Italian-thai Development Public Co., Ltd.SET: ITD

The Contract Signing of Chao Phraya River Crossing Bridge Phase 2 at Keik Kai Junction including On and Off Ramp Structure

· Issued by Italian-Thai Development Public Co., Ltd.

Translation

Italian-Thai Development Public Company Limited ("the Company") is pleased to inform SET that on June 23, 2022, the Company signed a contract with Bangkok Metropolitan Administration to proceed with the Project of Chao Phraya River Crossing Bridge Phase 2 at Keik Kai Junction including On and Off Ramp Structure.

The details of the contract works are as follows:

Description of works: Construction of 6 Traffic Lanes of Main Concrete Bridge with Drainage System, Traffic Sign, Lighting System, Decorative Lighting System, Control Building System and Others.

Contract Value:

  • Bangkok Metropolitan Administration
    925,079,874.41 THB (Including VAT)
  • Metropolitan Electricity Authority
    103,207,464.59 THB (Including VAT)
  • Metropolitan Waterworks Authority
    30,712,661.00 THB (Including VAT)
    In Total of 1,059,000,000 THB (Including VAT)

Period of Works

:

900 Days

Please be informed accordingly.

Earlier from Italian-thai Development Public

All Italian-thai Development Public news releases