Phoenix Copper Limited / Ticker: PXC / Sector: Mining
23 November 2026
Phoenix Copper Limited
("Phoenix" or the "Company")
Improved economics published in the updated Pre-Feasibility Study for the Empire Open-Pit Mine
Phoenix Copper Ltd (AIM: PXC; OTCQX ADR: PXCLY), the AIM-quoted USA-focused base and precious metals company, is pleased to announce that it has completed an update of the Pre-Feasibility Study ("PFS") for the proposed Empire Open-Pit copper, gold, silver mine in Idaho, USA.
The updated PFS includes both a base case, which assumes the purchase of new equipment, and a comparative used equipment case based on the use of pre-owned equipment. The latter reflects the Company's procurement approach to date, with several items of second-hand equipment already acquired.
Highlights
- Improved PFS economics with an increase in the Net Present Value (“NPV”) of 38.8%, Internal Rate of Return (“IRR”) of 12.9% and cumulative net cashflow of 41.2% compared to the 2024 PFS.
- The 2026 PFS, using three-year trailing average metal prices of $4.75 copper, $3,175 gold, and $41.75 silver, an 18% capex contingency for the pre-tax base case and 15% for the pre-tax used equipment case, indicates:
Project Evaluation Overview | 2026 Base Case (Pre-Tax) | 2026 Used Equipment Case (Pre-Tax) | 2024 PFS (Pre-Tax) |
NPV @ 7.5% | US$98.36m | US$121.94m | $87.86m |
IRR | 35.3% | 52.40% | 46.4% |
Cumulative Net Cashflow | US$190.00m | US$216.08m | $152.98m |
Initial Capital | US$98.41m | US$71.65m | $62.60m |
Payback Period | 1.88 years | 1.32 years | 1.41 years |
Total Cash Costs | $2.59/copper ("Cu") equivalent pound ("lb") ($5,710/t) | $2.59/copper lb ($5,710/t) | $2.44/copper lb ($5,379/t) |
- Increase in Life of mine from eight years to 10.5 years.
- Life of mine production (payable):
- 96.8 million lbs of copper (43,908t) – an increase of 8.6% (2024 PFS: 89.12 million lbs (40,424t));
- 52,200 ounces ("oz") of gold – an increase of 30% (2024 PFS: 40,151 oz); and
- 2.05 million oz of silver – an increase of 16.5% (2024 PFS: 1.76 million oz)
- Mineral reserves tonnage increased by 31.49% and copper equivalent metal increased by 26.31%
Ryan McDermott, Chief Executive Officer, commented: "Earlier this month the Company updated and reported the mineral reserves for our Empire Open-Pit copper-gold-silver deposit in Idaho USA. I am pleased to announce that we have now also updated the PFS, which was originally published in 2024. The update includes revised operating and capital costs and accounts for the significant increase in metal prices since the 2024 study.
“This updated study has provided the Company the opportunity to present a mining and production case that includes the economics of new capital equipment (less the capital equipment already purchased), a base case, and a comparison to a used capital equipment case. Both cases use approximately three-year trailing average metal prices of $4.75 copper, $3,175 gold, and $41.75 silver. The estimated initial capital cost for the new equipment case is $98.41 million and includes an 18% contingency. The used equipment capital cost estimate, which was updated for inflation and an added 15% contingency, is $71.65 million. Specific economic results for each of the cases, as well as a metal price sensitivity analysis, are shown in Tables 1 through 3.
“The updated capital and operating costs and the metal pricing used in this PFS are conservative and demonstrate that the economics of the Empire deposit are robust enough to support the purchase of new capital equipment and still weather fluctuating commodity prices. For the avoidance of doubt, it is still the Company’s intention to utilize good condition used equipment similar to the capital equipment we have already purchased. Knowing that the mine will support the purchase of new equipment adds credence to the viability of the ore deposit.
“I want to thank our consultants for a job well done with the updated mineral reserve and updated PFS. The next step in the process will be to complete final design engineering, which will include the continued enhancement of metallurgical recoveries and process design, and roll that information into a Plan of Operations for submission to the permitting authority. We will keep you updated as we progress through the process.”
Summary of Economic Results
The PFS for the Empire Open-Pit Project evaluates processing 13.27 million tonnes of ore at a milling rate of 4,000 tonnes per day (“tpd”) (1.26 million tonnes per annum) over a mine life of 10.5 years. The processing operations are planned with a mill and flotation circuit to produce a copper concentrate, with contained payables for silver, gold, and copper followed by a cementation circuit to produce precipitate copper which will only be payable for copper. During the mining of pit ore, the peak mineralised material and waste production is estimated at 11,930 tpd and an average production rate of 7,713 tpd. The life of mine average copper grade is estimated to be 0.40% for copper, 0.009 opt for gold and 0.37 opt for silver. The average life of mine stripping ratio is estimated to be 1.24:1 for the open pit.
Approximately 118.8 million lbs. (53,887t) of copper, 134,600 ounces of gold and 5,407,000 ounces of silver is projected to be mined with 98.2 million lbs. (44,543t) of copper, 53,600 ounces of gold and 2,046,000 ounces of silver recovered and produced for sale. 46% of the revenue is estimated to come from the copper concentrate with 54% coming from the copper cementation. Overall, 65% of the revenue is estimated from copper, 23% from gold and 12% from silver.
New Equipment - Base Case
Table 1 shows the financial analysis for the Project base case using $4.75/lb copper ($10,472/t), $3,175/oz gold, and $41.75/oz silver. Pre-Tax NPV-7.5 of $98.36 million, a pre-tax IRR of 35.3%, net cumulative cashflow of $190 million with a 1.88-year payback period.
Table 1 - Summary of Economic Results (USD) – Base Case New Equipment
Project Evaluation Overview | After Tax | Before Tax |
Cumulative Net Cashflow | $166.68 | $190.00 |
NPV @ 5.0%; (millions) | $105.13 | $122.33 |
NPV @ 7.5%; (millions) | $83.40 | $98.36 |
NPV @ 10.0%; (millions) | $65.87 | $78.99 |
Internal Rate of Return | 31.3% | 35.3% |
Payback Period | 2.08 | 1.88 |
Payback Multiple | 2.62 | 2.84 |
Initial Capital | $98.41 | $98.41 |
Used Equipment Case
In addition to the used ball mills, tailings filtration units, assay laboratory equipment, core shed, project office, and laydown yard already purchased, the Company has identified additional, high-quality used equipment available on the market that could be purchased for the project. Applying the used equipment values to the additional equipment items identified by the Company has the potential to reduce capital costs for both mobile and mechanical equipment by $18.3m in addition to $8.3m in indirect costs for a total initial capital savings of $26.6m. These cost savings have a potential to increase the NPV-7.5% by 25% to $105m as shown in Table 2, below.
Table 2 shows the financial analysis for the used equipment case using $4.75/lb copper, $3,175/oz gold, and $41.75/oz silver. Pre-Tax NPV-7.5 of $121.94m, a pre-tax IRR of 52.40%, net cumulative cashflow of $216.08m with a 1.32-year payback period.
Table 2 - Summary of Economic Results (USD) – Used Equipment Case
Project Evaluation Overview | After Tax | Before Tax |
Cumulative Net Cashflow | $189.09 | $216.08 |
NPV @ 5.0%; (millions) | $126.88 | $146.80 |
NPV @ 7.5%; (millions) | $104.61 | $121.94 |
NPV @ 10.0%; (millions) | $86.50 | $101.68 |
Internal Rate of Return | 46.70% | 52.40% |
Payback Period | 1.39 | 1.32 |
Payback Multiple | 3.47 | 3.83 |
Initial Capital | $71.65 | $71.65 |
Metal Price Sensitivity Analysis
Both the new and used equipment cases presented in Table 1 and Table 2 were calculated using $4.75/lb copper, $3,175/ oz gold, and $41.75/oz silver, which are approximately 3-year trailing average prices from September 2026 and are shown in the line 4 of Table 3, below.
Lines 5 through 7 illustrate the economics of the Empire Open-Pit at metal prices higher than used in the base case analysis. Current metal prices have been approximately 30% higher than the base case which show an after tax NPV-7.5% of $190m for the Project.
Table 3 – Metal Price Sensitivity Analysis
Cu Price $/lb. | Price Au $/oz | Price Ag $/oz | Net Cash Flow, millions | NPV-7.5%, millions | IRR | Payback Period, Years | Payback Multiple |
$3.33 | $2,223 | $29.23 | -$13.69 | -$26.54 | -4.3% | 7.7 | 0.9 |
$3.80 | $2,540 | $33.40 | $49.15 | $11.40 | 11.4% | 3.5 | 1.5 |
$4.28 | $2,858 | $37.58 | $108.41 | $47.75 | 22.1% | 2.7 | 2.1 |
$4.75 | $3,175 | $41.75 | $166.68 | $83.40 | 31.3% | 2.1 | 2.6 |
$5.23 | $3,493 | $45.93 | $224.93 | $119.00 | 39.6% | 1.7 | 3.2 |
$5.70 | $3,810 | $50.10 | $283.12 | $154.59 | 47.4% | 1.4 | 3.7 |
$6.18 | $4,128 | $54.28 | $341.24 | $190.14 | 54.9% | 1.3 | 4.3 |
Qualified Person
The foregoing technical information in this news release has been reviewed and verified by Dennis Thomas, ACSM, FIMMM, FGS, CEng, Eurlng, co-founder of Phoenix Copper Limited. Mr. Thomas has held both executive and non-executive roles in several international private and public natural resources companies and is a chartered mining engineer from the Camborne School of Mines. He is a Qualified Person under the AIM Rules and consents to the inclusion of the information in the form and the context in which it appears.
Environmental, Social, and Corporate Governance
Phoenix is committed to meeting and exceeding the environmental standards required by law as a core value of the Company. The baseline environmental data collected to date will be used to further the permitting process, but as importantly, will be used as the building blocks for the Company's ongoing Environmental, Social, and Corporate Governance (“ESG”) platform, overseen by the Company's ESG & Sustainability Committee. The Company has recently published its inaugural Sustainability Report, which can be viewed on the Company’s website.
Market Abuse Regulation (MAR) Disclosure
The Company deems the information contained within this announcement to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014, which has been incorporated into UK law by the European Union (Withdrawal) Act 2018. Upon the publication of this announcement via the Regulatory Information Service, this inside information is now considered to be in the public domain.
Contacts
Phoenix Copper Limited | Catherine Evans cathy.evans@phoenixcopper.com Ryan McDermott ryan.mcdermott@phoenixcopper.com | Tel: +44 7775 566030 Tel: +1 208 954 7039 |
SP Angel Corporate Finance LLP (Nominated Adviser) | Jen Clarke / David Hignell / Devik Mehta | Tel: +44 20 3470 0470 |
Zeus Capital Limited (Joint Broker) | Harry Ansell / Katy Mitchell | Tel: +44 20 7220 1666 |
BlytheRay | Megan Ray / Rachael Brooks | Tel: +44 20 7138 3204 |
Notes
Phoenix Copper Limited is an emerging producer and exploration company specialising in base and precious metals, with an initial focus on copper, gold, and silver extraction from an open-pit mining operation within the United States.
Located in the historic Alder Creek mining district near Mackay, Idaho, Phoenix's flagship asset is the Empire Mine, in which the Company holds an 80% ownership stake. The historic Empire underground mine, located beneath the surface of the Company's proposed open pit, boasts a rich history of producing high-grade copper, gold, silver, zinc, and tungsten.
Since 2017, Phoenix has executed extensive drilling initiatives, resulting in the estimation of mineral reserves. The Proven and Probable reserves at Empire are 13.27 million tonnes containing 118,781,100 lbs of copper, 134,600 ounces of gold, and 5,407,400 ounces of silver, equating to 83,959 copper equivalent tonnes.
In addition to the Empire Mine, Phoenix's holdings in the district also encompass the Horseshoe, White Knob, and Blue Bird Mines, all of which have been producers of copper, gold, silver, zinc, lead, and tungsten from underground operations, a new high-grade silver and lead orebody at Red Star, and the Navarre Creek gold exploration project, which was first drilled in 2023. The Company's land package at Empire spans 8,434 acres (34.13 sq km).
Phoenix also owns two cobalt properties situated along the Idaho Cobalt Belt to the north of Empire. An Earn-In Agreement has been established with Electra Battery Materials, Toronto, concerning one of these properties.
Phoenix is listed on London's AIM (PXC), and trades on New York's OTCQX Market (PXCLF and PXCLY (ADRs)). More details on the Company, its assets and its objectives can be found on PXC's website at https://phoenixcopperlimited.com/.
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.