapping along the Saroma structure at the Chitose and Taiho workings confirmed banded chalcedony vein outcrops up to 5 metres wide with broad silicification envelopes and surface and rock samples up to 10.85 grams per tonne gold. The historical Jomon workings located another 5 kilometres southwest of the Taiho workings lie on an inferred continuation of the Saroma structure. Reconnaissance mapping completed along the 9-kilometre-long open-ended structure between Saroma and Jomon successfully identified areas of alteration and float of high-level vein material up to 54 g/t gold. A soil grid was commenced, and geochemical results have identified several gold and pathfinder anomalies along the corridor which remain open-ended. Further work is now required to define and expand extensions towards drill targeting along this potentially significant vein hosting structure.
Mizobe Project
The Mizobe Project is located in the Hokusatsu Region of Southern Kyushu in a similar geological setting to the Hishikari Mine, located 23 kilometres to the north. The Mizobe Project is largely overlain by post mineralization cover. However, limited previous drilling below this cover (7 drill holes completed) has confirmed the presence of anomalous gold, arsenic and antimony. The extent and source of mineralization are yet to be determined.
An Induced Polarization "IP" geophysical survey comprising 14.6-line kilometres was completed over the eastern part of the Mizobe Project in September 2022 aimed at mapping subsurface chargeability and resistivity features below a thin veneer of post-mineral volcanic ash, potentially representing buried mineralization and surrounding alteration haloes.
An initial three framework drill holes were commenced in February 2023 targeting interpreted structural extensions below post-mineral volcanic ash on large step-outs between 600 to 1,000 metres from known surface mineralization and historical drilling data. Drilling encountered the following significant mineralized interval from MZDD23-003:
144.0 m @ 0.7 g/t Au & 2.1 g/t Ag from 47.0 m; including: 68.25 m @ 0.9 g/t Au & 2.1 g/t Ag and;
16.0 m @ 2.8 g/t Au & 4.5 g/t Ag; and,10.0 m @ 4.3 g/t Au & 6.6 g/t Ag.
A second round of drilling at Mizobe completed in Q4, 2023 comprised an additional four diamond holes on large, up to 500-metre step-outs around the long-mineralized intercept in MZDD23-003. All drill holes continued to encounter hydrothermal alteration with the best interval from drill hole MZDD23-004:
33.55 m @ 0.6 g/t Au & 3.1 g/t Ag from 28.3 m; including: 12.0 m @ 1.0 g/t Au & 4.5 g/t Ag
Multiple alteration and mineralizing events are observed in the drill core including banded chalcedony-sulphide vein clasts, banded carbonate-quartz-sulphide veins, and hydrothermal brecciation which has provided a permeability pathway and host for a younger gold-sulphide mineralization event. Banded chalcedony is a quartz vein texture that may represent the upper parts of epithermal vein systems, fragments of this banded chalcedony now incorporated into a younger mineralized hydrothermal breccia provide a vector towards potential deeper structure-controlled vein-style mineralization not yet identified.
The next phase of drilling commenced in September 2025 with 2 drill holes totaling 1,156 metres. The drill program was designed to test for higher grade mineralization below previous intercepts, as well as to test resistivity and chargeability defined from the 2023 Induced Polarization survey. Subsequent to the reporting period, the Company announced that it intersected gold mineralization in both holes and recorded the first intercept of a banded chalcedony vein. A program is currently being planned for additional follow up work and drill testing.
Bajo Project
The Company will prioritize the advancement of its Bajo Project with the launch of a 3D Induced Polarization ("3D IP") and resistivity geophysical survey to identify and refine drill targeting for future drill programs. The Bajo Project contains the historic Bajo Mine in Middle Kyushu, which historically produced approximately 421,000 ounces of gold7. The majority of production came from the Sakuru-Hi vein, which reportedly yielded grades of 125.9 g/t Au and 557 g/t Ag1.
Other Projects
In addition to advancing the Mizobe, Ebino, Hakuryu and Togi Projects, the Company completed a review of additional projects that exhibit strong exploration potential. These include: Aibetsu and the Ikutahara-Kanehana District in Hokkaido; Bajo and North Taio in Middle Kyushu; and Fuke and Tobaru in Southern Kyushu. The Company continues to seek additional relationships and foreign investment to advance the Japan Gold project portfolio.
SUMMARY OF QUARTERLY RESULTS | ||||
December 31, | September 30, | June 30, | March 31, | |
2025 | 2025 | 2025 | 2025 | |
Total assets | $23,948,279 | $26,346,220 | $26,151,957 | $27,546,800 |
Working capital | 2,661,402 | 4,576,811 | 3,657,690 | 5,493,320 |
Net loss | (1,017,767) | (1,189,438) | (1,222,949) | (1,555,730) |
Basic and diluted loss per share | (0.00) | (0.00) | (0.00) | (0.01) |
December 31, | September 30, | June 30, | March 31, | |
2024 | 2024 | 2024 | 2024 | |
Total assets | $27,437,582 | $29,042,593 | $27,553,680 | $26,531,802 |
Working capital | (70,084) | 1,328,957 | 2,333,197 | 827,443 |
Net loss | (1,826,403) | (1,031,657) | (1,049,599) | (874,309) |
Basic and diluted loss per share | (0.01) | (0.00) | (0.00) | (0.00) |
*June 30, 2024 and September 30, 2024 numbers have been restated on pages 20-21.
7 Mining and Materials Processing Institute of Japan (1989), Gold Mines in Japan, Vol. 1: Kyushu, pp. 34-37
The Company continues to explore and capitalize exploration and evaluation expenditures related to the Company's exploration
and drilling programs. As at December 31, 2025, the Company has capitalized a total of $20,372,360 (December 31, 2024 -
$26,299,033) of exploration and evaluation expenditures. This decrease is due to the sale of 1.5% in net smelter royalties to Osisko on the Company's projects which resulted in a reduction of $7,029,050 against exploration and evaluation assets. Working capital increased from $(70,084) deficiency at December 31, 2024, to a working capital of $2,661,402 at December 31, 2025 as a result of the US$5,000,000 received from Osisko and non-brokered private placement financing.
RESULTS OF OPERATIONS FOR THE THREE MONTHS ENDED DECEMBER 31, 2025During the three-month period ended December 31, 2025, the Company incurred a net loss of $1,017,767 compared to a net loss of $1,826,403 for the three-month period ended December 31, 2024. Significant changes occurred in the following categories:
The Company recognized project evaluation costs of $273,392 (December 31, 2024 - $207,054) on activities related to the Japan Gold KK projects.
The Company recorded share-based compensation of $155,697 related to stock options and RSUs granted in the three-month period (December 31, 2024 - $142,860).
The Company recognized lower professional fees of $25,784 (December 31, 2024 - $178,986 due to costs related to financing activities) during the period.
RESULTS OF OPERATIONS FOR THE YEAR ENDED DECEMBER 31, 2025During the year ended December 31, 2025, the Company had a net loss of $4,985,884 compared to a loss of $4,156,605 for the year ended December 31, 2024. Significant changes occurred in the following categories:
The Company recognized project evaluation costs of $1,014,120 (December 31, 2024 - $824,203) on activities related to the Japan Gold KK projects.
The Company recorded share-based compensation of $882,818 related to stock options and RSUs granted during the year (December 31, 2024 - $246,153).
The Company incurred occupancy and office costs of $150,048 during the year ended December 31, 2025 (December 31, 2024 - $317,616).
The Company recognized higher professional fees of $555,668 (December 31, 2024 - $368,528) due to costs related to royalty sale and financing activities during the period.
The Company recognized higher investor relations costs of $669,869 (December 31, 2024 - $445,399) due to increased shareholder engagement initiatives.
The Company recorded an impairment charge of $Nil relating to the relinquishment of certain projects during the year (December 31, 2024 - $206,142).
The Company incurred $1,381 in interest expense in connection with the related party loan (December 31, 2024 -
$144,921 in interest expense in connection with the convertible debt).
The Company incurred $126,000 in financing expense in connection with the related party loan (December 31, 2024
- $Nil).
LIQUIDITY AND CAPITAL RESOURCESThe Company's cash and cash equivalents as at December 31, 2025, were $2,969,607 which was an increase from $80,230 as at December 31, 2024. As at December 31, 2025, the Company has working capital of $2,661,402 compared to a working capital deficiency of $70,084 as at December 31, 2024.
Net cash used in operating activities for the year ended December 31, 2025, was $3,561,969 compared to net cash used of
$3,352,612 during the year ended December 31, 2024. The cash used in operating activities reflected the Company's efforts in
continuing to build and assess its project portfolio during the period.
Net cash from investing activities during the year ended December 31, 2025, was $4,670,926 resulting from the sale of royalty compared to net cash used of $1,191,565 during the year ended December 31, 2024. This primarily reflects expenditures to advance the Company's key projects and evaluate additional opportunities within its portfolio, in contrast to the prior year's focus on Alliance projects, which were funded by Barrick.
Net cash from financing activities during the year ended December 31, 2025 was $2,040,410 resulting from the equity financing during the year (December 31, 2024: $2,721,114, resulting from the convertible debenture financing).
These consolidated financial statements have been prepared on the basis of accounting principles applicable to a going concern, which assumes that the Company will continue its operations for the foreseeable future and will be able to realize its assets and discharge its liabilities in the normal course of operations as they become due. The Company has not generated any revenues or cash flows from operations to date. For the year ended December 31, 2025, the Company incurred negative cash flows from operations of $3,561,969 and recorded a net loss of $4,985,884. The Company's ability to continue as a going concern is dependent on its ability to successfully raise additional financing, entering into a joint venture, sale of all or a portion of the Company's assets, the outright sale of the Company, the successful development of the Company's mineral property interests, or a combination thereof. The Company believes that it will be able to continue as a going concern for the foreseeable future based on the Company's historical and anticipated ability to raise additional financing to further advance its projects. However, the Company will continue to incur negative cash flows from operations and the Company will require additional funding in the future. Although the Company has been successful in the past in obtaining financing, there is no assurance that it will be able to obtain adequate financing in the future or that such financing will be on terms acceptable to the Company. These factors indicate the existence of a material uncertainty that may cast significant doubt upon the Company's ability to continue as a going concern. These consolidated financial statements do not give effect to any adjustments that would be necessary to the carrying values and classification of assets and liabilities should the Company be unable to continue as a going concern. Such adjustments could be material.
RELATED PARTY TRANSACTIONS Key management and personnel compensationKey management personnel include the officers and directors of the Company. Key management compensation and amounts paid to companies controlled by key management consists of the following:
During the year ended December 31, 2025, the Company incurred $516,000 (December 31, 2024: $468,000) in management fees and $312,400 (December 31, 2024: $210,300) in consulting fees for administrative, finance and accounting services to a private company controlled by the Chief Executive Officer of the Company. The Company also reimbursed such private company $147,897 in occupancy costs during the year ended December 31, 2025 (December 31, 2024: $106,566). As at December 31, 2025, $Nil (December 31, 2024: $Nil) of these fees were outstanding and payable to the officer. During the year ended December 31, 2025, the Company recorded $2,462 (December 31, 2024: $2,421) in other income relating to a private Japanese entity controlled by the Chief Executive Officer. As at December 31, 2025, $4,883 (December 31, 2023: $2,421) was receivable to the Company.
The Company incurred $97,667 in project evaluation (December 31, 2024: $Nil) to the VP Exploration of the Company. As at December 31, 2025, $Nil (December 31, 2024: $Nil) of these fees were outstanding and payable to the officer.
The Company incurred $129,449 in project evaluation (December 31, 2024: $66,100 in consulting fees) to the Chief Operating Officer (previously General Manager of Exploration). As at December 31, 2025, $13,358 (December 31, 2023: $5,085) of these fees were outstanding and payable to the officer.
The Company incurred $153,467 (December 31, 2024: $153,566) in director fees to directors of the Company. As at December 31, 2025, $Nil (December 31, 2024: $42,150) of these fees were outstanding and payable to the directors.
The Company incurred $446,207 (December 31, 2024 - $227,284) in share-based compensation expense to related parties.
Other related party transactionsOn January 14, 2025, the Company entered into a loan agreement for $140,000 with a director of the Company. The loan was repayable in full by March 18, 2025, or such earlier date as the Company may elect, and bears interest at a rate of 12% per annum. The Company used the proceeds of the loan for short-term working capital purposes.
The loan was fully repaid on February 13, 2025 for total cash consideration of $141,381, which included contractual interest of
$1,381.
In connection with the loan, the Company granted 2,000,000 non-transferable share purchase warrants exercisable at $0.07 per share for a period of 12 months. The warrants were subject to TSX Venture Exchange approval and were issued on March 19, 2025.
As the warrants were approved and issued after the loan had been fully repaid, the loan and warrants were accounted for as separate transactions. The warrants were measured at fair value on March 19, 2025 using the Black-Scholes option pricing model, resulting in a value of $126,000, which was recognized as a financing expense with a corresponding increase in contributed surplus.
The valuation incorporated key assumptions including a share price of $0.125, an exercise price of $0.07, an expected life of one year, volatility of approximately 70%, a risk-free interest rate of approximately 3%-4%, and no expected dividends.
CURRENT SHARE DATAAs at the date of this MD&A, the Company had 307,249,217 common shares issued and outstanding.
The following table summarizes information about the share options outstanding as at the date of this MD&A:
Outstanding | Weighted average exercise price | Expiry date | Weighted average remaining life (years) |
900,000 | $ 0.40 | September 15, 2026 | 0.40 |
250,000 | $ 0.16 | December 13, 2028 | 2.64 |
1,180,000 | $ 0.20 | January 24, 2029 | 2.76 |
1,000,000 | $ 0.30 | May 13, 2030 | 4.06 |
590,000 | $ 0.35 | December 23, 2026 | 0.67 |
200,000 | $ 0.20 | April 10, 2029 | 2.97 |
1,200,000 | $ 0.20 | April 11, 2029 | 2.97 |
2,235,000 | $ 0.13 | January 19, 2030 | 3.75 |
7,555,000 | $ 0.23 | 2.81 |
As at the date of this MD&A, 7,555,000 of the options are outstanding where 7,155,000 of the options are exercisable with a weighted average exercise price of $0.23.
The following table summarizes information about the RSUs outstanding as at the date of this MD&A:
Outstanding | Share price on date of grant | Expiry date | Weighted average remaining life (years) |
1,561,682 | $ 0.12 | April 11, 2027 | 0.97 |
9,750,000 | $ 0.08 | November 7, 2026 | 0.54 |
150,000 | $ 0.07 | January 16, 2027 | 0.73 |
950,000 | $ 0.09 | January 20, 2027 | 0.75 |
900,000 | $ 0.13 | March 26, 2027 | 0.92 |
384,615 | $ 0.12 | May 1, 2027 | 1.02 |
13,696,297 | 0.65 |
As at the date of this MD&A, the Company has no warrants outstanding.
RISKS AND UNCERTAINTIESThe Company's business could be significantly adversely affected by certain external risks that could adversely affect the economies and financial markets of many countries, resulting in an economic downtown that could affect the Company's products and likely impact operating results. These factors may impact the Company's ability to obtain financing or third parties' ability to meet their obligations with the Company.
The nature of the Company's operations exposes the Company to liquidity risk, credit risk and market risk, which may have a material effect on cash flows, operations and comprehensive income.
The Company's risk management policies are established to identify and analyse the risks faced by the Company, to set appropriate risk limits and to monitor market conditions and the Company's activities. The Board of Directors has overall responsibility for the establishment and oversight of the Company's risk management framework and policies.
Liquidity risk is the risk that the Company is not able to meet its financial obligations as they fall due. The Company ensures that there is sufficient capital in order to meet short term business requirements after taking into account the Company's cash and cash equivalents. All of the Company's financial liabilities, are classified as current. The Company's approach to managing liquidity risk is to ensure as far as possible that it will have sufficient liquidity to meet liabilities when due.
Credit risk - Financial instruments that potentially subject the Company to credit risk consist of cash and cash equivalents, restricted cash, deposits and accounts receivable. The Company limits its credit exposure on cash and cash equivalents and restricted cash by holding its deposits mainly with high credit quality financial institutions as determined by credit agencies. The carrying value of these financial assets represents the maximum exposure to credit risk. The Company has no history of credit loss and no allowance for credit loss recorded at December 31, 2025 and December 31, 2024.
Market risk is the risk of loss that may arise from changes in market factors such as interest rates, foreign exchange rates, and commodity and equity prices. The Company is currently exposed to interest rate risk to the extent that the cash and short-term investment maintained at the financial institutions are subject to a floating rate of interest. The interest rate risk on the Company's cash and short-term investment is not significant.
The Company operates in Japan and is subject to foreign currency fluctuations primarily on its cash and accounts payable and accrued liabilities denominated in a currency other than Japanese yen ("Yen or ¥"). As at December 31, 2025, this exposure is minimal. Additionally, the Company is exposed to foreign exchange risk on non-Canadian denominated monetary assets and liabilities recorded in Japan. As at December 31, 2025, every 1% change in foreign exchange rate in either direction would result in a change in net loss of approximately $2,600.
Fair valueIFRS requires disclosure about fair value measurements for financial instruments and liquidity risk using a three-level hierarchy that reflects the significance of the inputs used in making the fair value measurements. The three-level hierarchy is as follows:
Level 1 - Unadjusted quoted prices in active markets for identical assets or liabilities;
Level 2 - Inputs other than quoted prices that are observable for the asset or liability either directly or indirectly; and
Level 3 - Inputs that are not based on observable market data.
The carrying values of the Company's cash and cash equivalents, restricted cash, accounts receivable, deposits and accounts payable and accrued liabilities approximate their fair values due to their short terms to maturity.
Other risk factorsIndustry
The Company is engaged in the acquisition and exploration of resource properties, an inherently risky business, and there is no assurance that an economic mineral deposit will ever be discovered and subsequently advanced to production. Most exploration projects do not result in the discovery of economically mineable deposits. The focus of the Company is on areas in which the geological setting is well understood by management.
Gold and other metal prices
The price of gold is affected by numerous factors beyond the control of the Company including central bank sales, producer hedging activities, the relative exchange rate of the US$ with other major currencies, demand, political and economic conditions and production levels. In addition, the price of gold has been volatile over short periods of time due to speculative activities. The prices of other metals and mineral products for which the Company may explore all have the same or similar price risk factors.
Permitting risk
The Company operates under the Mining Act (established in 1950) as amended in 2011 (implemented in 2012). Under the Mining Act, the Company has applied for prospecting rights which once granted, are valid for a maximum of 6 years. When prospecting rights applications are made and accepted for filing by the Ministry of Economy, Trade and Industry (METI) but prior to granting (the reservation period), the applicant has the exclusive opportunity to do early-stage exploration work including mapping, geology, geochemistry and geophysics but not trenching or drilling. There is no fixed timetable for the reservation period. Once granted, the prospecting rights may be converted to digging rights (mining rights). If not converted or in the process of being converted, prospecting rights will expire at the end of a 6-year period. There is no guarantee that the Company will be able to satisfy the requirements to covert its prospecting rights to digging rights within the defined 6-year time frame. The Company may reapply for expired prospecting rights on the same basis as new applicants but would not have any priority when doing so. Prospecting rights applications are processed on a "first to file" basis unless applications are submitted by multiple parties at the same time in which case applications will be subject to a lottery. The Company retains priority over new third-party prospecting rights applicants by submitting applications to convert its existing prospecting rights to digging rights prior to the expiry of the granted prospecting rights. This priority right remains in place until the digging rights are granted, or the application is rejected. The Company's project portfolio currently has 910 prospecting right applications accepted by METI. Of the 910 prospecting rights applications, 383 prospecting rights have been granted, in several batches, on 26 projects, enabling advanced exploration including drilling. The currently granted prospecting rights expire from 2025 through 2032. The Company work programs and budgets are designed to advance exploration on prospecting rights to prepare for potential conversion to digging rights.
Overall, the Company's mineral exploration activities are subject to receiving and maintaining licenses, permits and approvals from appropriate governmental authorities in Japan. The Company may be unable to obtain on a timely basis or maintain in the future all necessary permits to explore and develop its properties. Delays may occur in connection with obtaining necessary renewals or permits for the Company's existing operations and activities, additional permits for existing or future operations or activities, or additional permits associated with new legislation.
Ability to raise funding
The Company has no revenues from operations and expects to incur operating losses in future periods due to expenses associated with advancing its mineral projects, seeking new business opportunities and working capital costs. The Company has finite financial resources and its ability to advance its mineral projects will depend significantly upon its ability to secure near and long-term financing. There are no assurances that any financing alternative will be successful or that financing will be available at all or acceptable terms. These financing requirements will result in dilution of existing shareholders and the inability to obtain such financing may result in delay or postponement of the Company's activities.
Geopolitical risk
The Company recognizes the inherent uncertainties associated with geopolitical risks. Events such as trade disputes, changes in government policies, and regional conflicts may adversely impact various sectors of the economy, including but not limited to, financials, energy, metals and mining. These risks may result in disruptions to supply chains, fluctuations in currency exchange rates, and changes in demand for the Company's products and operations. As a result, the Company's business, financial condition, and results of operations may be negatively affected by economic and other consequences from geopolitical developments.
Climate change risk
The Company acknowledges the importance of addressing climate change risks. Environmental concerns, regulatory changes, and shifting consumer preferences toward sustainability could impact the Company's operations and business. Physical climate change risks such as extreme weather events and transition risks related to regulatory shifts and market preferences are considerations. The Company is committed to evaluating and managing our environmental footprint, pursuing sustainable practices, exploring innovative technologies to minimize environmental impact and staying informed about evolving climate-related regulations.
Global economic conditions
The unprecedented events in global financial markets in the past several years have impacted the global economy where many industries, including the mining industry, are impacted by these market conditions. Market events and conditions, including disruptions in the international credit markets and other financial systems could impede the Company's access to capital or increase the cost of capital which may adversely affect the Company's operations.
MATERIAL ACCOUNTING POLICIESReference should be made to the Company's material accounting policy information contained in Note 2 of the Company's consolidated financial statements as at December 31, 2025. These accounting policies can have a significant impact on the financial performance and financial position of the Company.
Significant accounting judgments and estimatesThe preparation of the consolidated financial statements requires management to make certain estimates, judgments and assumptions that affect the reported amounts of assets and liabilities at the date of the financial statements and reported amounts of expenses during the reporting period. Actual outcomes could differ from these estimates. The financial statements include estimates that, by their nature, are uncertain. Revisions to accounting estimates are recognized in the period in which the estimate is revised and future periods if the revision affects both current and future periods. These estimates are based on historical experience, current and future conditions and other factors, including expectations of future events that are believed to be reasonable under the current circumstances.
Estimation of uncertainty
Significant assumptions about the future and other sources of estimation uncertainty that management has made at the end of the reporting period, which could result in a material adjustment to the carrying amounts of assets and liabilities in the event that actual results differ from assumptions made, relate to, but are not limited to, the following:
The application of the Company's accounting policy for exploration and evaluation expenditure and impairment indicator evaluation requires estimates in determining whether it is likely that future economic benefits will flow to the Company, which may be based on assumptions about future events or circumstances. Estimates and assumptions made may change if new information becomes available. If, after an expenditure is capitalized, information becomes available suggesting that the recovery of the expenditure is unlikely, the amount capitalized is written off in profit or loss in the year the new information becomes available. Ownership of exploration and evaluation assets involves certain inherent risks, including geological, commodity prices, operating costs and permitting risks. Many of these risks are outside of the Company's control.
For the year ended December 31, 2025, there were no indicators of impairment identified with respect to the Company's exploration and evaluation assets. For the year ended December 31, 2024, there were indicators of impairment identified with respect to some of the Company's exploration and evaluation assets. This was due to the expiration of the rights to explore the area of interest, with no expectation of renewal.
The determination of fair value of share-based compensation associated with stock options and finders' fee warrants require assumptions with respect to volatility, expected life and discount rates. Changes in these assumptions impact the share-based compensation recognized in profit or loss over the vesting period of the stock options.
Judgments
Critical accounting judgments are accounting policies that have been identified as being complex or involving subjective judgments or assessments.
The Company's assessment of its ability to continue as a going concern requires significant judgments about whether there are material uncertainties that may cast significant doubt about the Company's ability to
continue as a going concern. The Company must determine whether sufficient financing will be obtained in the near term. See note 1 to the consolidated financial statements.
Recoverability of exploration and evaluation assets
The application of the Company's accounting policy for exploration and evaluation assets and expenditures requires judgment to determine whether future economic benefits are likely, from either future exploitation or sale, or whether activities have not reached a stage that permits a reasonable assessment of the existence of reserves.
At the end of each reporting period, the Company assesses its exploration and evaluation assets to determine whether any indication of impairment exists. Judgment is required in determining whether indicators of impairment exist, including factors such as the period for which the Company has the right to explore, expected renewals of exploration rights, whether substantive expenditure on further exploration and evaluation of exploration projects are budgeted and results of exploration and evaluation activities on the exploration and evaluation assets.
The determination of the functional currency of the Company and of its subsidiary requires significant judgment of the primary economic environment in which the Company and its subsidiary operates may not be clear. This can have a significant impact on the consolidated results of the Company based on the foreign currency translation method.
The Company's management, including the Chief Executive Officer and the Chief Financial Officer, believe that any disclosure controls and procedures or internal controls over financial reporting, no matter how well conceived and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system are met. Further, the design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be considered relative to their costs. Due to the inherent limitations in all control systems, the Company's management cannot provide absolute assurance that all control issues and instances of fraud, if any, within the Company have been prevented or detected. These inherent limitations include the fact that judgements in decision-making can be faulty and that breakdowns can occur because of a simple error or mistake. Additionally, controls can be circumvented by the individual acts of some persons, through collusion of two or more people, or by unauthorized override of the control. The design of any control system is also based in part upon certain assumptions about the likelihood of future events, and there can be no assurance that any design will succeed in achieving its stated goals under all potential future conditions. Accordingly, because of the inherent limitations in a cost-effective control system, misstatements due to error or fraud may occur and not be detected. The Company's officers are not required to certify the design and evaluation of the Company's disclosure controls and procedures and internal controls over financial reporting and have not completed such an evaluation. Inherent limitations on the ability of the certifying officers to design and implement on a cost-effective basis disclosure controls and procedures and internal controls over financial reporting for the Company may result in additional risks to the quality, reliability, transparency and timeliness of interim and annual filings and other reports provided under securities legislation.
QUALIFIED PERSON AND QUALITY CONTROL AND ASSURANCEThe technical information for the period ended December 31, 2024 and up to February 28, 2025 were reviewed under Andrew Rowe, former Exploration Manager, BAppSc, FAusIMM, FSEG as the Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects.
From February 28, 2025 until September 2025, the Company's Qualified person was Fraser MacCorquodale, Senior Technical Advisor, BAppSc, MAIF who has extensive experience relevant to the style of mineralization under consideration and qualifies as a Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects. From September 2025 to the period ended December 31, 2025 and subsequent, the Company's Vice President of Exploration, Jason Letto, B.Sc., P.Geo., is a Qualified Person as defined by National Instrument 43-101.
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTSCertain of the statements made and information contained herein is "forward-looking information" within the meaning of the
British Columbia Securities Act. These statements relate to future events or the Company's future performance. All statements,
other than statements of historical fact, may be forward-looking statements. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "anticipates", "plans", "budget", "scheduled", "continue", "estimates", "forecasts", "expect", "is expected", "project", "propose", "potential", "targeting", "intends", "believes" or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might", or "will be taken", "occur" or "be achieved" or the negative connotation thereof. These statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements. The Company believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this MD&A should not be unduly relied upon by readers, as actual results may vary. These statements speak only as of the date of this MD&A and are expressly qualified, in their entirety, by this cautionary statement. In particular, this MD&A contains forward-looking statements, pertaining to the following: capital expenditure programs, development of resources, treatment under governmental and taxation regimes, expectations regarding the Company's ability to raise capital, expenditures to be made by the Company and its joint venture partners on its properties and work plans to be conducted.
With respect to forward-looking statements listed above and contained in the MD&A, the Company has made assumptions regarding, among other things:
uncertainties relating to receiving mining, exploration and other permits in Japan;
unknown impact related to potential business disruptions stemming from infectious disease outbreak, or geopolitical conflicts;
unpredictable changes to the market prices for gold, copper and other commodities;
exploration and developments costs for properties in Japan;
availability of additional financing and farm-in or joint-venture partners;
anticipated results of exploration and development activities;
the Company's ability to obtain additional financing on satisfactory terms or at all.
The Company's actual results could differ materially from those anticipated in these forward-looking statements as a result of the risk factors set forth below and elsewhere in this MD&A: volatility in the market price for minerals; uncertainties associated with estimating resources; geological, technical, drilling and processing problems; liabilities and risks, including environmental liabilities and risks, inherent in mineral and oil and gas operations; fluctuations in currencies and interest rates; incorrect assessments of the value of acquisitions; unanticipated results of exploration activities; competition for, amongst other things, capital, undeveloped lands and skilled personnel; lack of availability of additional financing and farm-in or joint venture partners and unpredictable weather conditions. Although the Company has attempted to identify important factors that could cause results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Readers are cautioned that the foregoing lists of factors are not exhaustive. Forward looking statements are made as of the date hereof and accordingly are subject to change after such date. The forward-looking statements contained in this MD&A are expressly qualified by this cautionary statement. The Company does not undertake to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except in accordance with applicable securities laws.
Restatement of the Company's quarterly financial statements as at and for the three months ended June 30, 2024 and September 30, 2024The Company's previously reported quarterly financial statements as at and for the three months ended June 30, 2024 and September 30, 2024 did not appropriately account for the convertible debenture entered in April 2024. The previously reported quarterly financial statements as at and for the three months ended June 30, 2024 did not appropriately classify the conversion feature of the convertible debt and accounted for it as a liability instead of classifying it as an equity. The proceeds received from the convertible debt are classified as equity because the Company can settle this obligation by delivering a fixed number
of shares. For further details of the transaction, please refer to notes 2 and 6 of the annual financial statements of the Company as at and for the year ended December 31, 2024.
The change has been applied prospectively on the annual financial statements as at December 31, 2024 and prior period amounts have not been restated. Comparative information is presented as previously reported. There are no impacts on the current period.
As such, and as shown in the table below, the previously reported amounts in the statement of financial position as at June 30, 2024 and September 30, 2024 and previously reported amounts in the statements of loss and comprehensive loss for the three months ended June 30, 2024 and September 30, 2024,
Statement of financial position as at June 30, 2024
Convertible
debt
Derivative liability
Total liabilities
Share capital Contributed
surplus
Deficit Total
shareholders'
equity
Previously | |||||||
reported | $1,568,791 | $515,144 | $2,870,045 | $59,659,032 | $6,745,105 | $(35,271,409) | $24,683,635 |
Adjustment | (1,568,791) | (515,144) | (2,083,935) | (18,645) | 2,801,797 | (699,217) | 2,083,935 |
As restated | $ - | $ - | $ 786,110 | $59,640,387 | $9,546,902 | $(35,970,626) | $26,767,570 |
Statement of loss Interest and comprehensive expense loss for the three months ended June 30, 2024 | Accretion expense | Unrealized gain on derivative liability | Foreign exchange (income) loss | Net loss for the period | Net comprehensive loss for the period | Basic and diluted loss per share | |
Previously reported | $45,920 | $38,510 | $(713,450) | $(8,228) | $350,382 | $352,874 | $0.00 |
Adjustment | 877 | (38,510) | 713,450 | 23,400 | 699,217 | 699,217 | - |
As restated | $46,797 | $ - | $ - | $15,172 | $1,049,599 | $1,052,091 | $0.00 |
Statement of financial position as at September 30,
2024
Previously
Convertible
debt
Derivative liability
Total liabilities
Share capital
Contributed
surplus
Deficit Total
shareholders'
equity
reported $1,695,436 | $516,553 | $2,954,522 | $59,659,032 | $6,794,368 | $(36,376,920) | $26,088,071 |
Adjustment (1,695,436) | (516,533) | (2,211,989) | (33,886) | 2,871,238 | (625,363) | 2,211,989 |
As restated $ - $ - $ 742,533 $59,625,146 $9,665,606 $(37,002,283) $28,300,060
Statement of loss and comprehensive income for the three months ended September 30, 2024
Interest expense
Accretion expense
Unrealized
loss on derivative liability
Net loss for the period
Net comprehensive income for the period
Basic and diluted loss per share
Previously reported | $68,880 | $57,765 | $16,650 | $1,105,511 | $(1,355,173) | $0.00 |
Adjustment | 561 | (57,765) | (16,650) | (73,854) | (73,854) | - |
As restated | $69,411 | $ - | $ - | $1,031,657 | $(1,429,027) | $0.00 |