Ida Valley Gold Drilling recommences
Filed with ASX · · 4 pages · English
• Stage 1 RC drilling confirmed gold discovery at Ida Valley - Significant composite assay of 4m @ 4.02g/t Au intersected from 40m in hole IVRC003 within 8m @ 2.30g/t Au from 36m. • New mineralised Greenstone Belt between the Agnew-Lawler’s and Mt Ida Mining Districts • +1,500mdrilling targeting bedrock gold mineralisation along the Ballard Fault • Newuntested soil anomalies of +1,300m in extent c
Story so far
Earlier from Techgen Metals
- New Anomalies at the Ida Valley Gold Project
- Flagship Copper Targets Identified
- Gold Mineralisation Confirmed At Ida Valley.
- VTEM Survey Commences at Mt Boggola Copper Project
- Ida Valley Gold Soils Geochemistry Commencement
Later from Techgen Metals
- Ida Valley 1m Gold Assays
- Ida Valley Gold Stage 2 RC Drilling Completed
- Ashburton Copper Projects- Updated Status
- TG1 Copper Investor Presentation
- Copper Sulphides Identified at Blue Rock Valley
Follow Techgen Metals into a list and get an email when it puts out news.
Follow Techgen Metals