Environmental Impact Assessment And Environmental Management Programme FINAL FOR DMRE SUBMISSION for Listed Activities Associated with the Proposed Platreef Project, Situated in the Waterberg District Municipality, Limpopo Province DMRE Reference Number: LP 30/5/2/2/1/10067 MR Environmental Authorisation in Support of the Platreef Project
SUBMITTED FOR ENVIRONMENTAL AUTHORISATIONS IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT, 1998 (ACT NO. 107 OF 1998) (NEMA) AND THE NATIONAL ENVIRONMENTAL MANAGEMENT WASTE ACT, 2014 (ACT NO. 26 OF 2014) (NEM:WA) IN RESPECT OF LISTED ACTIVITIES THAT HAVE BEEN TRIGGERED BY APPLICATIONS IN TERMS OF THE MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT, 2002 (ACT NO. 28 OF 2002) (MPRDA) (AS AMENDED).
Name of Applicant: | Ivanplats (Pty) Ltd |
Tel no: | 011 088 4300/ 4369 |
Fax no: | 086 206 8249 |
Physical Address: | 82 Maude, Second Floor, Street Sandton South Africa |
File Reference Number SAMRAD: | No.: LP 30/5/1/2/2/10067 MR |
Digby Wells and Associates (South Africa) (Pty) Ltd
Company Registration: 2010/008577/07
Turnberry Office Park, Digby Wells House. 48 Grosvenor Road, Bryanston,2191
Phone: +27 (0) 11 789 9495
Fax: +27 (0) 11 789 9495
E-mail:
Website: https://www.digbywells.com
Directors: DJ Otto,
L Ratsoenyane
This document has been prepared by Digby Wells Environmental.
Report Type: | Environmental Impact Assessment and Environmental Management Plan Report |
Project Name: | Integrated Environmental Impact Assessment for the Proposed Platreef Project, situated in the Waterberg District Municipality, Limpopo Province |
Project Code: | IVA6895 |
Name | Responsibility | Signature | Date |
Modiegi Sepogwane | Report Compiler | January 2022 | |
Tshegofatso Msomi | Report Update | October 2022/Updated August 2023 | |
Claire Wannenburgh | Update Reviewer | November 2022/Updated December 2022 | |
Barbara Wessels | EXCO Reviewer | November 2022 | |
Lucy Stevens | Legal Reviewer | November 2022/Updated August 2023 |
This report is provided solely for the purposes set out in it and may not, in whole or in part, be used for any other purpose without Digby Wells Environmental prior written consent.
IMPORTANT NOTICE
In terms of the Mineral and Petroleum Resources Development Act (Act 28 of 2002 as amended), the Minister must grant a prospecting or mining right if among others the mining "will not result in unacceptable pollution, ecological degradation or damage to the environment".
Unless an Environmental Authorisation can be granted following the evaluation of an Environmental Impact Assessment and an Environmental Management Programme report in terms of the National Environmental Management Act (Act 107 of 1998) (NEMA), it cannot be concluded that the said activities will not result in unacceptable pollution, ecological degradation or damage to the environment.
In terms of section 16(3)(b) of the EIA Regulations, 2014, any report submitted as part of an application must be prepared in a format that may be determined by the Competent Authority and in terms of section 17 (1) (c) the competent Authority must check whether the application has taken into account any minimum requirements applicable, or instructions or guidance provided by the competent authority to the submission of applications.
It is therefore an instruction that the prescribed reports required in respect of applications for an environmental authorisation for listed activities triggered by an application for a right or a permit are submitted in the exact format of, and provide all the information required in terms of, this template. Furthermore, please be advised that failure to submit the information required in the format provided in this template will be regarded as a failure to meet the requirements of the Regulation and will lead to the Environmental Authorisation being refused. It is furthermore an instruction that the Environmental Assessment Practitioner must process and interpret his/her research and analysis and use the findings thereof to compile the information required herein. (Unprocessed supporting information may be attached as appendices). The EAP must ensure that the information required is placed correctly in the relevant sections of the Report, in the order, and under the provided headings as set out below, and ensure that the report is not cluttered with un-interpreted information and that it unambiguously represents the interpretation of the applicant.OBJECTIVE OF THE ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
The objective of the environmental impact assessment process is to, through a consultative process: -
determine the policy and legislative context within which the activity is located and document how the proposed activity complies with and responds to the policy and legislative context;
describe the need and desirability of the proposed activity, including the need and desirability of the activity in the context of the preferred location;
identify the location of the development footprint within the preferred site based on an impact and risk assessment process inclusive of cumulative impacts and a ranking process of all the identified development footprint alternatives focusing on the geographical, physical, biological, social, economic, heritage and cultural aspects of the environment;
determine the: -
nature, significance, consequence, extent, duration and probability of the impacts occurring to inform identified preferred alternatives; and
degree to which these impacts: -
can be reversed;
may cause irreplaceable loss of resources, and
can be avoided, managed, or mitigated.
identify the most ideal location for the activity within the preferred site based on the lowest level of environmental sensitivity identified during the assessment;
identify, assess, and rank the impacts the activity will impose on the preferred location through the life of the activity;
identify suitable measures to manage, avoid or mitigate identified impacts; and
identify residual risks that need to be managed and monitored.
EXECUTIVE SUMMARY
IntroductionIvanplats (Pty) Ltd. (Ivanplats) is currently developing the Platreef Project, an underground Platinum Group Metals (PGM) mine near Mokopane in the Limpopo Province. The Department of Mineral Resources and Energy (DMRE) granted Ivanplats a Mining Right (MR) (Ref. No.: LP 30/5/2/2/1/10067 MR) in 2014 for a period of thirty years for the development of the Platreef Mine on the farms Macalacaskop 243 KR and Turfspruit 241 KR.
The first Environmental Authorisation (EA) granted to Ivanplats by the Limpopo Department of Economic Development, Environment and Tourism (LEDET) was on 27 June 2014. Since then, the following amendments have been issued:
An amendment EA issued on 19 September 2014 (Ref. No.: 12/1/9/2-W32), authorising the following:
Amendment to allow pipelines to cross wetlands and watercourses from the Tailing Storage Facilities (TSF);
The inclusion of the need for an annual inspection of the conveyor belt; and
Amendment to the wording of various authorisations.
An EA issued on 30 July 2015 (Ref. No.: 12/1/9/2-W32) in respect of the TSF to be located on the farm Rietfontein 2KS; and
An amendment EA issued on 18 June 2018 (Ref. No.: LP 30/5/1/2/3/2/1 [10067] EM) in respect to the inclusion of a second shaft and associated infrastructure, as well as the amendment of the Environmental Management Programme (EMPr).
Since the granting of the above-mentioned authorisations, Ivanplats has made further changes to the planned Platreef Mine activities. Any change to the approved mine layout necessitates the requirement for an amendment to the relevant licences, in this case the EA, in terms of Regulation 31 of the Environmental Impact Assessment (EIA) Regulations, 2014 (Government Notice No. R. 982 of 4 December 2014 as amended) (the "EIA Regulations, 2014"). The report has also been compiled to consider International Financial Corporation (IFC) Standards with regards to implementing the principles and guidelines stipulated in the standard.
Further to these Amendments, new infrastructure has also been proposed which triggers Listed Activities in terms of the EIA Regulations, 2014 (as amended) which requires the need for a Scoping and Environmental Impact Reporting (S&EIR) process to be followed.
It is noted that this application will serve as an addendum to all other amendment applications submitted and will thus not replace the existing and approved EMPRs.
As part of the proposed Project, the following changes shown in the table below (Table A) are proposed to be made to the approved EIA/EMPr. It must be noted that the development will occur in two phases (Table A).
Table A: Proposed Amendments to the Approved activities or New proposed Activities
Infrastructure
Description
Phase 1
Dry Stack Tailings Storage
Site earmarked for the Waste Rock Dump (WRD) to be used as Dry Stack TSF. Part of the Ore stockpile area will also accommodate the waste rock separately.
Ore Stockpile (ROM)
A ROM Stockpile to be constructed. Previously the high- and low-grade ore stockpiles were separated and are now combined.
Crushing and Screening Plant
A new smaller crushing and screening plant (700ktpa) is proposed to be constructed.
Backfill Plant
It is proposed that waste/tailings material with a cement or similar binding material will be backfilled underground
Stormwater Management
Stormwater Management System, consisting of two additional Storm Water Ponds (#4 and #5), various drains and cut off berms will be constructed.
Diesel Generator Plant
The approved 10MW Diesel Generator Plant will be expanded by 10MW or more
Phase 2
Plant Cut off Drain
An additional cut-off drain will be constructed for the existing concentrator plant.
Stormwater Management
The stormwater drain will be expanded to the Mogalakwena River.
Haul Roads
The internal roads on the mine will be constructed in phases and upgraded.
Digby Wells Environmental (Digby Wells) has been appointed by Ivanplats as the independent Environmental Assessment Practitioner (EAP) to facilitate the application for Environmental Authorisation through a Scoping and EIA process.
To this end, the EA process aims to authorise new Listed Activities triggered in terms of the EIA Regulations, 2014 (as amended) as well as amendments to the approved mine layout which necessitates an amendment application in terms of Regulation 31 of the Environmental Impact Assessment (EIA) Regulations, 2014 (Government Notice No. R. 982 of 4 December 2014 as amended) (the "EIA Regulations, 2014")..
Project ApplicantThe details of the Project Applicant are included in the table below.
Proposed Changes to the Approved EMPrCompany name:
Ivanplats (Pty) Ltd
Contact person:
Gavin White
Physical address:
82 on Maude, Second Floor 82 Maude Street Sandton
South Africa
Telephone:
011 088 4300/4369
Email:
GavinW@Ivanplats.com
The Platreef Mine is currently under development and sinking of Shaft No. 1 has been completed. In addition, certain mine infrastructure has been established to support the sinking of Shaft 1, including the mine's access road, a mine boundary fence, and temporary facilities such as workshops and offices. There has been some surface excavation work at the Shaft No. 2 area, including the construction of a fence and stormwater infrastructure. The curtain grouting around Shaft No. 2 box cut has been completed and currently, the box cut is being excavated. All the activities are contained within an area of 20 ha and demarcated by a project fence. Ivanplats wishes to amend their EIA/EMPr to optimise operations. The following amendments and developments are proposed:
Changing the WRD to a Dry Stack TSF;
Construction of an Ore Stockpile (ROM) and waste rock dump;
The addition of a new smaller crushing and screening plant (700ktpa);
The construction of a Backfill Plant;
Stormwater Management System, consisting of two additional Storm Water Ponds (#4 and #5), various drains and cut off berms;
The previously approved Diesel Generator plant will be expanded by 10MW or more;
An additional cut-off drain will be constructed for the existing concentrator plant;
The stormwater drain will be expanded to the Mogalakwena River; and
The internal roads on the mine will be constructed in phases and upgraded.
Overview of the Platreef Mining Operation Phased ApproachThe first phase of the project consists of the further development of the underground workings and the construction of a new additional smaller crushing and screening plant (700ktpa), a Dry Stack TSF and supporting infrastructure.
These operations will be supported by infrastructure that includes a 132 kV Eskom Supply, a bulk water supply from the Masodi WWTW, on site waste handling facilities and a Stormwater Management System, consisting of two additional new Storm Water Ponds (No.4 and No. 5), various drains and cut off berms.
Underground operations will be supported from surface by workshops, warehouses, water storage tanks, water pumps, ventilation fans and explosives storage facilities.
Once the underground workings have been developed to the orebody, stoping will commence using the Drift and Fill method. The mine will be developed using a combination of the Drift and Fill method and the Long Hole Open Stoping method. Most of the mining will be done by Long Hole Open Stoping.
It is anticipated that in the initial stages of mining, backfilling of the works will take place using waste/tailings material with a cement or similar binding material. However, for the majority of the life of mine, back filling of the stopes will be done using of Cemented Paste Filling (CPF) during phase two.
The current philosophy is that the paste fill plant will be developed in two modules to align to the Concentrator plant ramp up, which will be further elaborated and defined with the next phase.
The second phase of the project will commence with the sinking and equipping of Shaft No.2. The larger Shaft No. 2 will allow the mine to increase the underground production in various steps, first to 2.9 Mtpa and then to 5.17 Mtpa, eventually ramped up to 12Mtpa in future. In addition to the Shaft sinking, the second phase of the project will commence with the additional underground development of the mine, the construction of 4.4 Mtpa PGM concentrator (Ramped up to 12Mtpa in future) and the Dry Stack TSF.
As the underground workings expand, additional ventilation fans will be installed within the Mine Area, notable part of the system will include refrigeration plant at Shaft No.1 as well as the raise boring and equipping of approved Vent Raises No. 1, No. 2 and No. 3.
The second phase of the project will also see the construction of additional workshops, storage facilities, permanent office facilities, change houses, training facilities and mining related support infrastructure.
The overall stormwater management infrastructure will be completed during this phase of the project which include the remainder of stormwater drainage, diversion berms, Attenuation Pond and main Storm Water Pond No.3.
To address the additional traffic the internal roads on the mine will be upgraded.
Purpose of this ReportThe purpose of an EIA process is to ensure that the potential environmental and social impacts associated with the construction, operation and closure and rehabilitation phases of a project are identified, assessed, and appropriately managed. There are two primary phases of an EIA process, namely the Scoping Phase and the Impact Assessment Phase. Identification of
potential impacts occurs during the Scoping Phase, whilst the assessment and mitigation of those impacts occurs during the Impact Assessment Phase. The impact assessment and mitigation management are presented in this EIA/EMPr Report. Various specialist studies were undertaken during the Project evaluation to inform the EIA/EMPr; these include:
Surface Water Impact Assessment;
Wetlands Impact Assessment;
Hydropedological Assessment;
Geochemical Assessment;
Geohydrology Assessment
Air Quality Impact Assessment;
Climate Change Impact Assessment;
Noise Impact Assessment;
Visual Assessment;
Social Impact Assessment;
Heritage Impact Assessment;
Traffic Impact Assessment; and
Rehabilitation and Closure Assessment.
A summary of the baseline environment is presented in Section 0 (Part A). Environmental monitoring plans suggested by various specialists are included in Section 8 (Part B) of this report and should be implemented to measure compliance, determine whether mitigation measures are effective and determine trends over the life of the Project.
Environmental ConsultantsThe contact details for the independent EAP are provided in the table below.
Approach and Methodology for the Public Participation ProcessCompany name:
Digby Wells Environmental
Contact person:
Mia Smith
Physical address:
Digby Wells House, Turnberry Office Park, 48 Grosvenor Road, Bryanston, 2191, South Africa.
Telephone:
011 789 9495
Cell phone:
011 069 6801
Email:
Mia.Smith@digbywells.com
A Public Participation Process was initiated during the Scoping Phase, which is central to the investigation of environmental and social impacts, as it is important that stakeholders who are
affected by the project are given an opportunity to identify concerns and to ensure that local knowledge, needs, and values are understood and taken into consideration as part of the impact assessment process. The Draft Scoping Report was released to the public for input and comments for a period of 30 days. The commenting period was from 29 October 2021 to 30 November 2021. The comments from the stakeholders are included in the Comment and Response Report that was attached as part of the Scoping Report. The Final Scoping Report was submitted to the DMRE on 10 December 2021 and approved on 21 February 2022, thereby allowing Ivanplats to continue into the EIA Phase. Following the approval, an Appeal was lodged against the acceptance of the Scoping Report by the DMRE. The Appeal process has subsequently been concluded on 23 September 2022 and Ivanplats were allowed to continue with the EIA phase of the project.
The Draft EIA/EMP will be submitted to the public for input and comments for a period of 30 days. The commencing period was from the 14 November 2022 and ended on 14 December 2022. The electronic Draft EIA/EMP was able to be accessed and downloaded from the Digby Wells website www.digbywells.com (Public Documents) and the data-free service portal. A Hard copy of the Draft EIA/EMP was made available to the public at the Mokopane public library.
Focus Group Meetings (FGMs) were held during this commenting period to present the Draft EIA/EMP and obtain comments from the Interested and Affected Parties (I&APs). The Draft EIA/EMP was updated with comments received from I&APs. The final EIA/EMP was submitted to the DMRE for adjudication on 15 December 2022.
Following the submission of the final EIA/EMP, a site visit was held between the DMRE and Ivanplats representatives on 3 August 2023 and a hybrid meeting held on 7 August 2023 between DMRE, Ivanplats and Digby Wells representatives, the DMRE issued a letter to Ivanplats on 8 August 2023. The DMRE requested an update of the EIA/EMP on the activities that require environmental authorisation. Following the changes made to the final EIA/EMP, the updated report was resubmitted to the public for review and comment. It must be noted that no new listed activities were added, or changes made to specialist studies. The commenting period was from 22 August 2023 to 21 September 2023. The electronic copy of the EIA/EMP was accessible from the Digby Wells website https://www.digbywells.com (Public Documents, the data-free service portal and newspaper advertisement published on Bosveld local newspaper on week of 24-30 August 2023. A hard copy of the EIA/EMP was made available to the public at the Mokopane public library. No comments were received during the commenting period.
Project AlternativesA Project alternative is defined as a possible course of action, in place of another, that would meet the same purpose and need (Department of Environmental Affairs and Tourism (DEAT), 2004). Section 9.1, Part A, provides the details of the development footprint alternatives considered for this Project. The following alternatives were considered in this EIA/EMPr:
Site;
Activity
Design and layout;
Mining Method
Technology; and
The 'No-Go" alternative.
The proposed Platreef Project area is characterised by warm, wet summers and dry winters. The area is located on the Northern Limb of the Bushveld Igneous Complex. The area is undulating and is located within the dominant Ae, Ah and Ib land types of the 2328 Pietersburg and 2428 Nylstroom land type maps (Land Type Survey Staff, 1989). These land types indicate that the underlying geology consist mainly of hornfels, shale, quartzite, conglomerate, granite and biotite granite.
The proposed Project is situated within the Savanna biome, which is the largest biome in Southern Africa. It consists of a grassy ground layer and a woody plant upper layer. It is known as Shrubveld when the woody layer is in close proximity to the grass layer and as Bushveld in any intermediate phases. The Project area occurs within four vegetation types namely, the Makhado Sweet Bushveld, Mamabolo Mountain Bushveld, Polokwane Plateau Bushveld and Waterberg Mountain Bushveld.
The current land use activities within the proposed areas are mainly artisanal and small mining, cultivation, residential areas, and livestock farming. The diffuse nature of the wetlands on site has been reduced and head-cut erosion has taken place. Livestock overgrazing and trampling have also contributed to the erosion in freshwater systems and drainage lines. The establishment of Alien Invasive Plants (AIPs) has resulted in a loss of vegetation integrity due to the decrease in biodiversity associated with land uses.
The Platreef Project area is located on the watershed boundary of quaternary catchments A61F and A61G within the Limpopo Water Management Area 1 (WMA 1). It is drained by the Mogalakwena River on the western fringe and its tributaries, the Rooisloot and Dithokeng.
Environmental Impact SummaryThe EIA Report, the associated specialist studies and the Public Participation Process (PPP) were undertaken in compliance with relevant South African legislation. A quantitative impact rating methodology was applied to determine the significance of the expected impacts pre-mitigation and post-mitigation. Table A provides a summary of the key impacts (of moderate and major significance only) expected during the various phases of the Project. This report lists and assesses all the potential impacts, together with the associated mitigation measures.
Table A: Summary of the Key Impacts Associated with the Proposed Activities
Activity | Aspect | Impacts | Rating (Pre-Mitigation) | Rating (Post Mitigation) |
Construction Phase | ||||
Alteration to the natural topography and drainage processes as a result of excavations and construction of infrastructure such as the box cut. | Hydropedology |
| Moderate (negative) | Minor (negative) |
Alteration to the natural topography and drainage processes as a result of excavations, construction, extension of haul road and construction of stormwater pond 4 and 5. | Surface Water |
| Moderate (negative) | Minor (negative) |
Activities associated with construction | Socio-economic |
| Moderate (negative) | Minor (negative) |
Socio-economic |
| Moderate (negative) | Minor (negative) | |
Socio-economic |
| Moderate (negative) | Minor (negative) | |
Socio-economic |
| Minor (positive) | Minor (positive) | |
Socio-economic |
| Minor (positive) | Moderate (positive) | |
Operational Phase | ||||
Operation of surface infrastructure within the infrastructure area (Dry Stack TSF, the Ore Stockpiles (ROM) and Waste Rock Stockpile, new additional crushing and screening plant and related infrastructure). | Visual |
| Moderate (negative) | Minor (negative) |
Operation of the Dry Stack TSF | Visual | Moderate (negative) | Moderate (negative) | |
| Air Quality |
| Major (negative) | Negligible (negative) |
DIGBY WELLS ENVIRONMENTAL
xi
https://www.digbywells.com
Activity | Aspect | Impacts | Rating (Pre-Mitigation) | Rating (Post Mitigation) |
| Noise |
| Major (negative) | Minor (negative) |
Water use and storage on-site - during the operation water will be required for various domestic and industrial uses. | Socio-economic |
| Major (negative) | Moderate (negative) |
Removal of rock (blasting). | Socio-economic |
| Moderate (negative) | Minor (negative) |
All project related activities associated with operation. | Socio-economic |
| Moderate (negative) | Minor (negative) |
All project related activities associated with operation. | Socio-economic |
| Minor (positive) | Moderate (positive) |
All project related activities associated with operation. | Socio-economic |
| Minor (positive) | Moderate (positive) |
All project related activities associated with operation. | Socio-economic |
| Minor (positive) | Moderate (positive) |
All project related activities associated with operation. | Socio-economic |
| Minor (positive) | Moderate (positive) |
Decommissioning Phase | ||||
Decant of Acid Mine Drainage (AMD). | Surface Water |
| Moderate (negative) | Minor (negative) |
Decommissioning | Socio-economic |
| Moderate (negative) | Minor (negative) |
Land subsidence due to removal or displacement of subsurface, vadose zone or deep underground earth materials | Hydropedology |
| Moderate (negative) | Minor (negative) |
| Hydropedology |
| Moderate (negative) | Negligible (negative) |
Hydrocarbons and other chemical spills and leakages from demolition equipment, moving vehicles and machinery during decommissioning activities. | Surface Water |
| Moderate (negative) | Negligible (negative) |
DIGBY WELLS ENVIRONMENTAL
https://www.digbywells.com
xii
Activity | Aspect | Impacts | Rating (Pre-Mitigation) | Rating (Post Mitigation) |
Backfilling and re-profiling of disturbed sites, where applicable. | Hydropedology and Surface Water |
| Moderate (negative) | Moderate (negative) |
DIGBY WELLS ENVIRONMENTAL
https://www.digbywells.com
xiii
Conclusions and RecommendationsThe specialist studies that were undertaken during the EIA Phase aimed to identify and weigh anticipated significant impacts and risks associated with the proposed Platreef Project. The findings of the impact assessments have shown that the proposed Project activities will have impacts on the receiving environment. The most significant negative impacts identified are associated with site clearing during the construction phase and general operational and maintenance activities during the operational phase. These activities may result in soil erosion and subsequent sedimentation of watercourses leading to water quality deterioration and alteration of surface and subsurface drainage patterns and reduced catchment water yield reporting to Mogalakwena River and tributaries. The Platreef Project will have a visual impact on the receiving environment. The most significant visual impact of the proposed Project will be from the Dry Stack tailings TSF due to the proposed footprints and height dimensions of this infrastructure.
Wetlands were recorded and cover approximately 157.38 ha which amounts to 1.45% of the total Project Area. The proposed mining activities will have minor impacts on wetlands. An artificial wetland was identified within the proposed infrastructure area. The impacts to this wetland are negligible due to its artificial nature. The highest impacts relating to the proposed activities will be to the Small Spruit Channelled Valley Bottom (CVB) and the Nyl River Floodplain as these systems are the most natural and provide various biodiversity and environmental services. Wetlands will not be directly impacted by the proposed surface infrastructure; however, residual impacts need to be avoided and minimised as far as possible.
Surface infrastructure and the box cut will variably impact on subsurface fluxes towards the Mogalakwena River and its tributaries as they are established to certain depths into the soil profile. Interruption of subsurface flow paths will reduce the flow regime in the affected watercourses, but flows are expected to improve following mine decommissioning, rehabilitation, and re-profiling of affected landscapes, where applicable.
The findings from the noise impact assessment have indicated major impacts on the nearby sensitive receivers from Project related activities. However, the implementation of mitigation measures in addition to the waste rock berm during the different phases of the Project is recommended and is predicted to result in minor impacts post-mitigation. A graveyard and heritage resources were identified within the Project area. The mitigation measures proposed have been described in Section 5 (Part B) of this EIA.
Adequate mitigation measures have been included into the EMPr to reduce the significance of all the identified negative impacts. Most negative impacts can be reduced through the implementation of mitigation measures. Nevertheless, the visual impact assessment, for example, revealed moderate impacts which cannot be mitigated.
The socio-economic study has identified key positive impacts which will result from the Project. If the proposed Project is authorised some positive social and economic impacts will be realised at local, regional, and national level. The Project will contribute to the existing operation, which has created long-term employment opportunities, and which generates
revenue feeding into the regional and national economies in a sector which is employing a growing portion of the workforce.
Monitoring plans, which should be implemented throughout the life of the mine, have also been provided to ensure that adverse impacts are recognised, and continuous improvements are developed and monitored throughout the lifespan of the Project. Based on the findings of the impact assessment, and with the understanding that the mitigation measures proposed herein will be implemented, and the conditions of the environmental authorisation enforced by the relevant authorities will be adhered to, the EAP is of the opinion that an environmental authorisation for the proposed development should be granted.
TABLE OF CONTENTS
Part A: Scope of Assessment and Environmental Impact Assessment Report 1Introduction 2
Item 3: Project Applicant 3
Item 3(a)(i): Details of Environmental Assessment Practitioner 4
Item 3(a)(ii): Expertise of the EAP 4
The Qualifications of the EAP 4
Summary of the EAP's Experience 4
Item 3(b): The Location of the Development Footprint of the Activity on the Approved Site as Contemplated in the Accepted Scoping Report 5
Item 3(c): Locality Map 8
Item 3(d): Description of the Scope of the Proposed Overall Activity 11
Item 3(d)(i): Listed and Specified Activities 11
Item 3(d)(ii): Description of the Activities to be Undertaken 18
Phase 1 Activities 18
Phase 2 Activities 19
Proposed Infrastructure 21
Stormwater Management 21
Water Supply 23
Electricity Supply 24
Waste Management 25
Item 3(e): Policy and Legislative Context 29
Item 3(f): Need and Desirability of the Proposed Activities 33
Questions to be Engaged with when Considering Need and Desirability 33
Item 3(g): Motivation for the Preferred Development Footprint within the Approved Site as Contemplated in the Accepted Scoping Report 44
Item 3(h): Full Description of the Process Followed to Reach the Proposed Preferred Alternatives within the Site 44
Item 3(h)(i): Details of the Development Footprint Alternatives Considered 44
Site Alternatives 45
Activity Alternative 45
Design and Layout of the Project 45
Technological Alternative 45
Mining Method Alternative 45
The No-Go Alternative 45
Item 3(h)(ii): Details of the Public Participation Process Followed 46
Stakeholder Identification 46
Consultation with Stakeholders during the Scoping Phase 47
Public Participation Activities 48
Consultation with Stakeholders during the EIA Phase 51
10.2 Item 3(h)(iii): Summary of Issues Raised by I&APs 52
Item 3(i): The Environmental Attributes associated with the Development Footprint Alternatives 54
Regional Climate 55
Temperature and Humidity 57
Rainfall 57
Topography and Drainage 58
Visual 62
Baseline Viewshed Modelling 62
Visual Sensitivity of the Area 63
Sensitive Receptors 63
Geology 66
Hydropedology 68
Land Types 68
Soil Forms 70
Hydropedological Soil Types 70
Hydropedological Responses 71
Surface water 75
Hydrological Setting 75
Water Quality 75
Stormwater Management Plan. 79
Groundwater 82
Groundwater Levels and Flow Direction 82
Groundwater Quality 87
Aquifer Characterisation 88
Geochemistry 89
Dry Stack and Cemented Tailings 89
Cemented Rockfill 92
Monolith Leach Test 94
Biodiversity 97
Wetlands 104
Wetland Indicators 104
Wetland Delineation 110
Present Ecological State 113
Ecosystem Services 113
Ecological Importance and Sensitivity 117
Sensitivity Analysis 117
Air Quality 118
Wind Speed 118
Assessment of Existing Air Quality 119
Climate Change 122
Overview of Platreef Project's Operations Emission causing Activities 122
Estimated GHG Emissions from Platreef Project Operation 123
Noise 125
Sensitive Receivers 125
Ambient Noise Levels 128
Heritage 131
Cultural Heritage Baseline Description 131
Site-Specific Heritage Landscape 136
Results from the Pre-Disturbance Survey 138
Socio-Economic 140
Regional and Secondary Study Areas 141
Baseline Conditions for the Primary Study Area 143
Traffic 152
Existing Road Network 152
Existing Traffic Volumes 153
Existing Public Transport and Non-motorised Transport 153
Public Transport and Non-motorised Transport Facilities 153
Item 3(j): Impacts and Risks Identified Including the Nature, Significance, Consequence, Extent, Duration and Probability of the Impacts 154
Impacts and Mitigations per Project Phase 154
Groundwater Impacts 177
Carbon and Climate Change 178
Cumulative Impacts 180
Hydropedology 180
Surface Water 180
Wetlands 181
Air Quality 181
Noise 182
Heritage 182
Socio-Economic 182
Item 3(k): Methodology used in Determining and Ranking the Nature, Significance, Consequence, Extent, Duration and Probability of Potential Environmental Impacts and Risks 184
Item 3(k)(i): The Positive and Negative Impacts that the Proposed Activity and Alternatives will have on the Environment and the Community that may be affected 189
Item 3(k)(ii): The Possible Mitigation Measures that Could be Applied and the Level of Risk 189
Item 3(k)(iii): Motivation where no Alternative Sites were Considered 189
Item 3(k)(iv): Statement Motivating the Alternative Development Location within the Overall Site 189
Item 3(l): Full Description of the Process Undertaken to Identify, Assess and Rank the Impacts and Risks the Activity will Impose on the Preferred Site (In respect of the final site layout plan) Through the Life of the Activity 190
Item 3(m): Assessment of each Identified Potentially Significant Impact and Risk191
Item 3(n): Summary of Specialist Reports 203
Item 3(o): Environmental Impact Statement. 210
Item 3(o)(i): Summary of the Key Findings of the Environmental Impact Assessment 210
Item 3(o)(ii): Final Site Map 211
Item 3(o)(iii): Summary of the Positive and Negative Implications and Risks of the Proposed Activity and Identified Alternatives 211
Item 3(p): Proposed Impact Management Objectives and the Impact Management Outcomes for Inclusion in the EMPR 212
Item 3(q): Final Proposed Alternatives 212
Item 3(r): Aspects for Inclusion as Conditions of Authorisation 213
Item 3(s): Description of any Assumptions, Uncertainties and Gaps in Knowledge 214
Item 3(t): Reasoned Opinion as to Whether the Proposed Activity should or should not be Authorised 218
Reasons why the Activity should be Authorised or Not 218
Conditions that must be Included in the Authorisation 219
Specific Conditions to be Included into the Compilation and Approval of the EMPR 219
Rehabilitation Requirements 220
Item 3(u): Period for which the Environmental Authorisation is Required 220
Item 3(v): Undertaking 220
Item 3(w): Financial Provision 220
Explain how the Aforesaid Amount was Derived 223
Rates 223
DMRE Classification 223
Confirm that this Amount can be Provided for from Operating Expenditure 224
Item 3(x): Deviations from the Approved Scoping Report and Plan of Study 224
Item 3(y): Specific Information Required by the Competent Authority 224
Impact on the Socio-Economic Conditions of any Directly Affected Person 224
Impact on any National Estate Referred to in Section 3(2) of the National Heritage Resources Act 227
Item 3(z): Other Matters Required in Terms of Sections 24(4)(a) and (b) of the Act 227
Item 1(a): Details of the EAP 229
Item 1(b): Description of the Aspects of the Activity 229
Item 1(c): Composite Map 229
Item 1(d): Description of Impact Management Objectives Including Management Statements 231
Item 1(d)(i): Determination of Closure Objectives 231
Item 1(d)(ii): The Process for Managing any Environmental Damage, Pollution, Pumping and Treatment of Extraneous Water or Ecological Degradation as a Result of Undertaking a Listed Activity 231
Item 1(d)(iii): Potential Risk of Acid Mine Drainage 232
Item 1(d)(iv): Steps taken to Investigate, Assess, and Evaluate the Impact of Acid Mine Drainage 233
Item 1(d)(v): Engineering or Mine Design Solutions to be Implemented to Avoid or Remedy Acid Mine Drainage 234
Item 1(d)(vi): Measures That Will be Put in Place to Remedy any Residual or Cumulative Impact that may Result from Acid Mine Drainage. 234
Item 1(d)(vii): Volumes and Rate of Water Use Required for the Mining, Trenching or Bulk Sampling Operation 234
Item 1(d)(viii): Has a Water Use Licence Been Applied for? 236
Item 1(e): Impacts to be Mitigated in their Respective Phases. 239
Item 1(f): Impact Management Outcomes. 253
Item 1(g) Financial Provision 258
Item (g)(i): Determination of the Amount of Financial Provision 258
Item (g)(1)(a): Describe the Closure Objectives and the Extent to Which They Have been Aligned to the Baseline Environment Described under the Regulation 258
Item (g)(1)(b): Confirm Specifically that the Environmental Objectives in Relation to Closure have been Consulted with Landowner and Interested and Affected Parties 259
Item (g)(1)(c): Provide a Rehabilitation Plan that Describes and Shows the Scale and Aerial Extent of the Main Mining Activities, Including the Anticipated Mining Area at the Time of Closure 259
Item (g)(1)(d): Explain why it can be confirmed that the Rehabilitation Plan is Compatible with the Closure Objectives 261
Item (g)(1)(e): Calculate and State the Quantum of the Financial Provision Required to Manage and Rehabilitate the Environment in Accordance with the Applicable Guideline 261
Item (g)(1)(f): Confirm that the Financial Provision will be Provided as Determined 261
Item 1(h) Monitoring Compliance and Performance Assessment 261
Item 1(h)(i): Monitoring of Impact Management Actions 261
Surface Water 262
Groundwater 263
Wetlands 265
Air Quality 266
Carbon and Climate Change 267
Noise 268
Visual 268
Social 269
Heritage 270
Item 1(h)(ii): Monitoring and Reporting Frequency 270
Item 1(h)(iii): Responsible Persons 270
Item 1(h)(iv): Time Period for Implementing Impact Management Actions 271
Item 1(h)(v): Mechanism for Monitoring Compliance 271
Item 1(i): Indicate the Frequency of the Submission of the Performance Assessment/ Environmental Audit Report. 275
Item 1(j): Environmental Awareness Plan 275
Item 1(j)(i): Manner in which the Applicant Intends to Inform his or her Employees of any Environmental Risk which may Result from their Work 275
Communication Strategy 275
Management Sector 275
Mine Workers Sector 276
Evaluation of the Environmental Awareness Plan 276
Item 1(j)(ii): Manner in which Risks will be Dealt with in Order to Avoid Pollution or the Degradation of the Environment 276
Item 1(k): Specific Information Required by the Competent Authority 280
Undertaking 280
Reference List 281
LIST OF FIGURES
Figure 3-1: Land Tenure Map 7
Figure 4-1: Regional Setting 9
Figure 4-2: Locality Map 10
Figure 5-1: Infrastructure Layout Plan (including TSF and Pipelines) 16
Figure 5-2: Detailed Layout of Mining-Related Infrastructure. 17
Figure 5-3: Eskom Supply Network 24
Figure 5-4:Bulk Power Scope of Work 25
Figure 5-5: Waste Disposal Facilities 27
Figure 11-1: Rainfall Distribution within Quaternary Catchments A61F and A61G 55
Figure 11-2: Rainfall and Evaporation Distribution for Quaternaries A61F and A61G 56
Figure 11-3: Runoff Distribution within Quaternary Catchments A61F and A61G 56
Figure 11-4: Monthly Temperature 57
Figure 11-5: Relative Humidity 57
Figure 11-6: Rainfall 58
Figure 11-7: Topographical Map 60
Figure 11-8: Slope Model of the Project Area 61
Figure 11-9: Viewshed Analysis of the TSF 64
Figure 11-10: Viewshed Analysis of the Infrastructure Area 65
Figure 11-11: Regional Geology 67
Figure 11-12: Terrain Form Sketch of the Ae224 Land Type Present in the Platreef Project Area 68
Figure 11-13: Terrain Form Sketch of the Ah28 Land Type Present in the Platreef Project Area
. 69
Figure 11-14: Terrain Form Sketch of the Ib447 Land Type Present in the Platreef Project Area
. 70
Figure 11-15: Soil Delineation 73
Figure 11-16: Conceptual Hillslope Responses within the Platreef Project Area 74
Figure 11-17: Hydrological Setting of the Platreef Project Area 77
Figure 11-18: Floodlines for the 1:50 and 1:100-year Flood Events 81
Figure 11-19: Long-term Water Level Trend at Monitoring Site GPR-13, Mine Site Area -Central Area 82
Figure 11-20: Long-term Water Level Trend at Monitoring Site GPR-26 Upstream Area 83
Figure 11-21: Long-term Water Level Trend at Monitoring Site GPR-04 Central Area. 84
Figure 11-22: Long-term Water Level Response at Monitoring Site BH04 up to June 2021 85 Figure 11-23: Long-term Water Level Response at Monitoring Site GPT006 up to June 2021
. 85
Figure 11-24: Long-term Water Level Response at Monitoring Site GPT010 up to June 2021
. 86
Figure 11-25: Piper Diagram Plot of the Groundwater Monitoring Sites in the PSA 87
Figure 11-26: A comparison of the Mineralogical Composition of Platreef Tailings (Dry Stack and cemented) 91
Figure 11-27: A Comparison of the Mineralogical Composition of Platreef Rockfill Samples96 Figure 11-28: Regional Vegetation 100
Figure 11-29: Conservation Plan 101
Figure 11-30: Mining and Biodiversity Guidelines 102
Figure 11-31: Protected Areas and RAMSAR Sites 103
Figure 11-32: Terrain Indicators 105
Figure 11-33: Soil Indicators 107
Figure 11-34: Vegetation Indicators 109
Figure 11-35: Wetland Delineation 111
Figure 11-36: River FEPA of Platreef Mine 112
Figure 11-37: Ecosystem Services 116
Figure 11-38: Wind Class Frequency 119
Figure 11-39: Background Concentrations of PM2.5 120
Figure 11-40: Background Concentrations of PM10 120
Figure 11-41: Background SO2 Levels 121
Figure 11-42: Background Concentration of NO2 121
Figure 11-43: Background Concentration of CO 122
Figure 11-44: Noise Measurement and Sensitive Receivers Locations 127
Figure 11-45: Noise Time Series Graph for N1 129
Figure 11-46: Noise Time Series Graph for N2 129
Figure 11-47: Heritage Resources Identified within the Regional Study Area 132
Figure 11-48: State of the Environment during the Pre-disturbance Survey 140
Figure 11-49: Results of the Pre-disturbance Survey showing Newly Identified Heritage Resources 140
Figure 11-50: Primary Study Area 144
Figure 11-51: Education Profile 148
Figure 3-1: Composite Map of Environmental Sensitivities within the MRA 230
Figure 4-1: Average Water Balance (m3/d) for the Phase 1 Mining Operation 237
Figure 4-2:Average Water Balance (m3/d) for the Phase 2 Mining Operation 238
LIST OF TABLES
Table 2-1: Contact Details of the Applicant 3
Table 2-2: Contact Details of the EAP 4
Table 3-1: Property Description 5
Table 5-1: New Listed Activities to be undertaken for the Proposed Amendment Project 13
Table 5-2: Activities for Phase 1 19
Table 5-3: Proposed Activities for Phase 2 19
Table 5-4: Project Phases and Associated Activities 20
Table 6-1: Policy and Legislative Context 29
Table 7-1: Need and Desirability 34
Table 10-1: Public Participation Activities 48
Table 10-2: EIA Phase Public Participation Process Activities 51
Table 11-1: Specialist reports and associated appendices 54
Table 11-2: Climate Statistics 58
Table 11-3: Soil Forms and Hydropedological Soil Types 71
Table 11-4: Surface Water Monitoring Points 75
Table 11-5: Surface Water Quality for Streams at Ivanplats Project Site 78
Table 11-6: A Comparison of the Mineralogical percentages and Weathering rate of Project Tailings (Dry Stack and Cemented) 90
Table 11-7: Comparison of the Mineralogical Percentages and Weathering Rate of Platreef Rockfill 95
Table 11-8: Regional Biodiversity Baseline 98
Table 11-9: Wetland Hydro-geomorphic Units of Platreef Mine 110
Table 11-10: Wetland Present Ecological State 113
Table 11-11: Ecosystem Services 114
Table 11-12: Ecological Importance and Sensitivity 117
Table 11-13: Sensitive Areas 118
Table 11-14: Summary of the Ambient Air Quality Results Mahwelereng 119
Table 11-15: Summary of the Ambient Air Quality Results (Gaseous Pollutants) 122
Table 11-16: Summary of Key Emission Sources (All Scope 1 and 2) 123
Table 11-17: Baseline Noise Measurements 128
Table 11-18: Noise Sources Identified 130
Table 11-19: Archaeological Periods in South Africa 131
Table 11-20: Heritage Resources Identified within the Project Area 136
Table 11-21: Primary Study Area Village 145
Table 11-22: Population Characteristics 146
Table 11-23: Population Demographics 147
Table 11-24: Employment Status 148
Table 11-25: Average Household Income 149
Table 11-26: Access to Service Delivery 150
Table 11-27: Community Development Priority Areas 152
Table 12-1: Impact Matrix Abbreviations 154
Table 12-2: Impact Assessment associated with the Construction, Operational and Decommissioning Phases 155
Table 12-3: Impact of Platreef Project's Emissions on South Africa's National Emissions . 179 Table 12-4: Summary of Potential Cumulative Impacts 182
Table 12-5: Cumulative Impacts 182
Table 13-1: Impact Assessment Parameter Ratings 186
Table 13-2: Probability/ Consequence Matrix 187
Table 13-3: Significance Rating Description 188
Table 15-1: Assessment of each identified Potentially Significant Impact 191
Table 16-1: Specialist Studies Undertaken for the Platreef Project. 203
Table 21-1: Specialist Studies Assumptions, Uncertainties, and Gaps 215
Table 25-1: LoM Closure Cost Summary 221
Table 25-2: Mine Classification 224
Table 27-1: Summary of Socio-Economic Impacts 226
Table 1-1: Contact details of the EAP 229
Table 5-1: Impacts to be Mitigated in their Respective Phases 239
Table 6-1: Impacts to be Mitigated in their Respective Phases 253
Table 7-1: Summary of Rehabilitation and Closure Actions 260
Table 8-1: Surface Water Monitoring Plan 262
Table 8-2: Platreef Abstraction Boreholes 264
Table 8-3: Hydrochemistry Parameters Analysed 265
Table 8-4: Wetlands Monitoring Plan 266
Table 8-5: Air Quality Monitoring Plan 267
Table 8-6: Noise Monitoring Programme 268
Table 8-7: Summary of Aspects to be Monitored 269
Table 8-8: Monitoring and Management of Environmental Impacts 272
Table 10-1: Unplanned Events, Risks and their Management Measures. 277
LIST OF APPENDICES
Appendix A: EAP CV and Qualifications Appendix B: Plans
Appendix C: PP Chapter
Appendix D: Visual Impact Assessment Appendix E: Hydropedological Assessment Appendix F: Surface Water Assessment Appendix G: Groundwater Assessment Appendix H: Geochemistry Study
Appendix I: Fauna and Flora (2013 study) Appendix J: Wetland Assessment Appendix K: Air Quality Assessment Appendix L: Climate Change Assessment Appendix M: Noise Assessment Appendix N: Heritage Assessment Appendix O: Social Assessment Appendix P: Traffic Impact Assessment Appendix Q: Closure Cost Assessment Appendix R: Existing Social Labour Plan
Appendix S: Scoping Report Acceptance and Appeal Letter
LIST OF PLANS
Plan 1: Land Tenure Plan 2: Regional Setting Plan 3: Local Setting
Plan 4: Infrastructure Layout
Plan 5: Detailed Infrastructure Plan Plan 6: Floodlines
Plan 7: Vegetation Map Plan 8: Wetland Delineation Plan 9: Composite Map
www.digbywells.com