  • The Company's capital investments and in-service additions for the quarter were $1,084 million and
  • A quarterly dividend of $0.3531 per share was declared, payable on December 31, 2026, to shareholders of record on December 9, 2026.

On 6ix: 6ix.com/news/hydro-one-3q26-results

Hydro One reports third quarter results

TORONTO, November 10, 2026 - Hydro One Limited (Hydro One or the Company) today announced its financial and operating results for the third quarter ended September 30, 2026.

Third Quarter Highlights
  • Third quarter basic earnings per share (EPS) of $0.69 compares to EPS of $0.70 for the same period in 2025. Year-to-date EPS of $1.96 compares to EPS of $1.84 for the same period in 2025.

  • The change in the third quarter EPS was largely due to higher operation, maintenance and administration (OM&A) costs, higher depreciation, amortization and asset removal costs, and higher interest on long-term debt, partially offset by increased revenues from Ontario Energy Board (OEB)-approved rates, and higher peak demand.

  • On October 7, 2026, Hydro One Networks Inc. submitted its 2028-2032 Joint Rate Application to the OEB with a proposed approximately $37 billion investment plan, inclusive of OM&A, for its transmission and distribution systems. The company also updated its future capital investment disclosures for the 2028-2032 period to align with the filing.

  • Hydro One filed a leave-to-construct application with the OEB for the North Shore Link transmission line project.

  • Hydro One successfully energized the new Etobicoke Greenway transmission line, adding capacity and strengthening reliability in Toronto and the western Greater Toronto Area.

  • Hydro One employees donated generously during our annual Power to Give Month campaign, raising more than $2 million for Canadian causes that they selected. These funds are made up of employee donations that were matched by Hydro One. Employees also tracked more than 7,400 volunteer hours that were dedicated to local causes in their communities.

  • Hydro One was recognized as one of the world's most trustworthy companies for 2026 by Newsweek Magazine.

  • The Company's capital investments and in-service additions for the quarter were $1,084 million and

    $658 million, respectively, compared to $779 million and $577 million in the third quarter of 2025.

  • A quarterly dividend of $0.3531 per share was declared, payable on December 31, 2026, to shareholders of record on December 9, 2026.

"Ontario's growth depends on a strong, reliable electricity system. Our 2028-2032 investment plan positions Hydro One to meet rising demand while enabling the communities, businesses and industries that will drive Ontario's next chapter of growth," said Megan Telford, President and Chief Executive Officer of Hydro One. "The investments we make today will strengthen the grid, enhance its resilience and security, and help ensure Ontario has the energy infrastructure it needs to grow and compete for decades to come."

Selected Consolidated Financial and Operating Highlights

(millions of Canadian dollars, except as otherwise noted)

Three months ended

2026

September 30

2025

Nine months ended

2026

September 30

2025

Revenues

2,491

2,299

7,441

6,773

Purchased power

1,204

1,080

3,699

3,199

Revenues, net of purchased power1

1,287

1,219

3,742

3,574

Net income attributable to common shareholders

413

421

1,174

1,106

Basic EPS

$0.69

$0.70

$1.96

$1.84

Diluted EPS

$0.68

$0.70

$1.95

$1.84

Net cash from operating activities

892

713

1,972

1,828

Capital investments

1,084

779

2,611

2,427

Assets placed in-service

658

577

1,786

1,591

Transmission: Average monthly Ontario 60-minute peak demand (MW)

23,734

23,080

22,005

21,699

Distribution: Electricity distributed to Hydro One customers (GWh)

8,136

7,937

25,371

24,492

1 "Revenues, net of purchased power" is a non-generally accepted accounting principles (GAAP) financial measure. Non-GAAP financial measures do not have a standardized meaning under United States (U.S.) GAAP used to prepare the Company's financial statements and might not be comparable to similar measures presented by other entities. See the section "Non-GAAP Financial Measures".

Key Financial Highlights

2026 Third Quarter Highlights

The Company reported net income attributable to common shareholders of $413 million during the quarter, compared to $421 million in the same period of 2025. This resulted in EPS of $0.69, compared to EPS of $0.70 during the same period in the prior year.

Revenues of $2,491 million for the third quarter were $192 million higher than revenues for the third quarter of 2025. Revenues, net of purchased power1 of $1,287 million for the third quarter were $68 million higher than revenues, net of purchased power1 for the third quarter of 2025. The increase is mainly attributable to higher revenues resulting from OEB-approved 2026 rates as well as higher average monthly peak demand.

OM&A costs in the third quarter of 2026 were higher than the prior year, mainly attributable to higher work program expenditures, including station maintenance and vegetation management.

Depreciation, amortization and asset removal costs for the third quarter of 2026 were higher than the prior year mainly due to higher asset removal costs resulting from a higher volume of storm restoration activities, and higher depreciation expense due to growth in capital assets.

Financing charges in the third quarter of 2026 were higher than the prior year primarily due to an increase in outstanding long-term debt, partially offset by a lower average volume of short-term notes outstanding.

Income tax expense for the third quarter of 2026 was in-line with the prior year.

Hydro One continues to invest in the reliability and performance of Ontario's electricity transmission and distribution systems by addressing aging power system infrastructure, facilitating connectivity to new load customers and generation sources, and improving service to customers. The Company made capital investments of approximately $1,084 million during the third quarter of 2026 and placed approximately

$658 million of new assets in-service.

1 Revenues, net of purchased power, is a non-GAAP financial measure. Non-GAAP financial measures do not have a standardized meaning under U.S. GAAP used to prepare the Company's financial statements and might not be comparable to similar measures presented by other entities. See the section "Non-GAAP Financial Measures".

Selected Operating Highlights

Subsequent to quarter end, Hydro One jointly filed rate applications for its Hydro One Networks Inc. Transmission and Distribution businesses with the OEB for the 2028 to 2032 period. The rate application proposed capital expenditures of approximately $16.7 billion for the transmission business and approximately $10.8 billion for the distribution business. The application also included a proposal for approximately $192 million of capital expenditures for its Sault Ste. Marie Limited Partnership for the same period.

Hydro One filed a leave-to-construct application with the OEB for North Shore Link transmission line, a new 105 kilometre, 230-kilovolt transmission line connecting Mississagi Transformer Station near Wharncliffe to the Third Line Transformer Station in Sault Ste. Marie. As part of the project, upgrades to the Mississagi and Third Line Transformer Stations will be carried out, in addition to expansion of the nearby Algoma Transformer Station, to meet system requirements. The approximately $1.3 billion investment is expected to strengthen the connection between the northeast and northwest and improve the resiliency of the northern transmission system. The line is expected to be in service in 2029.

Hydro One energized its Etobicoke Greenway transmission line, a new approximately six-kilometre, 230-kilovolt transmission line between Richview Transformer Station and the Manby Transformer Station in Etobicoke. The line will add approximately 300 megawatts of capacity to the region, enough to power all the homes in Etobicoke, twice. This additional capacity is expected to help meet growing electricity demand and strengthen power reliability across Toronto and the western Greater Toronto Area.

Common Share Dividends

On November 9, 2026, the Company declared a quarterly cash dividend to common shareholders of

$0.3531 per share to be paid on December 31, 2026 to shareholders of record on December 9, 2026. Unless indicated otherwise, all common share dividends paid by Hydro One Limited to shareholders are designated as "eligible" dividends for the purpose of the Income Tax Act (Canada) and any similar provincial legislation. Such quarterly dividends, unless and until changed, are only payable as and when declared by Hydro One Limited's Board of Directors and there is no entitlement to any dividend prior thereto.

Supplemental Segment Information

Three months ended

September 30

Nine months ended September 30

(millions of Canadian dollars)

2026

2025

2026

2025

Revenues

Transmission

732

680

2,063

1,938

Distribution

1,742

1,605

5,331

4,800

Other

17

14

47

35

Total revenues

2,491

2,299

7,441

6,773

Revenues, net of purchased power1

Transmission

732

680

2,063

1,938

Distribution

538

525

1,632

1,601

Other

17

14

47

35

Total revenues, net of purchased power1

1,287

1,219

3,742

3,574

Operation, maintenance and administration costs

Transmission

130

109

398

367

Distribution

163

164

504

508

Other

32

23

83

73

Total operation, maintenance and administration costs

325

296

985

948

Income before financing charges, equity income (loss) and income tax expense

Transmission

447

431

1,221

1,152

Distribution

232

232

727

696

Other

(18)

(12)

(45)

(46)

Total income before financing charges, equity income (loss) and income tax 661

651

1,903

1,802

Capital investments

Transmission

577

519

1,455

1,468

Distribution

502

257

1,145

949

Other

5

3

11

10

Total capital investments

1,084

779

2,611

2,427

Assets placed in-service

Transmission

246

256

870

590

Distribution

408

318

905

987

Other

4

3

11

14

Total assets placed in-service

658

577

1,786

1,591

expense

1 Revenues, net of purchased power, is a non-GAAP financial measure. Non-GAAP financial measures do not have a standardized meaning under U.S. GAAP used to prepare the Company's financial statements and might not be comparable to similar measures presented by other entities. See the section "Non-GAAP Financial Measures".

This press release should be read in conjunction with the Company's third quarter 2026 unaudited condensed interim financial statements and management's discussion and analysis (MD&A). These financial statements and MD&A together with additional information about Hydro One, including the audited consolidated financial statements and MD&A for the year ended December 31, 2025 can be accessed at https://www.HydroOne.com/Investors and https://www.sedarplus.com.

Quarterly Investment Community Teleconference

The Company's third quarter 2026 results teleconference with the investment community will be held on November 10, 2026 at 8 a.m. ET, a webcast of which will be available at www.HydroOne.com/Investors. Members of the financial community wishing to ask questions during the call should go to this link (https:// register-conf.media-server.com/register/BI02c9c3363ce748578c0bffad1f25c25d) prior to the scheduled start time to access Hydro One's third quarter 2026 results call. Media and other interested parties are welcome to participate on a listen-only basis. A webcast of the teleconference will be available at the same link following the call. Additionally, investors should note that, from time to time Hydro One management presents at brokerage sponsored investor conferences. Most often, but not always, these conferences are webcast by the hosting brokerage firm, and when they are webcast, links are made

available on Hydro One's website at https://www.HydroOne.com/Investors and are posted generally at least two days before the conference.

Hydro One Limited (TSX: H)

Hydro One Limited, through its wholly-owned subsidiaries, is Ontario's largest electricity transmission and distribution provider with 1.5 million valued customers, $39.7 billion in assets as at December 31, 2025, and annual revenues in 2025 of $9 billion.

Our team of 9,600 skilled and dedicated employees proudly build and maintain a safe and reliable electricity system which is essential to supporting strong and successful communities. In 2025, Hydro One invested $3.4 billion in its transmission and distribution networks, and supported the economy through buying $3.0 billion of goods and services.

We are committed to the communities where we live and work through community investment, sustainability and diversity initiatives.

Hydro One Limited's common shares are listed on the TSX and certain of Hydro One Inc.'s medium term notes are listed on the NYSE. Additional information can be accessed at www.HydroOne.com, www.sedarplus.com or www.sec.gov.

For More Information

For more information about everything Hydro One, please visit https://www.HydroOne.com where you can find additional information including links to securities filings, historical financial reports, and information about the Company's governance practices, corporate social responsibility, customer solutions, and further information about its business.

Non-GAAP Financial Measures

Hydro One uses a number of financial measures to assess its performance. The Company presents revenues, net of purchased power to reflect revenues net of the cost of purchased power, which is a non-GAAP financial measure. Since these specified financial measures and financial ratios may not have a standardized meaning within U.S. GAAP, results may not be comparable to similar financial measures and financial ratios presented by other entities. They should not be considered in isolation nor as a substitute for analysis of the Company's financial information reported under U.S. GAAP.

Revenues, Net of Purchased Power

Revenues, net of purchased power is defined as revenues less the cost of purchased power; distribution revenues, net of purchased power, is defined as distribution revenues less the cost of purchased power. These measures are used internally by management to assess the impacts of revenue on net income and are considered useful because it excludes the cost of power that is fully recovered through revenues and therefore net income neutral.

The following table provides a reconciliation of GAAP (reported) revenues to non-GAAP (adjusted) revenues, net of purchased power on a consolidated basis.

Three months ended September 30 Nine months ended September 30

(millions of dollars)

2026

2025

2026

2025

Revenues

2,491

2,299

7,441

6,773

Less: Purchased power

1,204

1,080

3,699

3,199

Revenues, net of purchased power

1,287

1,219

3,742

3,574

Three months ended September 30 Nine months ended September 30

(millions of dollars)

2026

2025

2026

2025

Distribution revenues

1,742

1,605

5,331

4,800

Less: Purchased power

1,204

1,080

3,699

3,199

Distribution revenues, net of purchased power

538

525

1,632

1,601

Forward-Looking Statements and Information

This press release contains "forward-looking information"

within the

meaning

of applicable

Canadian

securities laws and "forward-looking statements" within the meaning of applicable U.S. securities laws (collectively, "forward-looking information"). Statements containing forward-looking information are made pursuant to the "safe harbour" provisions of applicable Canadian and U.S. securities laws. Such information includes, but is not limited to, statements related to: the Company's strategic goals, delivering long-term value for customers, communities and stakeholders; the Company's plans to invest in reliability and performance of Ontario's electricity transmission and distribution systems and networks, including addressing aging power infrastructure, facilitating connectivity to new load customers and generation sources, and improving service to customers; the 2028-2032 Joint Rate Application, including the proposed amount of the investment plan, inclusive of OM&A, for its transmission and distribution systems and future capital investment disclosures for the period; expectations regarding community, sustainability and diversity commitments; the Company's ongoing and planned projects (including construction of transmission stations and lines) and expected capital investments and plans, including anticipated outcomes, impacts, and in-service and completion dates; and payment of dividends. Words such as "expect," "anticipate," "intend," "attempt," "may," "plan," "will," "can," "believe," "seek," "estimate," and variations of such words and similar expressions are intended to identify such forward-looking information. In particular, the forward-looking information contained in this press release is based on a variety of factors and assumptions including, but not limited to: no unforeseen changes in the legislative and operating framework for Ontario's electricity market or for Hydro One specifically; favourable decisions from the OEB and other regulatory bodies concerning outstanding and future rate and other applications; no unexpected delays in obtaining required approvals; no unforeseen changes in rate orders or rate setting methodologies for Hydro One's distribution and transmission businesses; the continued use and availability of U.S. GAAP; no unfavourable changes in environmental regulation; a stable regulatory environment; no significant changes to Hydro One's current credit ratings; no unforeseen impacts of new accounting pronouncements; no changes to expectations regarding electricity consumption; no unforeseen changes to economic and market conditions; completion of operating and capital projects that have been deferred; and no significant event occurring outside the ordinary course of business.

We caution that all forward-looking information is inherently subject to change and uncertainty and that actual results may differ materially from those expressed or implied by the forward-looking information. A number of risks, uncertainties and other factors could cause actual results and events to differ materially from those expressed or implied in the forward-looking information or could cause our current objectives, strategies and intentions to change, and many of these factors are beyond our control and current expectation or knowledge. These statements are not guarantees of future performance or actions and involve assumptions and risks and uncertainties that are difficult to predict. Therefore, actual outcomes and results may differ materially from what is expressed, implied or forecasted in such forward-looking information. Some of the factors that could cause actual results or outcomes to differ materially from the

results expressed, implied or forecasted by such forward-looking information, including some of the assumptions used in making such statements, are discussed more fully in Hydro One's filings with the securities regulatory authorities in Canada, which are available on SEDAR+ at https://www.sedarplus.com. Hydro One does not intend, and it disclaims any obligation, to update any forward-looking information, except as required by law.

For further information, please contact:

Investors:

Wassem Khalil

Director, Investor Relations investor.relations@hydroone.com 416-345-5943

Media:

Katrina Kim

Director, Communications media.relations@hydroone.com 416-345-6868

HYDRO ONE LIMITED

MANAGEMENT'S DISCUSSION AND ANALYSIS

For the three and nine months ended September 30, 2026 and 2025

The following Management's Discussion and Analysis (MD&A) of the financial condition and results of operations should be read together with the unaudited condensed interim consolidated financial statements and accompanying notes thereto (Consolidated Financial Statements) of Hydro One Limited (Hydro One or the Company) for the three and nine months ended September 30, 2026, as well as the Company's audited consolidated financial statements and MD&A for the year ended December 31, 2025. The Consolidated Financial Statements have been prepared in accordance with United States (U.S.) generally accepted accounting principles (GAAP). All financial information in this MD&A is presented in Canadian dollars, unless otherwise indicated.

The Company has prepared this MD&A in accordance with National Instrument 51-102 - Continuous Disclosure Obligations of the Canadian Securities Administrators. Under the U.S./ Canada Multijurisdictional Disclosure System, the Company is permitted to prepare this MD&A in accordance with the disclosure requirements of Canadian securities laws and regulations, which can vary from those of the U.S. This MD&A provides information as at and for the three and nine months ended September 30, 2026, based on information available to management as of November 9, 2026.

Included in this MD&A are certain specified financial measures and financial ratios that are not recognized by U.S. GAAP but that are used by management to evaluate the performance of the Company and its businesses. Since these specified financial measures and financial ratios may not have a standardized meaning within U.S. GAAP, results may not be comparable to similar financial measures and financial ratios presented by other entities. These measures and ratios should not be considered in isolation nor as a substitute for analysis of the Company's financial information reported under U.S. GAAP. See "Non-GAAP Financial Measures" for a discussion of these non-GAAP financial measures and a reconciliation of such measures to the most directly comparable U.S. GAAP measure.

CONSOLIDATED FINANCIAL HIGHLIGHTS AND STATISTICS

Three months ended September 30 Nine months ended September 30

(millions of dollars, except as otherwise noted)

2026

2025

Change

2026

2025

Change

Revenues

2,491

2,299

8.4%

7,441

6,773

9.9%

Purchased power

1,204

1,080

11.5%

3,699

3,199

15.6%

Revenues, net of purchased power1

1,287

1,219

5.6%

3,742

3,574

4.7%

Operation, maintenance and administration (OM&A) costs

325

296

9.8%

985

948

3.9%

Depreciation, amortization and asset removal costs

301

272

10.7%

854

824

3.6%

Financing charges

188

172

9.3%

545

504

8.1%

Income tax expense

60

60

-%

170

189

(10.1%)

Net income attributable to common shareholders of Hydro One

413

421

(1.9%)

1,174

1,106

6.1%

Basic earnings per common share (EPS)

$0.69

$0.70

(1.4%)

$1.96

$1.84

6.5%

Diluted EPS

$0.68

$0.70

(2.9%)

$1.95

$1.84

6.0%

Net cash from operating activities

892

713

25.1%

1,972

1,828

7.9%

Funds from operations (FFO)1

663

678

(2.2%)

2,074

1,978

4.9%

Annualized FFO to Net Debt1

13.9%

13.6%

0.3%

13.9%

13.6 %

0.3%

Capital investments

1,084

779

39.2%

2,611

2,427

7.6%

Assets placed in-service

658

577

14.0%

1,786

1,591

12.3%

Transmission: Average monthly Ontario 60-minute peak demand (MW)

23,734

23,080

2.8%

22,005

21,699

1.4%

Distribution: Electricity distributed to Hydro One customers (GWh)

8,136

7,937

2.5%

25,371

24,492

3.6%

September 30, December 31,

As at

2026

2025

Net Debt to capitalization ratio1

59.7%

59.5%

1 See section "Non-GAAP Financial Measures".

OVERVIEW

The Company's transmission business consists of the electricity transmission system operated by subsidiaries of Hydro One Inc. (a wholly-owned subsidiary of the Company), which include Hydro One Networks Inc. (Hydro One Networks), Hydro One Sault Ste. Marie LP (HOSSM), an approximate 66% interest in B2M Limited Partnership (B2M LP), an approximate 55% interest in Niagara Reinforcement Limited Partnership (NRLP), and an approximate 50% interest in Chatham x Lakeshore Limited Partnership (CLLP). The Transmission segment also includes Hydro One Networks' approximate 40% (2025 - 48%) minority interest in the East-West Tie Limited Partnership (EWT LP) (see section "Other Developments - EWT LP").

Hydro One's distribution business consists of the electricity distribution system operated by Hydro One Inc.'s subsidiaries, Hydro One Networks and Hydro One Remote Communities Inc. (Hydro One Remotes).

The other segment consists primarily of Hydro One's subsidiary, Acronym Solutions Inc. (Acronym), which provides telecommunications support for the Company's transmission and distribution businesses, as well as a comprehensive suite of Information Communication Technology solutions. The other segment also includes Aux Energy Inc., a wholly-owned subsidiary that provides energy solutions to commercial and industrial clients, and Ontario Charging Network LP (OCN LP), a wholly-owned subsidiary that owns and operates electric vehicle fast charging stations across Ontario under the Ivy Charging Network brand and provides certain energy solutions to commercial and industrial clients, as well as certain corporate activities, and is not rate-regulated.

For the nine months ended September 30, 2026 and 2025, Hydro One's segments accounted for the Company's total revenues, as follows:

Nine months ended September 30

2026

2025

Transmission

28%

28%

Distribution

71%

71%

Other

1%

1%

When adjusted for the recovery of purchased power costs, Hydro One's segments accounted for the Company's total revenues, net of purchased power,1 for the nine months ended September 30, 2026 and 2025 as follows:

Nine months ended September 30

2026

2025

Transmission

55%

54%

Distribution

44%

45%

Other

1%

1%

As at September 30, 2026 and December 31, 2025, Hydro One's segments accounted for the Company's total assets as follows:

September 30, December 31,

As at

2026

2025

Transmission

60%

60 %

Distribution

39%

38 %

Other

1%

2 %

RESULTS OF OPERATIONS

Net Income

Net income attributable to common shareholders of Hydro One for the quarter ended September 30, 2026 of $413 million is a decrease of $8 million, or 1.9%, compared to the same period in 2025. Significant influences on the change in net income attributable to the common shareholders include:

  • higher OM&A primarily resulting from higher work program expenditures, including station maintenance and vegetation management expenditures;

  • higher depreciation, amortization and asset removal costs primarily due to higher asset removal costs mainly resulting from a higher volume of storm restoration activities, and higher depreciation due to growth in capital assets; and

  • higher financing charges primarily due to an increase in outstanding long-term debt, partially offset by a lower average volume of short-term notes outstanding; partially offset by

  • higher revenues, net of purchased power,1 primarily resulting from an increase in transmission and distribution revenues due to Ontario Energy Board (OEB)-approved 2026 rates, and higher average monthly peak demand.

    Net income attributable to common shareholders of Hydro One for the nine months ended September 30, 2026 of $1,174 million is $68 million, or 6.1%, higher than the same period in 2025. Significant influences on the change in net income attributable to the common shareholders include:

  • higher revenues, net of purchased power,1 primarily resulting from an increase in transmission and distribution revenues due to OEB-approved 2026 rates, and higher average monthly peak demand; partially offset by

  • higher financing charges primarily due to an increase in outstanding long-term debt, partially offset by a lower average volume of short-term notes outstanding;

  • higher OM&A primarily resulting from higher work program expenditures, including station maintenance and higher vegetation management expenditures, as well as higher asset write-offs, and higher corporate support costs;

  • higher income tax expense, when adjusted for net income neutral items, resulting from higher pre-tax earnings; and

  • higher depreciation, amortization and asset removal costs primarily due to higher depreciation due to growth in capital assets, partially offset by lower asset removal costs mainly resulting from lower volume of storm restoration activities compared to the prior year.

    EPS

    EPS was $0.69 and $1.96 for the three and nine months ended September 30, 2026, respectively, compared to EPS of $0.70 and $1.84 in the same periods of 2025. The decrease in EPS for the three-month period was primarily due to lower earnings, while the increase in EPS for the nine-month period was primarily driven by higher earnings year-over-year, as discussed above.

    Revenues

    Three months ended September 30 Nine months ended September 30

    (millions of dollars, except as otherwise noted)

    2026

    2025

    Change

    2026

    2025

    Change

    Transmission

    732

    680

    7.6%

    2,063

    1,938

    6.4%

    Distribution

    1,742

    1,605

    8.5%

    5,331

    4,800

    11.1%

    Other

    17

    14

    21.4%

    47

    35

    34.3%

    Total revenues

    2,491

    2,299

    8.4%

    7,441

    6,773

    9.9%

    Transmission

    732

    680

    7.6%

    2,063

    1,938

    6.4%

    Distribution revenues, net of purchased power1

    538

    525

    2.5%

    1,632

    1,601

    1.9%

    Other

    17

    14

    21.4%

    47

    35

    34.3%

    Total revenues, net of purchased power1

    1,287

    1,219

    5.6%

    3,742

    3,574

    4.7%

    Transmission: Average monthly Ontario 60-minute peak demand (MW)

    23,734

    23,080

    2.8%

    22,005

    21,699

    1.4%

    Distribution: Electricity distributed to Hydro One customers (GWh)

    8,136

    7,937

    2.5%

    25,371

    24,492

    3.6%

    1 See section "Non-GAAP Financial Measures".

    Transmission Revenues

    Transmission revenues increased by 7.6% compared to the quarter ended September 30, 2025, primarily due to:

  • higher revenues resulting from OEB-approved 2026 rates; and

  • higher average monthly peak demand; partially offset by

  • net income neutral items, mainly attributable to lower revenues associated with a regulatory tax adjustment related to reintroduction of accelerated capital cost allowance, which is offset in income tax expense.

    Transmission revenues increased by 6.4% compared to the nine months ended September 30, 2025, primarily due to similar factors noted above.

    Distribution Revenues

    Distribution revenues increased by 8.5% compared to the quarter ended September 30, 2025, primarily due to:

  • higher purchased power costs, which are fully recovered from ratepayers and thus net income neutral; and

  • higher revenues resulting from OEB-approved 2026 rates; partially offset by

  • net income neutral items, mainly related to lower revenues from the OEB-approved recovery of regulatory assets in the prior period, which are offset in OM&A and income tax expense, lower revenues associated with a regulatory tax adjustment related to re-introduction of accelerated capital cost allowance, which is offset in income tax expense, and the recovery of 2025 storm-related costs incurred on behalf of third parties, which is offset in OM&A.

    Distribution revenues increased by 11.1% compared to the nine months ended September 30, 2025, primarily due to similar factors as noted above, as well as higher energy consumption.

    Distribution revenues, net of purchased power,2 increased by 2.5% and 1.9% compared to the three and nine months ended September 30, 2025, respectively, primarily due to the reasons noted above.

    OM&A Costs

    Three months ended September 30 Nine months ended September 30

    (millions of dollars, except as otherwise noted)

    2026

    2025

    Change

    2026

    2025

    Change

    Transmission

    130

    109

    19.3%

    398

    367

    8.4%

    Distribution

    163

    164

    (0.6%)

    504

    508

    (0.8%)

    Other

    32

    23

    39.1%

    83

    73

    13.7%

    325

    296

    9.8%

    985

    948

    3.9%

    Transmission OM&A Costs

    Transmission OM&A costs were 19.3% higher than the quarter ended September 30, 2025, primarily due to:

  • higher work program expenditures, including station maintenance and vegetation management work; and

  • higher asset write-offs.

    Transmission OM&A costs were 8.4% higher than the nine months ended September 30, 2025, primarily due to similar factors to those noted above, as well as higher corporate support costs, partially offset by a one-time reduction to the property tax provision in the second quarter of 2026.

    Distribution OM&A Costs

    Distribution OM&A costs were 0.6% lower than the quarter ended September 30, 2025, primarily due to:

  • net income neutral items including costs related to a storm in the prior year that were recovered from third parties, and OM&A associated with the OEB-approved recovery of cost deferrals in the prior year, both of which are offset in revenue; and

  • lower corporate support costs; partially offset by

  • higher work program expenditures, including emergency power restoration and lines maintenance work.

    Distribution OM&A costs were 0.8% lower than the nine months ended September 30, 2025, primarily due to similar factors noted above.

    Other OM&A Costs

    Other OM&A costs were 39.1% and 13.7% higher than the three and nine months ended September 30, 2025, respectively, primarily due to higher third party service costs in Acronym.

    Depreciation, Amortization and Asset Removal Costs

    Depreciation, amortization and asset removal costs increased by $29 million for the three months ended September 30, 2026, compared to the same period in 2025, primarily due to higher asset removal costs resulting from a higher volume of storm restoration activities, compared to the same quarter in 2025, and higher spend in station construction projects, as well as higher depreciation expense attributed to the growth in capital assets as the Company continues to place new assets in-service.

    Depreciation, amortization and asset removal costs increased by $30 million for the nine months ended September 30, 2026, compared to the same period in 2025, primarily due to higher depreciation expense attributed to the growth in capital assets as the Company continues to place new assets in-service, partially offset by lower asset removal costs mainly resulting from lower volume of storm restoration activities compared to the prior year.

    Financing Charges

    Financing charges increased by $16 million and $41 million for the three and nine months ended September 30, 2026, respectively, primarily due to an increase in outstanding long-term debt, partially offset by a lower average volume of short-term notes outstanding, and higher capitalized interest.

    Income Tax Expense

    Income tax expense for the three months ended September 30, 2026 was in-line with the same period in 2025.

    Income tax expense of $170 million for the nine months ended September 30, 2026 compares to $189 million for the same period in 2025. The $19 million year-over-year decrease was primarily due to:

  • higher deductible timing differences than the prior year, including additional tax deductions from the re-introduction of accelerated capital cost allowance, that are offset by a corresponding reduction in revenue, and therefore net income neutral; partially offset by

  • higher pre-tax earnings.

    The Company realized an effective tax rate (ETR) of approximately 12.6% and 12.5% for the three and nine months ended September 30, 2026, respectively, compared to approximately 12.4% and 14.5% in the same periods of 2025. The ETR for the three-month period was comparable to the same period in the prior year, while the 2.0% decrease in the ETR for the nine-month period was primarily attributable to the factors discussed above.

    SHARE CAPITAL

    The common shares of Hydro One are publicly traded on the Toronto Stock Exchange (TSX) under the trading symbol "H". Hydro One is authorized to issue an unlimited number of common shares. The amount and timing of any dividends payable by Hydro One is at the discretion of Hydro One's Board of Directors (Board) and is established on the basis of Hydro One's results of operations, maintenance of its deemed regulatory capital structure, the Company's financial condition and forecast cash requirements, the satisfaction of solvency tests imposed by corporate laws for the declaration and payment of dividends, and other factors that the Board may consider relevant. As at November 9, 2026, Hydro One had 600,097,540 issued and outstanding common shares.

    The Company is authorized to issue an unlimited number of preferred shares, issuable in series. As at November 9, 2026, the Company had no preferred shares issued and outstanding.

    The number of additional common shares of Hydro One that would be issued if all outstanding awards under the share grant plans and the Long-term Incentive Plan (LTIP) were vested and exercised as at November 9, 2026 was 1,240,599.

    Common Share Dividends

    In 2026, the Company declared and paid cash dividends to common shareholders as follows:

    Total Amount

    Date Declared

    Record Date

    Payment Date

    Amount per Share

    (millions of dollars)

    February 16, 2026

    March 11, 2026

    March 31, 2026

    $0.3331

    200

    May 12, 2026

    June 10, 2026

    June 30, 2026

    $0.3531

    212

    August 11, 2026

    September 9, 2026

    September 29, 2026

    $0.3531

    211

    623

    Following the conclusion of the third quarter of 2026, the Company declared a cash dividend to common shareholders as follows:

    Total Amount

    Date Declared

    Record Date

    Payment Date

    Amount per Share

    (millions of dollars)

    November 9, 2026

    December 9, 2026

    December 31, 2026

    $0.3531

    $212

    QUARTERLY RESULTS OF OPERATIONS

    Quarter ended (millions of dollars, except EPS and ratio)

    Sep 30, 2026

    Jun 30, 2026

    Mar 31, 2026

    Dec 31, 2025

    Sep 30, 2025

    Jun 30, 2025

    Mar 31, 2025

    Dec 31, 2024

    Revenues

    2,491

    2,302

    2,648

    2,268

    2,299

    2,066

    2,408

    2,095

    Purchased power

    1,204

    1,071

    1,424

    1,287

    1,080

    899

    1,220

    1,060

    Revenues, net of purchased power1

    1,287

    1,231

    1,224

    981

    1,219

    1,167

    1,188

    1,035

    Net income attributable to common shareholders

    413

    370

    391

    233

    421

    327

    358

    200

    Basic EPS

    $0.69

    $0.62

    $0.65

    $0.39

    $0.70

    $0.54

    $0.60

    $0.33

    Diluted EPS

    $0.68

    $0.62

    $0.65

    $0.39

    $0.70

    $0.54

    $0.60

    $0.33

    Earnings coverage ratio1

    2.8

    2.8

    2.8

    2.8

    2.8

    2.8

    2.8

    2.8

    1 See section "Non-GAAP Financial Measures".

    Variations in revenues and net income attributable to common shareholders over the quarters are primarily due to the impact of seasonal weather conditions on customer demand and market pricing, as well as timing of regulatory decisions.

    CAPITAL INVESTMENTS

    Capital investments represent additions to property, plant and equipment and intangible assets, including capitalized interest and overhead costs incurred during construction. Assets placed in-service represent completed capital assets that have been transferred into service and are available for their intended use during the period, and as applicable, included in the Company's rate-regulated asset base. The Company makes capital investments to maintain the safety, reliability and integrity of its transmission and distribution system assets and to provide for the ongoing growth and modernization required to meet the expanding and evolving needs of its customers and the electricity market. This is achieved through a combination of sustaining capital investments, which are required to support the continued operation of Hydro One's existing assets, and development capital investments, which involve additions to both existing assets and large-scale projects such as new transmission lines and transmission stations.

    Assets Placed In-Service

    The following table presents Hydro One's assets placed in-service during the three and nine months ended September 30, 2026 and 2025:

    Three months ended September 30 Nine months ended September 30

    (millions of dollars)

    2026

    2025

    Change

    2026

    2025

    Change

    Transmission

    246

    256

    (3.9%)

    870

    590

    47.5%

    Distribution

    408

    318

    28.3%

    905

    987

    (8.3%)

    Other

    4

    3

    33.3%

    11

    14

    (21.4%)

    Total assets placed in-service

    658

    577

    14.0%

    1,786

    1,591

    12.3%

    Transmission Assets Placed In-Service

    Transmission assets placed in-service decreased by $10 million, or 3.9%, for the quarter ended September 30, 2026, compared to the same period in 2025, primarily due to timing of assets placed in-service for station refurbishments and replacements.

    Transmission assets placed in-service increased by $280 million, or 47.5%, for the nine months ended September 30, 2026, compared to the same period in 2025, primarily due to:

  • timing of assets placed in-service for station refurbishments and replacements; and

  • investments placed in-service for high-voltage underground cable replacements; partially offset by

  • the in-service of a customer connection project at the South Middle Road Transmission Station in the prior year; and

  • investments placed in-service for the Orillia Distribution Warehouse in the prior year. Distribution Assets Placed In-Service

    Distribution assets placed in-service increased by $90 million, or 28.3%, for the quarter ended September 30, 2026, compared to the same period in 2025, primarily due to:

  • investments placed in-service for Ontario's broadband initiative; and

  • higher volume of storm-related asset replacements; partially offset by

  • timing of investments placed in-service for system capability reinforcement projects; and

  • assets placed in-service for the Advanced Metering Infrastructure (AMI) 2.0 system.

    Distribution assets placed in-service decreased by $82 million, or 8.3%, for the nine months ended September 30, 2026, compared to the same period in 2025, primarily due to:

  • lower volume of storm-related asset replacements;

  • timing of investments placed in-service for system capability reinforcement projects;

  • investments placed in-service for the Orillia Distribution Warehouse and the Orillia Operation Centre in the prior year;

  • lower volume of wood pole replacements; and

  • investments placed in-service for the Network Outage Management System; partially offset by

  • investments placed in-service for Ontario's broadband initiative; and

  • assets placed in-service for the AMI 2.0 system.

    Capital Investments

    The following table presents Hydro One's capital investments during the three and nine months ended September 30, 2026 and 2025:

    Three months ended September 30 Nine months ended September 30

    (millions of dollars)

    2026

    2025

    Change

    2026

    2025

    Change

    Transmission

    Sustaining

    230

    293

    (21.5%)

    673

    842

    (20.1%)

    Development

    333

    187

    78.1%

    737

    557

    32.3%

    Other

    14

    39

    (64.1%)

    45

    69

    (34.8%)

    577

    519

    11.2%

    1,455

    1,468

    (0.9%)

    Distribution

    Sustaining

    334

    124

    169.4%

    641

    564

    13.7%

    Development

    160

    107

    49.5%

    446

    303

    47.2%

    Other

    8

    26

    (69.2%)

    58

    82

    (29.3%)

    502

    257

    95.3%

    1,145

    949

    20.7%

    Other

    5

    3

    66.7%

    11

    10

    10.0%

    Total capital investments

    1,084

    779

    39.2%

    2,611

    2,427

    7.6%

    Transmission Capital Investments

    Transmission capital investments increased by $58 million, or 11.2%, in the third quarter of 2026 compared to the third quarter of 2025, primarily due to:

  • investments in the Northeast Power Line, the North Shore Link, and the Longwood to Lakeshore Transmission Line Projects; and

  • higher spend on other major development projects; partially offset by

  • lower volume of station refurbishments and equipment replacements;

  • investments in the Sault #3 Circuit; and

  • lower spend on specified equipment to support long-term projects.

    Transmission capital investments decreased by $13 million, or 0.9%, in the nine months ended September 30, 2026, compared to the same period in 2025, primarily due to:

  • lower volume of station refurbishments and equipment replacements;

  • investments in the Waasigan Transmission Line and the St. Clair Transmission Line Projects;

  • investments in the Sault #3 Circuit; and

  • lower spend on specified equipment to support long-term projects; partially offset by

  • investments in the Northeast Power Line, the North Shore Link, and the Longwood to Lakeshore Transmission Line Projects; and

  • higher spend on other major development projects. Distribution Capital Investments

    Distribution capital investments increased by $245 million, or 95.3%, in the third quarter of 2026 compared to the third quarter of 2025, primarily due to:

  • investments in Ontario's broadband initiative;

  • investments in the AMI 2.0 system; and

  • higher spend on storm-related asset replacements in the quarter; partially offset by

  • lower spend on specified equipment to support long-term projects.

Distribution capital investments increased by $196 million, or 20.7%, in the nine months ended September 30, 2026, compared to the same period in 2025, primarily due to similar factors noted above, partially offset by lower spend on storm-related asset replacements during the first half of the year.

Major Transmission Capital Investment Projects

The following tables summarize the status of significant transmission projects as at September 30, 2026:

Development Projects

Project Name Location Type

Anticipated In-Service Date

Estimated

Cost1

Capital Cost

To Date

Thunder Bay-Atikokan-

Waasigan Transmission Line2 New transmission line and 2027

Northwestern Ontario

St. Clair Transmission Line Southwestern Ontario New transmission line and 2027

1,140

435

731

314

New transmission station and

Centennial Transmission Station3 Southwestern Ontario connection; and new 2027

403

270

transmission line

Holt Transmission Station Bowmanville Central New transmission station and 2027

137

59

Keith Intertie Upgrade Windsor Transmission station upgrade 2028

109

13

Northeast Power Line Northeastern Ontario New transmission line and 2029

1,855

86

North Shore Link Northeastern Ontario New transmission line and 2029

1,362

70

Durham Kawartha Power Line Eastern Ontario New transmission line and 2029

433

57

Welland Thorold Power Line Niagara New transmission line and 2029

311

69

Orléans Area Reinforcement Ottawa Transmission line upgrade 2029

101

13

Longwood to Lakeshore Southwestern Ontario New transmission line and 2030

1,166

108

Wawa Timmins Power Line5 Northeastern Ontario New transmission line and TBD

TBD

24

Sudbury Barrie New transmission line and

6 Northern-Central Ontario TBD

TBD

9

Windsor Lakeshore Southwestern Ontario New transmission line and TBD

TBD

8

Greenstone Transmission Line Northwestern Ontario New transmission line and TBD

TBD

4

Bowmanville to East Greater Southern Ontario New transmission line and TBD

TBD

3

Waterloo Wellington Power Line9 Southwestern Ontario New transmission line and new TBD

TBD

2

Red Lake Transmission Line10 Northwestern Ontario New transmission line and station TBD

TBD

2

Dryden

station expansion

(year) (millions of dollars)

station expansion

Ontario connection

Southwestern Ontario

station expansion station expansion station expansion

Southern Ontario station expansion

Eastern Ontario

Transmission Line4 station expansion

station expansion

Transmission Line station expansion

Transmission Line7 station expansion

station expansion

Toronto Area Power Line8 station expansion

transmission station

expansion

1 Estimated costs are presented gross of any potential contribution from external parties.

2 The Waasigan Transmission Line Project includes construction of new transmission lines as well as station enhancements to support energization of the new lines. The estimated cost relates to the development and construction phases of the project and the anticipated in-service date reflects anticipated completion in 2027. The first phase of the project is anticipated to be in-serviced in 2026.

3 This Project consists of two phases, which includes the construction of a transmission station and a transmission line to meet the needs of, and is anticipated to be largely funded by, an industrial customer. Phase 1 of the Centennial Transmission Station Project includes a new transmission station in St. Thomas and an approximately 2 km, 230 kV double-circuit transmission line between the new transmission station and an existing transmission station in the city. Phase 1 of the project is anticipated to be in service by the end of 2026. The second phase, an approximately 20 km, 230 kV double-circuit transmission line from London to St. Thomas, is anticipated to be in service by the end of 2027.

4 On August 20, 2026, the IESO released the South and Central Bulk Plan Report (Report). The Report did not identify a need for the second Longwood to Lakeshore Transmission Line. Please see section "Other Developments - Supporting Critical Transmission Infrastructure in Southwestern Ontario" for further information.

5 The capital cost to date relates to costs incurred in the development phase of the project. The scope and timing of the Wawa Timmins Power Line is currently under review. The Independent Electricity System Operator (IESO) has recommended a target in-service date of 2030 for the Wawa Timmins Power Line.

6 Pertains to the First Sudbury Barrie Transmission Line. The scope and timing of the line is currently under review. The IESO has recommended a target in-service date by 2032.

7 The capital cost to date relates to costs incurred in the development phase of the project. The scope and timing of the Windsor Lakeshore Transmission Line is currently under review. The IESO has recommended a target in-service date by 2032 for the Windsor Lakeshore Transmission Line.

8 The Bowmanville to East Greater Toronto Area Power Line was previously referred to as the Bowmanville to Parkway Transmission Line.

9 The IESO has recommended a target in-service date of 2031 for the Waterloo Wellington Power Line and the Wellington Transmission Station in the Township of Puslinch. The Waterloo Wellington Power Line was previously referred to as the Wellington to Preston Transmission Line.

10 The project comprises a double-circuit 230 kV transmission line that runs from Dryden Transformer Station to Ear Falls, continuing to Red Lake Switching Station, with associated station work at Dryden Transformer Station and Ear Falls Transformer Station.

Sustainment Projects

Project Name Location Type

Anticipated In-Service Date

Estimated

Cost1

Capital Cost

To Date

Esplanade x Terauley Underground Cable Replacement

Bridgman Transmission Station Refurbishment

Bruce A Transmission Station Switchyard Replacement

Otto Holden Transmission Station Refurbishment

Merivale Transmission Station Replacement and Upgrades2

Toronto

Southern Ontario

Toronto

Southern Ontario

Tiverton

Southwestern Ontario

Mattawa

Northeast Ontario

Ottawa

Eastern Ontario

(year) (millions of dollars)

Line sustainment

2026

117

103

Station sustainment

2026

108

98

Station sustainment

2027

555

472

Station sustainment

2028

128

93

Station sustainment and upgrade

2029

271

229

Synchronous Optical Network Ontario Telecommunication sustainment

2029

137

26

Essa Transmission Station Circuit Barrie Station sustainment

2030

116

23

Telecommunication Replacement

Breaker Replacement Central Ontario

1 Estimated costs are presented gross of any potential contribution from external parties.

2 The coordinated project includes both an asset replacement and station expansion. The anticipated in-service dates are between 2026 to 2029.

Future Capital Investments

The Company estimates future capital investments based on management's expectations of the amount of capital expenditures that will be required to provide transmission and distribution services that are efficient, reliable, and provide value for customers, consistent with the OEB's Renewed Regulatory Framework. The Company includes projects when there is a high degree of confidence that the project will go forward and when there is a thorough estimate of the expected expenditures.

On August 28, 2025, the Company submitted a Z-Factor application which sought recovery of the incremental revenue requirement associated with $223 million of storm-related costs, including capital and asset removal costs, incurred for a severe storm that began on March 28, 2025. On April 7, 2026, the OEB issued its Decision and Order for the Z-Factor application, denying the recovery of $69 million in incremental revenue requirement.

The Company had updated its plan in the first quarter, for required Broadband investments, consistent with the detailed construction schedule submitted to the Province.

The 2026 and 2027 capital estimates were also updated during the second quarter of 2026 to reflect the estimated costs of the Northeast Power Line and the Longwood to Lakeshore Transmission line projects filed with the OEB on May 19, 2026 through leave-to-construct applications, as well as the Durham Kawartha Power Line project filed with the OEB on June 12, 2026 through a leave-to-construct application (see section "Other Developments" for further details).

The 2026 and 2027 capital estimates have been updated during the three months ended September 30, 2026 to reflect the estimated costs included in the rate application regarding the Waasigan Transmission Line Project for the first phase of the Project (see section "Regulation" for further details). The update also reflects the estimated costs of the North Shore Link project filed with the OEB on September 11, 2026 through a leave-to-construct application (see section "Other Developments" for further details).

Capital investment estimates have been provided for the years 2028 to 2032 following the filing of the proposed transmission and distribution investment plan which forms part of Hydro One Networks' 2028 to 2032 Joint Rate Application (JRAP28), as well as that of HOSSM submitted in the same application (see section "Regulation" for further details). As part of the extended forecast horizon, the disclosure now also includes estimated capital expenditures, including development costs, for projects for which a leave-to-construct application has not yet been filed with the OEB. Once filed, the outlook will be updated to reflect refined project details and cost estimates. The projections and the timing of the transmission and distribution expenditures are subject to approval by the OEB.

The following tables summarize Hydro One's annual projected capital investments for 2026 and 2032 by business segment and by category:

By business segment: (millions of dollars)

2026

2027

2028

2029

2030

2031

2032

Transmission1

2,506

4,325

5,184

5,691

6,499

6,093

5,023

Distribution

1,405

1,598

1,978

1,967

2,339

2,502

2,274

Other

40

32

28

18

24

31

24

Total capital investments

3,951

5,955

7,190

7,676

8,862

8,626

7,321

By category: (millions of dollars)

2026

2027

2028

2029

2030

2031

2032

Sustainment

1,506

1,266

1,673

2,033

2,576

3,016

2,832

Development1

2,279

4,543

5,014

5,230

5,841

5,214

4,137

Other2

166

146

503

413

445

396

352

Total capital investments

3,951

5,955

7,190

7,676

8,862

8,626

7,321

1 Figures also include investments in certain development projects of Hydro One Networks not included in the investment plan filed with the OEB in JRAP28.

2 "Other" capital expenditures include investments in fleet, real estate, IT, and operations technology and related functions.

SUMMARY OF SOURCES AND USES OF CASH

Hydro One's primary sources of cash flows are funds generated from operations, capital market debt issuances and bank credit facilities that are used to satisfy Hydro One's capital resource requirements, including the Company's capital expenditures, servicing and repayment of debt, and dividend payments.

Three

months ended September 30

Nine

months ended September 30

(millions of dollars)

2026

2025

2026

2025

Net cash from operating activities

892

713

1,972

1,828

Net cash (used in) from financing activities

(539)

458

(70)

495

Net cash used in investing activities

(837)

(830)

(2,292)

(2,627)

Net change in cash and cash equivalents

(484)

341

(390)

(304)

Net cash from operating activities

Net cash from operating activities increased by $179 million for the three months ended September 30, 2026, compared to the same period in 2025. The increase was mainly attributable to:

  • changes in net working capital primarily attributable to higher accrued liabilities, and higher cost of power payable to the IESO driven by higher purchased volumes and commodity rate charges, partially offset by timing differences in the settlement of receivables; partially offset by

  • lower pre-tax earnings; and

  • changes in regulatory account balances.

    Net cash from operating activities increased by $144 million for the nine months ended September 30, 2026, compared to the same period in 2025. The increase was mainly attributable to higher pre-tax earnings.

    Net cash (used in) from financing activities

    Net cash from financing activities decreased by $997 million and $565 million for the three and nine months ended September 30, 2026, respectively, compared to the same periods in 2025. This was impacted by various factors, including the following:

    Uses of cash

  • the Company repaid $425 million and $925 million of long-term debt in the three and nine month periods ended September 30, 2026, respectively, compared to $nil and $750 million paid in the same periods last year.

  • the Company repaid $300 million and $2,025 million of short-term notes in the three and nine month periods ended September 30, 2026, respectively, compared to $2,335 million and $4,300 million repaid in the same periods last year.

  • common share dividends paid in the three and nine month periods ended September 30, 2026 were $211 million and $623 million, respectively, compared to dividends of $200 million and $588 million paid in the same periods last year.

    Sources of cash

  • the Company received proceeds of $400 million and $2,125 million from the issuance of short-term notes in the three and nine month periods ended September 30, 2026, respectively, compared to $1,895 million and $5,035 million received in the same periods last year.

  • the Company issued $nil and $1,373 million of long-term debt in the three and nine months ended September 30, 2026, compared to $1,099 million issued in the same periods last year.

Net cash used in investing activities

Net cash used in investing activities increased by $7 million and decreased by $335 million for the three and nine months ended September 30, 2026, respectively, compared to the same periods in 2025. The increase in the third quarter was primarily due to higher additions to future use assets, partially offset by lower capital expenditures. The year-to-date decrease was primarily due to the investment in EWT LP in the prior year (see section "Other Developments - EWT LP"), and lower capital expenditures, partially offset by higher additions to future use assets.

LIQUIDITY AND FINANCING STRATEGY

Short-term liquidity is provided through FFO,3 Hydro One Inc.'s commercial paper program, and the Company's consolidated bank credit facilities. Under the commercial paper program, Hydro One Inc. is authorized to issue up to $2,300 million in short-term notes with a term to maturity of up to 365 days.

As at September 30, 2026, Hydro One Inc. had $199 million in commercial paper borrowings outstanding, compared to

$100 million outstanding at December 31, 2025. The Company also has committed, unsecured, and revolving credit facilities (Operating Credit Facilities) with a total available balance of $3,900 million as at September 30, 2026. The Operating Credit Facilities include a pricing adjustment which can increase or decrease Hydro One's cost of borrowing based on its performance on certain sustainability performance measures, which are related to Hydro One's sustainability goals. On June 1, 2026, Hydro One Inc. increased the committed amount under the Operating Credit Facilities by $600 million and Hydro One and Hydro One Inc. extended the maturity date of the Operating Credit Facilities from 2030 to 2031. No amounts were drawn on the Operating Credit Facilities as at September 30, 2026 or December 31, 2025. The Company may use the Operating Credit Facilities for working capital and general corporate purposes. The short-term liquidity under the commercial paper program, the Operating Credit Facilities, available cash on hand and anticipated levels of FFO3 are expected to be sufficient to fund the Company's operating requirements.

In March 2026, Hydro One Inc. filed a short form base shelf prospectus in connection with its MTN Program, which expires in April 2029. As at September 30, 2026, the Company had long-term debt outstanding in the principal amount of $19,543 million, which included $425 million of long-term debt issued by Hydro One and $19,118 million of long-term debt issued by Hydro One Inc. The majority of long-term debt issued by Hydro One Inc. has been issued under its Medium-Term Note (MTN) Program. The Company's total long-term debt consists of notes and debentures that mature between 2027 and 2064, and as at September 30, 2026 had a weighted-average term to maturity of approximately 13.0 years (December 31, 2025 - 13.7 years) and a weighted-average coupon rate of 4.2% (December 31, 2025 - 4.2%).

On August 18, 2025, Hydro One Inc. filed a short form base shelf prospectus (HOI U.S. Debt Shelf Prospectus) with securities regulatory authorities in Ontario and the U.S. The HOI U.S. Debt Shelf Prospectus allows Hydro One Inc. to offer, from time to time in one or more public offerings, U.S. debt securities, during the 25-month period ending on September 18, 2027. During the three and nine months ended September 30, 2026, US$nil and US$1,000 million senior notes were issued under the HOI U.S. Debt Shelf Prospectus (2025 - US$nil in the same periods last year). No U.S. dollar-denominated long-term debt was repaid during the same periods in 2026 and 2025. To mitigate the foreign currency risk due to exchange rate fluctuations between the

U.S. dollar and the Canadian dollar, the Company entered into a series of cross-currency swap agreements, to convert U.S. dollar-denominated principal and interest cash flows into fixed Canadian dollar-denominated cash flows.

On August 14, 2026, Hydro One filed a short form base shelf prospectus (Universal Base Shelf Prospectus) with securities regulatory authorities in Canada. The Universal Base Shelf Prospectus allows Hydro One to offer, from time to time in one or more public offerings, debt, equity or other securities, or any combination thereof, during the 37-month period ending in September 2029. As at September 30, 2026, no securities have been issued under the Universal Base Shelf Prospectus.

On November 29, 2024, Hydro One Holdings Limited (HOHL) filed a short form base shelf prospectus (HOHL U.S. Debt Shelf Prospectus) with securities regulatory authorities in Ontario and the U.S., that expires in December 2026. The HOHL U.S. Debt Shelf Prospectus allows HOHL to offer, from time to time in one or more public offerings, debt securities, unconditionally guaranteed by Hydro One. As at September 30, 2026, no securities have been issued under the HOHL U.S. Debt Shelf Prospectus. A new HOHL U.S. Debt Shelf Prospectus is expected to be filed in the fourth quarter of 2026.

Compliance

As at September 30, 2026, the Company was in compliance with all financial covenants and limitations associated with the outstanding borrowings and credit facilities.

OTHER OBLIGATIONS Off-Balance Sheet Arrangements

There are no off-balance sheet arrangements that have, or are reasonably likely to have, a material current or future effect on the Company's financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources.

3 See section "Non-GAAP Financial Measures".

Summary of Contractual Obligations and Other Commercial Commitments

The following table presents a summary of Hydro One's debt and other major contractual obligations and commercial commitments:

Less than More than

As at September 30, 2026 (millions of dollars)

Total

1 year

1-3 years

3-5 years

5 years

Contractual obligations (due by year)

Long-term debt - principal repayments

19,543

-

1,725

3,623

14,195

Long-term debt - interest payments

11,111

829

1,592

1,458

7,232

Short-term notes payable

199

199

-

-

-

Pension contributions1

542

77

162

181

122

Outsourcing and other agreements

109

51

40

2

16

Environmental and asset retirement obligations

100

12

4

4

80

Lease obligations

73

14

20

10

29

Total contractual obligations

31,677

1,182

3,543

5,278

21,674

Other commercial commitments (by year of expiry)

Operating Credit Facilities

3,900

-

-

3,900

-

Letters of credit2

177

177

-

-

-

Guarantees3

535

535

-

-

-

Total other commercial commitments

4,612

712

-

3,900

-

1 Contributions to the Hydro One Pension Plan are based on actuarial reports, including valuations performed at least every three years, and actual or projected levels of pensionable earnings, as applicable. The most recent actuarial valuation was performed effective December 31, 2025 and filed on September 21, 2026.

2 Letters of credit consist of $166 million letters of credit related to retirement compensation arrangements, a $3 million letter of credit provided to the IESO for prudential support, and $8 million in letters of credit for various operating purposes.

3 Guarantees consist of $475 million prudential support provided to the IESO by Hydro One Inc. on behalf of its subsidiaries, as well as $60 million of guarantees provided by Hydro One to ONroute relating to OCN LP.

REGULATION Electricity Rates - Joint Rate Application

On October 7, 2026, Hydro One Networks filed a joint rate application for distribution rates and transmission revenue requirement under Custom Incentive Rate-setting frameworks (Custom IR Frameworks) for the five-year period from January 1, 2028 to December 31, 2032. The JRAP28 includes a proposed investment plan supporting Hydro One Networks' transmission and distribution revenue requirements.

The application also seeks approval of HOSSM's transmission revenue requirement for the same period under a Custom IR Framework, supported by a proposed investment plan, as well as approval of HOSSM's transmission revenue requirement for 2027 on a final basis. The following tables summarize the key elements of JRAP28 filed with the OEB:

Hydro One Networks - Transmission Hydro One Networks - Distribution

Rate Base

Revenue

Rate Base

Revenue

Year

(Forecast)

Requirement1

(Forecast)

Requirement1

2028

$19,199 million

$2,727 million

$14,435 million

$2,695 million

2029

$20,661 million

$2,931 million

$15,795 million

$2,998 million

2030

$22,268 million

$3,185 million

$17,136 million

$3,245 million

2031

$24,205 million

$3,365 million

$18,958 million

$3,402 million

2032

$28,470 million

$3,650 million

$20,712 million

$3,541 million

1 Revenue requirement for 2028 to 2032 represents filing estimates utilizing the OEB's 2026 Allowed Return on Equity (ROE) of 9.11%. The ROE is based on the Cost of Capital Parameters released by the OEB on October 31, 2025.The ROE is expected to be updated for 2028 based on the Cost of Capital Parameters in place at that time.

HOSSM

Year

Rate Base (Forecast)

Revenue Requirement1

2027

$346 million

$46 million

2028

$376 million

$50 million

2029

$425 million

$52 million

2030

$456 million

$59 million

2031

$463 million

$59 million

2032

$475 million

$62 million

1 Revenue requirement for 2028 to 2032 represents filing estimates utilizing the OEB's 2026 Allowed ROE of 9.19%. The ROE is based on the Cost of Capital Parameters released by the OEB on October 31, 2025. The ROE is expected to be updated for 2028 based on the Cost of Capital Parameters in place at that time.

Ontario Integrated Energy Plan

On June 12, 2025, the Ontario government released its first integrated energy plan (IEP), Energy for Generations, which aims to leverage electricity, natural gas, hydrogen, storage and other energy sources to provide Ontario with affordable, secure, reliable and clean energy to power growth and jobs across the province. The IEP establishes a planning horizon out to 2050, including the acceleration of the development of transmission infrastructure and the modernization of the distribution grid. As part of the IEP, the government announced the advancement of several transmission projects, including those aimed to enhance transmission capacity between Northern and Southern Ontario, east of Toronto, in Southwestern Ontario and in Northern Ontario.

The IEP also addressed the need for additional transmission capacity in the Red Lake Area in Northwestern Ontario. In August 2025, the IESO released the Northwest Region Integrated Regional Resource Plan Addendum (Addendum). The Addendum recommends the urgent development of the Red Lake Transmission Line, a double-circuit 230 kV transmission line that will run from Dryden Transformer Station to Ear Falls Transformer Station, and another double-circuit 230 kV transmission line that will run from Ear Falls Transformer Station to Red Lake Switching Station, along with associated station facilities, to meet growing capacity needs after 2028. The project is expected to be in service by the early 2030s. On October 29, 2025, the Ministry of Energy and Mines (Ministry) announced a proposal to bring forward an Order in Council (to be recommended by the Minister) to declare the projects as priority and a companion directive, that would, if approved, direct the OEB to amend Hydro One Networks' transmitter licence to require it to undertake development work and seek all necessary approvals to construct the projects. The consultation period for the proposal closed on December 13, 2025.

On April 23, 2026 the Minister notified the OEB that the two lines were declared priority projects, and issued a directive to the OEB to amend Hydro One Networks' transmission licence, to require it to develop and seek approvals for the projects. On April 28, 2026, further to the Minister's Directive, the OEB amended Hydro One Networks' electricity transmission licence to allow it to develop and seek approvals for the projects in accordance with the recommendations of the IESO.

IESO's Transmitter Selection Framework

On July 31, 2025, the IESO announced the launch of the Transmitter Selection Framework (TSF) Registry. Registration enables transmitters to participate in future competitive IESO transmission procurements. Hydro One submitted an application to be included in the TSF Registry. On May 20, 2026, Hydro One was approved as a TSF Registrant by the IESO.

Next Generation Rate Framework Consultation

On January 8, 2026, the OEB announced a new policy consultation to develop an updated rate-setting framework for electricity distributors. The consultation will bring together existing OEB consultations under a new comprehensive policy consultation known as the Next Generation Rate Framework (Framework) consultation. The OEB plans to build on the Renewed Regulatory Framework that was established in 2012, given the significant changes in the energy and policy landscape. The OEB consulted on the scope of the review in January and February 2026, including reviewing all aspects of its current ratemaking policies to ensure that they continue to facilitate the cost-effective and efficient implementation of the government's policy objectives.

Building Broadband Faster Act, 2021

A regulation regarding electricity infrastructure and designated broadband projects under the Ontario Energy Board Act, 1998 (OEBA) (O.Reg. 410/22) came into force on April 21, 2022, and on March 28, 2023, the Province amended the OEBA (O.Reg. 410/22) with respect to performance timelines associated with designated broadband projects.

On October 31, 2024, the Ministry of Infrastructure (MOI) announced that it had developed a program to deliver up to $400 million in subsidies to internet service providers (ISPs) for work associated with designated broadband projects. The program is intended to enable ISPs to successfully and safely attach their material and equipment to the Company's poles to bring connectivity to rural communities as part of a designated broadband project. A portion of the subsidies will be used to reimburse Hydro One Networks on behalf of ISPs for their share of enablement costs incurred to facilitate the program to date (see section "Related Party Transactions"). On April 27, 2026, the Ministry increased the maximum subsidies to $482 million.

Waasigan Transmission LP

On July 3, 2026, Hydro One Networks, on behalf of Waasigan Transmission LP (WTLP), submitted WTLP's 2027 Transmission Revenue Requirement Application, seeking revenue requirement of $41.8 million related to 2027, and $5.4 million for the period of 2026 when the Waasigan Transmission Line (phase 1) assets will be placed in-service. On October 29, 2026, a settlement proposal was filed with the OEB and is currently awaiting OEB approval. (See Section "Other Developments - Supporting Critical Transmission Infrastructure in Northwestern Ontario" for further information.)

OTHER DEVELOPMENTS EWT LP

On March 4, 2025, Hydro One Networks completed the acquisition of an approximate 48% interest in the EWT LP for

approximately $261 million in cash, including closing adjustments. The partnership owns the East-West Tie Line, a 450-kilometre, 230-kV double-circuit transmission line spanning between Wawa and Thunder Bay, along the north shore of Lake Superior. In February 2026, Bamkushwada Limited Partnership, a group of First Nation Partners, exercised its right to acquire additional interest in EWT LP. Following the transaction, Hydro One's ownership in EWT LP was diluted to 40%.

Exemptive Relief

On September 30, 2026, Hydro One was granted exemptive relief by the securities regulators in each province and territory of Canada that allows Hydro One to continue to report its financial results in accordance with U.S. GAAP (the "Exemptive Relief"). The Exemptive Relief will remain in effect until the earliest to occur of the following: (i) if Hydro One ceases to have rate-regulated activities, the first day of Hydro One's financial year that commences after it ceases to have such rate-regulated activities; and (ii) January 1, 2031, being the first day of Hydro One's financial year that commences on or following the fourth anniversary of the publication of International Financial Reporting Standards (IFRS) 20, Regulatory Assets and Regulatory Liabilities (IFRS 20) by the International Accounting Standards Board (IASB). IFRS 20 is the final IFRS standard applicable to entities with rate-regulated activities, which was issued by the IASB on May 27, 2026, and is effective for annual reporting periods beginning on or after January 1, 2029, with early application permitted.

Hydro One is also permitted to report its financial results in accordance with U.S. GAAP by virtue of being, and for so long as it remains, an "SEC issuer" (within the meaning of National Instrument 52-107 - Acceptable Accounting Principles and Auditing Standards). There can be no assurance that Hydro One will remain an SEC issuer indefinitely.

Supporting Critical Transmission Infrastructure in Southwestern Ontario

On March 31, 2022, the Minister (formerly the Minister of Energy) directed the OEB to amend Hydro One Networks' licence to require it to develop and seek approvals for four priority transmission line projects to meet growing electricity demand in Southwestern Ontario, including the Longwood to Lakeshore Transmission Line and a second Longwood to Lakeshore Transmission Line. On April 7, 2022, further to the Minister's Directive, the OEB amended Hydro One Networks' electricity transmission licence to require it to develop and seek approvals for the projects in accordance with the recommendations of the IESO.

On May 19, 2026, Hydro One Networks filed a leave-to-construct application seeking OEB approval for the Longwood to Lakeshore Transmission Line, a single-circuit 500 kV transmission line between the Longwood Transformer Station in the Municipality of Strathroy-Caradoc and the Lakeshore Transformer Station in the Municipality of Lakeshore.

On August 20, 2026, the IESO issued the South and Central Bulk Plan (Plan) that identified near and medium-term reinforcements to ensure that the transmission system across Southern and Central Ontario is equipped to meet emerging challenges and opportunities. The Plan identified a preferred alternative to the Second Longwood to Lakeshore Transmission Line. The new transmission line would run between the Lakeshore Transformer Station and the St. Thomas Transformer Station, with an anticipated in-service beyond 2045. As a result, Hydro One has ceased all further development work on the Second Longwood to Lakeshore Transmission Line.

Supporting Critical Transmission Infrastructure in Northwestern Ontario

On April 16, 2024, the OEB issued its Decision and Order granting Hydro One Networks leave to construct the Waasigan Transmission Line Project, with standard conditions of approval.

On March 20, 2026, WTLP was formed to own and operate the transmission line, and Waasigan Transmission GP Inc. (WTGP) was formed as the General Partner of WTLP. On July 20, 2026, Hydro One Networks, on behalf of WTGP, requested certain approvals from the OEB, including obtaining an electricity transmission licence for WTGP, as a general partner on behalf of WTLP, and approval for Hydro One Networks to sell assets related to the Waasigan Transmission Line Project to WTGP, as a general partner on behalf of WTLP. On August 13, 2026, the OEB approved the application.

Supporting Critical Transmission Infrastructure in Northeastern and Eastern Ontario

On July 10, 2023, the Ministry announced a proposal to take certain actions to facilitate the timely development of three priority transmission line projects across Northeastern and Eastern Ontario: the North Shore Link, the Northeast Power Line and the Durham Kawartha Power Line. On October 23, 2023, the Minister (formerly the Minister of Energy) directed the OEB to amend Hydro One Networks' licence to require it to develop and seek approvals for the three projects. On November 14, 2023, further to the Minister's Directive, the OEB amended Hydro One Networks' electricity transmission licence to require it to develop and seek approvals for the projects in accordance with the recommendations of the IESO.

On May 19, 2026, Hydro One Networks filed a leave-to-construct application seeking the OEB's approval for the Northeast Power Line, a single-circuit 500 kV transmission line between Hanmer Transformer Station in the Greater Sudbury Area, and the Mississagi Transformer Station, near Wharncliffe.

On June 12, 2026, Hydro One Networks filed a leave-to-construct application seeking the OEB's approval for the Durham Kawartha Power Line, a new double-circuit, 230 kV transmission line between Clarington Transformer Station in the Municipality of Clarington, and Dobbin Transformer Station in Peterborough County. On September 11, 2026, Hydro One Networks and HOSSM filed a joint leave-to-construct application seeking the OEB's approval for the North Shore Link, a new 230 kV transmission line connecting Mississagi Transformer Station near Wharncliffe, to HOSSM-owned Third Line Transformer Station in Sault Ste. Marie. HOSSM will manage all upgrades to the Third Line Transformer Station.

Orléans Area Reinforcement Project

The IESO-led regional planning process for the Greater Ottawa Region identified growing electricity demand in the Orléans area. In 2022, the Greater Ottawa Regional Planning Technical Working Group recommended that additional electricity supply be provided to meet forecast load growth, including a new 230 kV supply from Hawthorne Transformer Station to Orléans Transformer Station. On May 29, 2026, Hydro One Networks Inc. filed a leave-to-construct application seeking the OEB's approval for the Orléans Area Reinforcement Project consistent with the regional planning recommendations. The Project includes the construction of a new 115 kV transmission line within an existing transmission corridor between Hawthorne Transformer Station and Orléans Transformer Station, located in the Greater Ottawa Area. The project also includes converting an existing 115 kV transmission line between the two stations to a standard 230 kV transmission line. See section "Major Transmission Capital Investment Projects" for additional information.

Collective Agreements

On March 23, 2026, Hydro One and the Canadian Union of Skilled Workers (CUSW) commenced collective bargaining. The prior Hydro One - CUSW collective agreement expired on April 30, 2026. On April 24, 2026, Hydro One and CUSW reached a tentative agreement for a renewal collective agreement. On June 11, 2026, the agreement was ratified by the CUSW-represented employees for a term from May 1, 2026 to April 30, 2030.

Bill C-15, Budget 2025 Implementation Act, No.1

On March 26, 2026, Bill C-15, An Act to implement certain provisions of the budget tabled in Parliament on November 4, 2025, received Royal Assent.

Impact

Federal budget measures enacted as part of Bill C-15 included time-limited investment incentives permitting Hydro One to claim enhanced capital cost allowance of up to three times the first-year rate for eligible capital investments acquired after 2024 and placed in-service before 2034. The re-introduction of accelerated capital cost allowance temporarily reduces the Company's ETR and results in the recognition of a tax regulatory liability for the amounts that have not been reflected in OEB-approved rates.

Estimated ETR Change

The re-introduction of accelerated capital cost allowance is expected to lower the Company's ETR to a range of approximately 11% to 15% for the rate period ending 2027.

HYDRO ONE BOARD OF DIRECTORS AND EXECUTIVE OFFICERS Board of Directors

Effective February 19, 2026, Debbie (Deb) Hutton was appointed to the Board. Effective June 9, 2026, Perrin Beatty was elected to the Board.

Directors Helga Reidel and Mitch Panciuk did not stand for re-election at the Annual Meeting of Shareholders on June 9, 2026.

Executive Officers

Effective June 9, 2026, David Lebeter retired from his role as President and Chief Executive Officer (CEO). Effective the same day, Megan Telford was appointed as President and CEO. David Lebeter remained with Hydro One as a Special Advisor until October 10, 2026.

NON-GAAP FINANCIAL MEASURES

Hydro One uses a number of non-GAAP financial measures to assess its performance. The Company presents FFO or "funds from operations" to reflect a measure of the Company's cash flow; revenues, net of purchased power, to reflect the impact of revenue on net income; and net debt to reflect a measure of the Company's financial leverage.

Hydro One also uses financial ratios that are non-GAAP ratios such as the net debt to capitalization ratio and annualized FFO to net debt ratio to reflect a measure of the Company's financial leverage, and the earnings coverage ratio to reflect a measure of liquidity.

FFO

FFO is defined as net cash from operating activities, adjusted for changes in non-cash balances related to operations and distributions to noncontrolling interest. Management believes that FFO is helpful as a supplemental measure of the Company's operating cash flows as it excludes timing-related fluctuations in non-cash operating working capital and cash flows not attributable to common shareholders. As such, management believes that FFO provides a consistent measure of the cash generating performance of the Company's assets.

The following table provides a reconciliation of reported GAAP results to non-GAAP results on a consolidated basis.

Three

months ended September 30

Nine

months ended September 30

(millions of dollars)

2026

2025

2026

2025

Net cash from operating activities

892

713

1,972

1,828

Changes in non-cash balances related to operations

(226)

(31)

111

161

Distributions to noncontrolling interest

(3)

(4)

(9)

(11)

FFO

663

678

2,074

1,978

Revenues, Net of Purchased Power

Revenues, net of purchased power, is defined as revenues less the cost of purchased power; distribution revenues, net of purchased power, is defined as distribution revenues less the cost of purchased power. These measures are used internally by management to assess the impacts of revenue on net income and are considered useful because they exclude the cost of power that is fully recovered through revenues and therefore net income neutral.

The following tables provide a reconciliation of reported GAAP revenues to non-GAAP revenues, net of purchased power, on a consolidated basis.

Quarter ended (millions of dollars)

Sep 30, 2026

Jun 30, 2026

Mar 31, 2026

Dec 31, 2025

Sep 30, 2025

Jun 30, 2025

Mar 31, 2025

Dec 31, 2024

Revenues

2,491

2,302

2,648

2,268

2,299

2,066

2,408

2,095

Less: Purchased power

1,204

1,071

1,424

1,287

1,080

899

1,220

1,060

Revenues, net of purchased power

1,287

1,231

1,224

981

1,219

1,167

1,188

1,035

Quarter ended (millions of dollars)

Sep 30, 2026

Jun 30, 2026

Mar 31, 2026

Dec 31, 2025

Sep 30, 2025

Jun 30, 2025

Mar 31, 2025

Dec 31, 2024

Distribution revenues

1,742

1,619

1,970

1,757

1,605

1,434

1,761

1,583

Less: Purchased power

1,204

1,071

1,424

1,287

1,080

899

1,220

1,060

Distribution revenues, net of purchased power

538

548

546

470

525

535

541

523

Net Debt

The Company uses net debt as an alternative measure of outstanding debt. Management considers net debt as an important measure in assessing the financial leverage of the Company. Net debt is used by management to assess the Company's overall debt position and financial leverage.

The following table provides a reconciliation of net debt as reported in the Company's Consolidated Financial Statements.

As at (millions of dollars)

Sep 30, 2026

Dec 31, 2025

Short-term notes payable

199

100

Less: cash and cash equivalents

(159)

(549)

Long-term debt (current portion)

-

925

Long-term debt (long-term portion)

19,508

18,092

Net Debt

19,548

18,568

Net Debt to Capitalization Ratio

The Company believes that the net debt to capitalization ratio is an important non-GAAP ratio as a measure of the Company's financial leverage. Net debt to capitalization ratio has been calculated as net debt, as described above, divided by net debt plus total shareholders' equity, but excluding any amounts related to noncontrolling interest. Management believes that the net debt to capitalization ratio is helpful as a measure of the proportion of debt in the Company's capital structure.

As at (millions of dollars)

Sep 30, 2026

Dec 31, 2025

Net debt (A)

19,548

18,568

Shareholders' equity (excluding noncontrolling interest)

13,192

12,648

Net debt plus shareholders' equity (B)

32,740

31,216

Net Debt to capitalization ratio (A/B)

59.7 %

59.5 %

Annualized FFO to Net Debt

Management believes that the annualized FFO to net debt ratio is helpful as a measure of the Company's financial leverage. Annualized FFO to net debt ratio has been calculated as FFO (see section "Non-GAAP Financial Measures - FFO") on a rolling twelve-month period divided by net debt at the period end date (see section "Non-GAAP Financial Measures - Net Debt"). Management believes the annualized FFO to net debt ratio is helpful as a measure of the company's ability to pay off its debt using the Company's net operating income.

The following table provides a reconciliation of reported GAAP results to non-GAAP results on a consolidated basis.

Twelve months and period ended (millions of dollars)

Sep 30, 2026

Jun 30, 2026

Mar 31, 2026

Dec 31, 2025

Sep 30, 2025

Jun 30, 2025

Mar 31, 2025

Dec 31, 2024

Annualized FFO (A)

2,726

2,741

2,652

2,630

2,489

2,450

2,356

2,275

Net Debt (B)

19,548

19,385

19,080

18,568

18,346

18,030

17,615

16,963

Annualized FFO to Net Debt (A/B)

13.9 %

14.1 %

13.9 %

14.2 %

13.6 %

13.6 %

13.4 %

13.4 %

Earnings Coverage Ratio

Earnings coverage ratio is defined as earnings before income taxes, financing charges and equity income (loss) attributable to shareholders, divided by the sum of financing charges and capitalized interest, and is calculated on a rolling twelve-month basis. The Company believes that the earnings coverage ratio is an important non-GAAP measure in the management of its liquidity.

Quarter ended (millions of dollars)

Sep 30, 2026

Jun 30, 2026

Mar 31, 2026

Dec 31, 2025

Sep 30, 2025

Jun 30, 2025

Mar 31, 2025

Dec 31, 2024

Net income attributable to common shareholders

413

370

391

233

421

327

358

200

Income tax expense

60

69

41

30

60

61

68

17

Financing charges

188

181

176

175

172

169

163

158

Equity income (loss)

4

4

(11)

3

6

-

-

-

Earnings before income taxes, financing charges and equity income (loss) attributable to common

657

616

619

435

647

557

589

375

shareholders

Twelve months ended (millions of dollars)

Sep 30, 2026

Dec 31, 2025

Earnings before income taxes, financing charges and equity income (loss) attributable to common shareholders (A)

2,327 2,228

Quarter ended (millions of dollars)

Sep 30, 2026

Jun 30, 2026

Mar 31, 2026

Dec 31, 2025

Sep 30, 2025

Jun 30, 2025

Mar 31, 2025

Dec 31, 2024

Financing charges

188

181

176

175

172

169

163

158

Capitalized interest

34

31

29

29

30

27

24

24

Financing charges and capitalized interest

222

212

205

204

202

196

187

182

Twelve months ended (millions of dollars)

Sep 30, 2026

Dec 31, 2025

Financing charges and capitalized interest (B)

843

789

Earnings coverage ratio = A/B

2.8

2.8

RELATED PARTY TRANSACTIONS

The Province is a shareholder of Hydro One with approximately 47.1% ownership as at September 30, 2026. The Ministry and MOI are related parties to Hydro One because they are controlled by the Province. The IESO, Ontario Power Generation Inc. (OPG), Ontario Electricity Financial Corporation (OEFC), and the OEB are related parties to Hydro One because they are controlled or significantly influenced by the Ministry. Hydro One also has transactions in the normal course of business with various government ministries and organizations in Ontario that fall under the purview of the Province. The following is a summary of the Company's related party transactions during the three and nine months ended September 30, 2026 and 2025:

(millions of dollars)

Three months ended

September 30

Nine months ended September 30

Related Party

Transaction

2026

2025

2026

2025

Province

Dividends paid

100

94

294

276

Ministry

Broadband subsidy1,2

27

-

54

-

MOI

Broadband subsidy1,2

-

9

-

28

IESO

Power purchased

771

638

2,525

2,012

Revenues for transmission services

726

671

2,045

1,905

Amounts related to electricity rebates

391

244

1,217

752

Distribution revenues related to rural rate protection

64

64

191

191

Distribution revenues related to Wataynikaneyap Power LP

25

34

75

100

Distribution revenues related to supply of electricity to remote northern communities

13

12

39

37

Funding received related to Conservation and Demand Management programs

-

-

1

-

OPG

Power purchased

7

4

27

18

Transmission revenues related to provision of services and supply of electricity

-

-

1

1

Distribution revenues related to provision of services and supply of electricity

1

2

5

6

Other revenues related to provision of services and supply of electricity

1

-

2

1

Capital contribution received from OPG

3

1

10

17

Costs related to the purchase of services

1

1

1

2

OEFC

Power purchased from power contracts administered by the OEFC

-

1

2

2

OEB

OEB fees

5

4

13

10

1 During 2025, Ministry replaced MOI in making broadband subsidy payments to Hydro One.

2 On October 31, 2024, the MOI announced that it has developed a program to deliver up to $400 million in subsidies to ISPs for work associated with designated broadband projects. Effective April 2026, this was increased by the Ministry to up to $482 million.

RISK MANAGEMENT AND RISK FACTORS

Hydro One is subject to numerous risks and uncertainties. Critical to Hydro One's success is the identification, management, and to the extent possible, mitigation of these risks. Hydro One's Enterprise Risk Management program assists decision-makers throughout the organization with the management of key business risks, including new and emerging risks and opportunities.

A discussion of the material risks relating to Hydro One and its business that the Company believes would be the most likely to influence an investor's decision to purchase Hydro One's securities can be found under the heading "Risk Management and Risk Factors" in the 2025 MD&A.

DISCLOSURE CONTROLS AND PROCEDURES AND INTERNAL CONTROL OVER FINANCIAL REPORTING

Management is responsible for establishing and maintaining adequate disclosure controls and procedures and internal control over financial reporting as defined in National Instrument 52-109 Certification of Disclosure in Issuers' Annual and Interim Filings. Internal control, no matter how well designed and operated, can provide only reasonable assurance of achieving the desired control objectives and due to its inherent limitations, may not prevent or detect all misrepresentations.

There were no changes in the Company's internal control over financial reporting during the three months ended September 30, 2026 that materially affected, or are reasonably likely to materially affect, the Company's disclosure controls and procedures and internal control over financial reporting.

NEW ACCOUNTING PRONOUNCEMENTS

The following table presents Accounting Standards Updates (ASUs) issued by the Financial Accounting Standards Board (FASB) that are applicable to Hydro One:

Recently Adopted Accounting Guidance

Guidance

Date issued

Description

ASU Effective Date

Impact on Hydro One

ASU

July 2025

The amendments allow all entities to use a practical

Annual and interim

No impact upon

2025-05

expedient when estimating expected credit losses for

periods beginning after

adoption

current accounts receivable and contract assets under

December 15, 2025.

Topic 606, by assuming that current conditions as of the

balance sheet date remain unchanged over the asset's

life. Additionally, entities other than public business

entities that elect this expedient may adopt an accounting

policy to consider post-balance sheet date collection

activity in their credit loss estimates.

Recently Issued Accounting Guidance Not Yet Adopted

Guidance Date issued Description ASU Effective Date

Anticipated Impact on Hydro One

ASU 2023-06

ASU 2024-03

October 2023

November 2024

The amendments represent changes to clarify or improve disclosure or presentation requirements of a variety of subtopics in the FASB Codification. Many of the amendments allow users to more easily compare entities subject to the U.S. Securities and Exchange's (SEC) existing disclosures with those entities that were not previously subject to the SEC's requirements. Also, the amendments align the requirements in the Codification with the SEC's regulations.

Applicable to all entities, if by June 30, 2027 the SEC has not removed the applicable requirement from Regulation S-X or Regulation S-K, the pending content of the related amendment will be removed from the Codification and will not become effective for any entity.

The amendments require public business entities to disclose additional information about specific expense categories in the notes to financial statements at interim and annual reporting periods, which are not generally presented in the current financial statements.

Two years subsequent to the date on which the SEC's removal of that related disclosure becomes effective.

Annual periods beginning after December 15, 2026, and interim periods beginning after December 15, 2027.

Under assessment

Under assessment

ASU 2025-03

May 2025 The amendments require entities to apply the guidance for identifying the accounting acquirer in transactions where a business that qualifies as a Variable Interest Entity is acquired through the exchange of equity interests.

Annual and interim periods beginning after December 15, 2026.

No expected impact upon adoption

ASU 2025-06

ASU 2025-09

ASU 2025-10

ASU 2025-11

ASU 2025-12

September 2025

November 2025

December 2025

December 2025

December 2025

The amendments modernize accounting for internal-use software by removing outdated development stage references and introducing a capitalization threshold based on management authorization and project completion probability.

The amendments expand hedge-accounting eligibility and better align the guidance with common risk-management practices. Key updates allow grouping forecasted transactions with similar exposure, simplify hedging of choose-your-rate variable-rate debt, and broaden eligibility for hedging nonfinancial components. The guidance modernizes treatment of certain option-based derivatives and resolves mismatches in dual hedge relationships.

The amendments establish authoritative GAAP for government grants, setting recognition, measurement, presentation, and disclosure requirements.

The amendments clarify interim reporting by establishing a complete list of required GAAP interim disclosures. They introduce a disclosure principle requiring entities to report material events occurring after the annual reporting period. The Update also clarifies types of interim reports and the form and content of interim financial statements. Overall, the changes enhance clarity and consistency without altering existing disclosure requirements.

The amendments clarify existing guidance, correct errors, and introduce minor improvements to numerous Codification Topics, thereby making the requirements easier for entities to understand and apply.

Annual and interim periods beginning after December 15, 2027.

Annual and interim periods beginning after December 15, 2026.

Annual and interim periods beginning after December 15, 2028.

Interim reporting periods within annual reporting periods beginning after December 15, 2027.

Annual and interim periods beginning after December 15, 2026.

Under assessment

No expected impact upon adoption

Under assessment

Under assessment

No expected impact upon adoption

ASU 2026-02

May 2026 The amendments establish authoritative guidance on the accounting and disclosure of environmental credits and environmental credit obligations. The guidance establishes a consistent framework for recognizing, measuring, presenting, and disclosing environmental credits and related compliance obligations arising from regulatory compliance programs. Overall, the changes improve comparability, transparency, and consistency in financial reporting.

Annual and interim periods beginning after December 15, 2027.

Under assessment

HYDRO ONE HOLDINGS LIMITED - CONSOLIDATING SUMMARY FINANCIAL INFORMATION

Hydro One Limited fully and unconditionally guarantees the payment obligations of its wholly-owned subsidiary HOHL issuable under the short form base shelf prospectus dated November 29, 2024. Accordingly, the following consolidating summary financial information is provided in compliance with the requirements of section 13.4 of National Instrument 51-102 - Continuous Disclosure Obligations providing for an exemption for certain credit support issuers. The tables below contain consolidating summary financial information as at September 30, 2026 and December 31, 2025 and for the three and nine months ended September 30, 2026 and September 30, 2025 for: (i) Hydro One Limited; (ii) HOHL; (iii) the subsidiaries of Hydro One Limited, other than HOHL, on a combined basis; (iv) consolidating adjustments; and (v) Hydro One Limited and all of its subsidiaries on a consolidated basis, in each case for the periods indicated. Such summary financial information is intended to provide investors with meaningful and comparable financial information about Hydro One Limited and its subsidiaries. This summary financial information should be read in conjunction with Hydro One Limited's most recently issued annual and interim financial statements. This summary financial information has been prepared in accordance with U.S. GAAP, as issued by the FASB.

Three months ended September 30

(millions of dollars) Hydro One Limited HOHL

Subsidiaries of Hydro One Limited, other than HOHL

Consolidating Adjustments

Total Consolidated Amounts of Hydro One Limited

2026

2025

2026

2025

2026

2025

2026

2025

2026

2025

Revenue

212

200

-

-

2,757

2,576

(478)

(477)

2,491

2,299

Net Income (Loss) Attributable to Common Shareholders

218

208

-

-

645

648

(450)

(435)

413

421

Nine months ended September 30

(millions of dollars) Hydro One Limited HOHL

Subsidiaries of Hydro One Limited, other than HOHL

Consolidating Adjustments

Total Consolidated Amounts of Hydro One Limited

2026

2025

2026

2025

2026

2025

2026

2025

2026

2025

Revenue

625

594

-

-

8,230

7,578

(1,414)

(1,399)

7,441

6,773

Net Income (Loss) Attributable to Common Shareholders

648

617

-

-

1,863

1,789

(1,337)

(1,300)

1,174

1,106

As at September 30, 2026 and

December 31, 2025

(millions of dollars) Hydro One Limited HOHL

Subsidiaries of Hydro One Limited, other than HOHL

Consolidating Adjustments

Total Consolidated Amounts of Hydro One Limited

Sep. 2026

Dec. 2025

Sep. 2026

Dec. 2025

Sep. 2026

Dec. 2025

Sep. 2026

Dec. 2025

Sep. 2026

Dec. 2025

Current Assets

953

940

-

-

2,903

4,172

(1,977)

(2,938)

1,879

2,174

Non-Current Assets

3,319

3,295

-

-

63,181

59,529

(26,750)

(25,327)

39,750

37,497

Current Liabilities

1,082

1,075

-

-

3,602

5,420

(1,975)

(2,905)

2,709

3,590

Non-Current Liabilities

425

425

-

-

44,134

40,475

(18,955)

(17,565)

25,604

23,335

FORWARD-LOOKING STATEMENTS AND INFORMATION

The Company's oral and written public communications, including this document, often contain "forward-looking information" within the meaning of applicable Canadian securities laws and "forward-looking statements" within the meaning of applicable

U.S. securities laws (collectively, "forward-looking information"). Statements containing forward-looking information are made pursuant to the "safe harbour" provisions of applicable Canadian and U.S. securities laws. Forward-looking information in this document is based on current expectations, estimates, forecasts and projections about the Company's business, the industry, regulatory and economic environments in which it operates, and includes beliefs and assumptions made by the management of the Company. Such statements include, but are not limited to, statements regarding: the Company's corporate strategy; the Company's transmission and distribution rate and revenue requirement applications including the JRAP28, expected ROE update, and its proposed investment plan, resulting and related decisions as well as resulting rates, recovery and expected impacts and timing; the Province's subsidy program, including the expected use of subsidies to reimburse Hydro One Networks for enablement costs; the IESO's TSF and future competitive transmission procurements; expectations about the Company's liquidity and capital resources and operational requirements; sustainability goals; the Operating Credit Facilities; expectations regarding the Company's financing activities, including the Company's expectation that a new HOHL U.S. Debt Shelf Prospectus will be filed in the fourth quarter of 2026; expectations that the re-introduction of an accelerated capital cost allowance will lower the Company's ETR to 11% to 15% during the current rate period (to 2027); the Company's maturing debt; expectations and impact of the Company's credit ratings; the Company's ongoing and planned projects (including construction of transmission stations and lines) and expected capital investments and plans, including expected scope, approvals, results, costs, funding sources (including anticipated funding from customers) and in-service and completion dates; cross-currency swap agreements; off-balance sheet arrangements; contractual obligations and other commercial commitments; future pension plan contributions, including estimates of total Company pension contributions; the expected advancement and construction of various transmission

stations and transmission lines in connection with the Province's integrated energy plan and the target in-service dates; collective agreements and bargaining; dividends; non-GAAP financial measures; internal controls over financial reporting and disclosure; the MTN Program; the Exemptive Relief and the Company's ability to continue to report its financial results in accordance with

U.S. GAAP; and accounting-related guidance and expected impacts. Words such as "expect," "anticipate," "intend," "attempt," "may," "plan," "will," "would," "believe," "seek," "estimate," "goal," "aim," "target," and variations of such words and similar expressions are intended to identify such forward-looking statements. These statements are not guarantees of future performance and involve assumptions and risks and uncertainties that are difficult to predict. Therefore, actual outcomes and results may differ materially from what is expressed, implied or forecasted in such forward-looking statements. Hydro One does not intend, and it disclaims any obligation, to update any forward-looking statements, except as required by law.

These forward-looking statements are based on a variety of factors and assumptions including, but not limited to, the following: no unforeseen changes in the legislative and operating framework for Ontario's electricity market or for Hydro One specifically; favourable decisions from the OEB and other regulatory bodies concerning outstanding and future rate and other applications; no unexpected delays in obtaining required regulatory approvals; no unforeseen changes in rate orders or rate setting methodologies for the Company's distribution and transmission businesses; no unfavourable changes in environmental regulation; continued use of U.S. GAAP; a stable regulatory environment; no significant changes to the Company's current credit ratings; no unforeseen impacts of new accounting pronouncements; no changes to expectations regarding electricity consumption; no unforeseen changes to economic and market conditions; completion of operating and capital projects that have been deferred; and no significant event occurring outside the ordinary course of business. These assumptions are based on information currently available to the Company, including information obtained from third-party sources. Actual results may differ materially from those predicted by such forward-looking statements. While Hydro One does not know what impact any of these differences may have, the Company's business, results of operations, financial condition and credit stability may be materially adversely affected if any such differences occur. Factors that could cause actual results or outcomes to differ materially from the results expressed or implied by forward-looking statements include, among other things:

  • regulatory risks and risks relating to Hydro One's revenues, including risks relating to actual performance against forecasts, competition with other transmitters and other applications to the OEB, the rate-setting models for transmission and distribution, the recoverability of capital expenditures, obtaining rate orders or recoverability of total compensation costs;

  • risks associated with the Province's share ownership of Hydro One and other relationships with the Province, including potential conflicts of interest that may arise between Hydro One, the Province and related parties, risks associated with the Province's exercise of further legislative and regulatory powers, risks relating to the ability of the Company to attract and retain qualified executive talent or the risk of a credit rating downgrade for the Company and its impact on the Company's funding and liquidity;

  • risks relating to the location of the Company's assets on Reserve lands, that the Company's operations and activities may give rise to the Crown's duty to consult and potentially accommodate Indigenous communities, and the risk that Hydro One may incur significant costs associated with transferring assets located on Reserves;

  • the risk that the Company may be unable to comply with regulatory and legislative requirements or that the Company may incur additional costs for compliance that are not recoverable through rates;

  • the risk of exposure of the Company's facilities to the effects of severe weather conditions, natural disasters, man-made events or other unexpected occurrences for which the Company is uninsured or for which the Company could be subject to claims for damage;

  • risks associated with information system security and maintaining complex information technology and OT system infrastructure, including system failures or risks of cyber-attacks or unauthorized access to corporate information technology and OT systems;

  • the risk of non-compliance with environmental regulations and inability to recover environmental expenditures in rate applications and the risk that assumptions that form the basis of the Company's recorded environmental liabilities and related regulatory assets may change;

  • the risk of labour disputes and inability to negotiate or renew appropriate collective agreements on acceptable terms consistent with the Company's rate decisions;

  • the risk that the Company may not be able to execute plans for capital projects necessary to maintain the performance of the Company's assets or to carry out projects in a timely manner or the risk of increased competition for the development of large transmission projects or legislative changes affecting the selection of transmitters;

  • risks associated with asset condition, capital projects and innovation, including public opposition to or delays or denials of the requisite approvals and accommodations for the Company's planned projects;

  • risks related to the Company's work force demographic and its potential inability to attract and retain qualified personnel;

  • the risk that the Company is not able to arrange sufficient cost-effective financing to repay maturing debt and to fund capital expenditures, the risk of a downgrade in the Company's credit ratings or risks associated with investor interest in ESG performance and reporting;

  • risks associated with fluctuations in interest rates and failure to manage exposure to credit and financial instrument risk;

  • risks associated with economic uncertainty and financial market volatility;

  • the risk of failure to mitigate significant health and safety risks;

  • the risk of not being able to recover the Company's pension expenditures in future rates and uncertainty regarding the future regulatory treatment of pension, other post-employment benefits and post-retirement benefits costs;

  • the impact of the ownership by the Province of lands underlying the Company's transmission system;

  • the risk associated with legal proceedings that could be costly, time-consuming or divert the attention of management and key personnel from the Company's business operations;

  • the impact if the Company does not have valid occupational rights on third-party owned or controlled lands and the risks associated with occupational rights of the Company that may be subject to expiry;

  • risks relating to adverse reputational events or political actions relating to Hydro One and the electricity industry;

  • the potential that Hydro One may incur significant expenses to replace functions currently outsourced if agreements are terminated or expire before a new service provider is selected;

  • risks relating to acquisitions, including the failure to realize the anticipated benefits of such transactions at all, or within the time periods anticipated, and unexpected costs incurred in relation thereto;

  • risks relating to an outbreak of infectious disease;

  • the inability to continue to prepare financial statements using U.S. GAAP; and

  • the risk related to the impact of any new accounting pronouncements.

Hydro One cautions the reader that the above list of factors is not exhaustive. Some of these and other factors are discussed in more detail in the section entitled "Risk Management and Risk Factors" in this MD&A.

In addition, Hydro One cautions the reader that information provided in this MD&A regarding the Company's outlook on certain matters, including potential future investments, is provided in order to give context to the nature of some of the Company's future plans and may not be appropriate for other purposes.

Additional information about Hydro One, including the Company's Annual Information Form, is available on SEDAR+ at www.sedarplus.com, the U.S. Securities and Exchange Commission's EDGAR website at www.sec.gov/edgar.shtml, and the Company's website at www.HydroOne.com/Investors.

Three months ended

September 30

Nine months ended September 30

(millions of Canadian dollars, except per share amounts) 2026

2025

2026

2025

Revenues

Distribution (includes related party revenues of $103 and $310 (2025 - $112 and $334) 1,742

1,605

5,331

4,800

Transmission (includes related party revenues of $726 and $2,046 (2025 - $671 and 732

680

2,063

1,938

Other 17

14

47

35

2,491

2,299

7,441

6,773

Costs

Purchased power (includes related party costs of $778 and $2,554 (2025 - $643 and

$2,032) for the three and nine months ended September 30, respectively) (Note 23)

1,204

1,080

3,699

3,199

Operation, maintenance and administration (Note 23)

325

296

985

948

Depreciation, amortization and asset removal costs (Note 4)

301

272

854

824

1,830

1,648

5,538

4,971

Income before financing charges, equity income (loss) and income tax expense

661

651

1,903

1,802

Financing charges (Note 5)

188

172

545

504

Equity income (loss) (Note 12)

4

6

(3)

6

Income before income tax expense

477

485

1,355

1,304

Income tax expense (Note 6)

60

60

170

189

Net income

417

425

1,185

1,115

Other comprehensive (loss) income

(7)

1

(13)

2

Comprehensive income

410

426

1,172

1,117

Net income attributable to:

Noncontrolling interest

4

4

11

9

Common shareholders

413

421

1,174

1,106

417

425

1,185

1,115

Comprehensive income attributable to:

Noncontrolling interest

4

4

11

9

Common shareholders

406

422

1,161

1,108

410

426

1,172

1,117

Earnings per common share (Note 20)

Basic

$0.69

$0.70

$1.96

$1.84

Diluted

$0.68

$0.70

$1.95

$1.84

Dividends per common share declared (Note 19)

$0.35

$0.33

$1.04

$0.98

See accompanying notes to Condensed Interim Consolidated Financial Statements (unaudited).

for the three and nine months ended September 30, respectively) (Note 23)

$1,906) for the three and nine months ended September 30, respectively) (Note 23)

As at (millions of Canadian dollars)

September 30,

2026

December 31,

2025

Assets

Current assets:

Cash and cash equivalents

159

549

Accounts receivable (Note 7)

1,170

1,083

Due from related parties

401

409

Other current assets (Note 8)

149

133

1,879

2,174

Property, plant and equipment (Note 9)

33,224

31,450

Other long-term assets:

Regulatory assets (Note 11)

4,217

3,857

Deferred income tax assets

148

135

Intangible assets (Note 10)

624

654

Goodwill

378

378

Other assets (Note 12)

1,159

1,023

6,526

6,047

Total assets

41,629

39,671

Liabilities

Current liabilities:

Short-term notes payable (Note 15)

199

100

Long-term debt payable within one year (Notes 15 & 16)

-

925

Accounts payable and other current liabilities (Note 13)

2,265

2,086

Due to related parties

245

479

2,709

3,590

Long-term liabilities:

Long-term debt (Notes 15 & 16)

19,508

18,092

Regulatory liabilities (Note 11)

2,046

1,621

Deferred income tax liabilities

2,155

1,799

Other long-term liabilities (Note 14)

1,895

1,823

25,604

23,335

Total liabilities

28,313

26,925

Contingencies and Commitments (Notes 25 & 26)

Subsequent Events (Note 28)

Noncontrolling interest subject to redemption

19

19

Equity

Common shares (Note 18)

5,728

5,721

Additional paid-in capital

24

25

Retained earnings

7,462

6,911

Accumulated other comprehensive loss

(22)

(9)

Hydro One shareholders' equity

13,192

12,648

Noncontrolling interest (Note 22)

105

79

Total equity

13,297

12,727

41,629

39,671

See accompanying notes to Condensed Interim Consolidated Financial Statements (unaudited).

Accumulated

Nine months ended September 30, 2026

(millions of Canadian dollars)

Common Shares

Additional Paid-in Capital

Retained Earnings

Other Comprehensive

Loss

Hydro One Shareholders'

Equity

Noncontrolling Interest

Total Equity

January 1, 2026

5,721

25

6,911

(9)

12,648

79

12,727

Net income

-

-

1,174

-

1,174

10

1,184

Other comprehensive loss

-

-

-

(13)

(13)

-

(13)

Distributions to noncontrolling interest

-

-

-

-

-

(8)

(8)

Contributions from sale of noncontrolling interest (Note 22)

-

-

-

-

-

24

24

Dividends on common shares (Note 19)

-

-

(623)

-

(623)

-

(623)

Common shares issued

7

(7)

-

-

-

-

-

Stock-based compensation

-

6

-

-

6

-

6

September 30, 2026

5,728

24

7,462

(22)

13,192

105

13,297

Additional

Accumulated

Other

Hydro One

Non-

Nine months ended September 30, 2025

(millions of Canadian dollars)

Common

Shares

Paid-in

Capital

Retained

Earnings

Comprehensive

Loss

Shareholders'

Equity

controlling

Interest

Total

Equity

January 1, 2025

5,713

28

6,360

(12)

12,089

65

12,154

Net income

-

-

1,106

-

1,106

7

1,113

Other comprehensive income (loss)

-

-

-

2

2

-

2

Distributions to noncontrolling interest

-

-

-

-

-

(8)

(8)

Contributions from sale of noncontrolling interest

-

-

-

-

-

16

16

Dividends on common shares (Note 19)

-

-

(588)

-

(588)

-

(588)

Common shares issued

8

(8)

-

-

-

-

-

Stock-based compensation

-

5

-

-

5

-

5

September 30, 2025

5,721

25

6,878

(10)

12,614

80

12,694

See accompanying notes to Condensed Interim Consolidated Financial Statements (unaudited).

Three

months ended September 30

Nine

months ended September 30

(millions of Canadian dollars)

2026

2025

2026

2025

Operating activities

Net income

417

425

1,185

1,115

Environmental expenditures

-

(1)

(1)

(2)

Adjustments for non-cash items:

Depreciation and amortization (Note 4)

258

244

755

709

Regulatory assets and liabilities

(21)

3

19

74

Deferred income tax expense

-

17

81

84

Other

12

(6)

44

9

Changes in non-cash balances related to operations (Note 24)

226

31

(111)

(161)

Net cash from operating activities

892

713

1,972

1,828

Financing activities

Long-term debt issued

-

1,099

1,373

1,099

Long-term debt repaid

(425)

-

(925)

(750)

Short-term notes issued

400

1,895

2,125

5,035

Short-term notes repaid

(300)

(2,335)

(2,025)

(4,300)

Dividends paid (Note 19)

(211)

(200)

(623)

(588)

Distributions paid to noncontrolling interest

(3)

(4)

(9)

(11)

Contributions received from sale of noncontrolling interest (Note 22)

-

8

24

16

Costs to obtain financing

-

(5)

(10)

(6)

Net cash (used in) from financing activities

(539)

458

(70)

495

Investing activities

Capital expenditures (Note 24)

Property, plant and equipment

(752)

(757)

(2,098)

(2,165)

Intangible assets

(13)

(26)

(41)

(55)

Additions to future use assets

(75)

(53)

(201)

(155)

Proceeds from sale of equity investments (Note 12)

-

-

30

-

Investment in equity investees (Note 12)

-

-

-

(261)

Capital contributions

-

(1)

-

3

Other

3

7

18

6

Net cash used in investing activities

(837)

(830)

(2,292)

(2,627)

Net change in cash and cash equivalents

(484)

341

(390)

(304)

Cash and cash equivalents, beginning of period

643

71

549

716

Cash and cash equivalents, end of period

159

412

159

412

See accompanying notes to Condensed Interim Consolidated Financial Statements (unaudited).

  1. DESCRIPTION OF THE BUSINESS

    Hydro One Limited (Hydro One or the Company) was incorporated on August 31, 2015, under the Business Corporations Act (Ontario). On October 31, 2015, the Company acquired Hydro One Inc., a company previously wholly-owned by the Province of Ontario (Province). As at September 30, 2026, the Province held approximately 47.1% (December 31, 2025 - 47.1%) of the common shares of Hydro One. The businesses of Hydro One are comprised of the following three segments:

    • The Transmission segment consists of owning and operating Hydro One's transmission system which transmits high voltage electricity across the province, interconnecting local distribution companies and certain large directly connected industrial customers throughout the Ontario electricity grid. The transmission business consists of the transmission system operated by Hydro One Inc.'s rate-regulated subsidiaries, Hydro One Networks Inc. (Hydro One Networks), Hydro One Sault Ste. Marie LP (HOSSM), an approximate 66% interest in B2M Limited Partnership (B2M LP), an approximate 55% interest in Niagara Reinforcement Limited Partnership (NRLP), and an approximate 50% (December 31, 2025 - 80%) interest in Chatham x Lakeshore Limited Partnership (CLLP). The Transmission segment also includes Hydro One Network's approximate 40% (December 31, 2025 - 48%) minority interest in the East-West Tie Limited Partnership (EWT LP).

    • The Distribution segment owns and operates Hydro One's distribution system which delivers electricity to end customers and certain other municipal electricity distributors within Ontario. The distribution business consists of the distribution systems operated by Hydro One Inc.'s rate-regulated subsidiaries, Hydro One Networks and Hydro One Remote Communities Inc. (Hydro One Remotes).

    • The Other segment consists principally of Hydro One's telecommunications business, which provides telecommunications support for the Company's transmission and distribution businesses, as well as certain corporate activities, and is not rate-regulated. The telecommunications business is carried out by Hydro One's wholly-owned subsidiary, Acronym Solutions Inc. (Acronym). In addition to supporting Hydro One's regulated business segments, Acronym offers a comprehensive suite of Information Communications Technology solutions. Furthermore, Hydro One's other segment also includes Aux Energy Inc., a wholly-owned subsidiary that provides energy solutions to commercial and industrial clients, and Ontario Charging Network LP (OCN LP), a wholly-owned subsidiary that owns and operates electric vehicle fast charging stations across Ontario under the Ivy Charging Network brand.

      Earnings for interim periods are impacted by seasonal weather conditions affecting customer demand, market pricing, and the timing of regulatory decisions.

  2. SIGNIFICANT ACCOUNTING POLICIES Basis of Consolidation and Presentation

    These unaudited condensed interim consolidated financial statements (Consolidated Financial Statements) include the accounts of the Company and its subsidiaries. Inter-company transactions and balances have been eliminated.

    Basis of Accounting

    These Consolidated Financial Statements are prepared and presented in accordance with United States (U.S.) generally accepted accounting principles (GAAP) for interim financial statements and all financial information is presented in Canadian dollars.

    The accounting policies applied are consistent with those outlined in Hydro One's annual audited consolidated financial statements for the year ended December 31, 2025, with the exception of the adoption of new accounting standards as described in Note 3 - New Accounting Pronouncements. These Consolidated Financial Statements reflect adjustments, that are, in the opinion of management, necessary to fairly reflect the financial position and results of operations for the respective periods. These Consolidated Financial Statements do not include all disclosures required in the annual financial statements and should be read in conjunction with Hydro One's annual audited consolidated financial statements for the year ended December 31, 2025.

  3. NEW ACCOUNTING PRONOUNCEMENTS

    The following table presents Accounting Standards Updates (ASUs) issued by the Financial Accounting Standards Board (FASB) that are applicable to Hydro One:

    Recently Adopted Accounting Guidance

    Guidance

    Date issued

    Description

    ASU Effective Date

    Impact on Hydro One

    ASU

    July 2025

    The amendments allow all entities to use a practical

    Annual and interim

    No impact upon

    2025-05

    expedient when estimating expected credit losses for

    periods beginning after

    adoption

    current accounts receivable and contract assets under

    December 15, 2025.

    Topic 606, by assuming that current conditions as of the

    balance sheet date remain unchanged over the asset's

    life. Additionally, entities other than public business

    entities that elect this expedient may adopt an accounting

    policy to consider post-balance sheet date collection

    activity in their credit loss estimates.

    Recently Issued Accounting Guidance Not Yet Adopted

    Guidance Date issued Description ASU Effective Date

    Anticipated Impact on Hydro One

    ASU 2023-06

    ASU 2024-03

    October 2023

    November 2024

    The amendments represent changes to clarify or improve disclosure or presentation requirements of a variety of subtopics in the FASB Codification. Many of the amendments allow users to more easily compare entities subject to the U.S. Securities and Exchange's (SEC) existing disclosures with those entities that were not previously subject to the SEC's requirements. Also, the amendments align the requirements in the Codification with the SEC's regulations.

    Applicable to all entities, if by June 30, 2027 the SEC has not removed the applicable requirement from Regulation S-X or Regulation S-K, the pending content of the related amendment will be removed from the Codification and will not become effective for any entity.

    The amendments require public business entities to disclose additional information about specific expense categories in the notes to financial statements at interim and annual reporting periods, which are not generally presented in the current financial statements.

    Two years subsequent to the date on which the SEC's removal of that related disclosure becomes effective.

    Annual periods beginning after December 15, 2026, and interim periods beginning after December 15, 2027.

    Under assessment

    Under assessment

    ASU 2025-03

    May 2025 The amendments require entities to apply the guidance for identifying the accounting acquirer in transactions where a business that qualifies as a Variable Interest Entity is acquired through the exchange of equity interests.

    Annual and interim periods beginning after December 15, 2026.

    No expected impact upon adoption

    ASU 2025-06

    ASU 2025-09

    ASU 2025-10

    September 2025

    November 2025

    December 2025

    The amendments modernize accounting for internal-use software by removing outdated development stage references and introducing a capitalization threshold based on management authorization and project completion probability.

    The amendments expand hedge-accounting eligibility and better align the guidance with common risk-management practices. Key updates allow grouping forecasted transactions with similar exposure, simplify hedging of choose-your-rate variable-rate debt, and broaden eligibility for hedging nonfinancial components. The guidance modernizes treatment of certain option-based derivatives and resolves mismatches in dual hedge relationships.

    The amendments establish authoritative GAAP for government grants, setting recognition, measurement, presentation, and disclosure requirements.

    Annual and interim periods beginning after December 15, 2027.

    Annual and interim periods beginning after December 15, 2026.

    Annual and interim periods beginning after December 15, 2028.

    Under assessment

    No expected impact upon adoption

    Under assessment

    Guidance

    Date issued

    Description

    ASU Effective Date

    Anticipated Impact on Hydro One

    ASU

    December

    The amendments clarify interim reporting by establishing

    Interim reporting periods

    Under assessment

    2025-11

    2025

    a complete list of required GAAP interim disclosures.

    within annual reporting

    They introduce a disclosure principle requiring entities to

    periods beginning after

    report material events occurring after the annual

    December 15, 2027.

    reporting period. The Update also clarifies types of

    interim reports and the form and content of interim

    financial statements. Overall, the changes enhance

    clarity and consistency without altering existing

    disclosure requirements.

    ASU

    December

    The amendments clarify existing guidance, correct

    Annual and interim

    No expected impact

    2025-12

    2025

    errors, and introduce minor improvements to numerous

    periods beginning after

    upon adoption

    Codification Topics, thereby making the requirements

    December 15, 2026.

    easier for entities to understand and apply.

    ASU

    May 2026

    The amendments establish authoritative guidance on the

    Annual and interim

    Under assessment

    2026-02

    accounting and disclosure of environmental credits and

    periods beginning after

    environmental credit obligations. The guidance

    December 15, 2027.

    establishes a consistent framework for recognizing,

    measuring, presenting, and disclosing environmental

    credits and related compliance obligations arising from

    regulatory compliance programs. Overall, the changes

    improve comparability, transparency, and consistency in

    financial reporting.

  4. DEPRECIATION, AMORTIZATION AND ASSET REMOVAL COSTS

    Three months ended

    September 30

    Nine months ended September 30

    (millions of dollars)

    2026

    2025

    2026

    2025

    Depreciation of property, plant and equipment

    235

    220

    685

    641

    Amortization of intangible assets

    23

    23

    69

    66

    Amortization of regulatory assets

    -

    1

    1

    2

    Depreciation and amortization

    258

    244

    755

    709

    Asset removal costs

    43

    28

    99

    115

    301

    272

    854

    824

  5. FINANCING CHARGES

    Three

    months ended September 30

    Nine

    months ended September 30

    (millions of dollars)

    2026

    2025

    2026

    2025

    Interest on long-term debt

    212

    184

    611

    543

    Interest on regulatory accounts

    6

    6

    16

    19

    Interest on short-term notes

    1

    9

    6

    18

    Realized loss on cash flow hedges (Note 16)

    2

    1

    5

    3

    Other

    6

    6

    13

    14

    Less: Interest capitalized on construction and development in progress

    (34)

    (30)

    (94)

    (81)

    Interest earned on cash and cash equivalents (5)

    (4)

    (12)

    (12)

    188

    172

    545

    504

  6. INCOME TAXES

    As a rate-regulated utility company, the Company recovers income taxes from its ratepayers based on estimated current income tax expense in respect of its regulated business. The amounts of deferred income taxes related to regulated operations which are considered to be more likely-than-not to be recoverable from, or refundable to, ratepayers in future periods are recognized as deferred income tax regulatory assets or deferred income tax regulatory liabilities, with an offset to deferred income tax recovery or deferred income tax expense, respectively. The Company's consolidated income tax expense or income tax recovery for the period includes all current and deferred income tax expenses for the period net of the regulated accounting offset to deferred income tax expense arising from temporary differences to be recovered from, or refunded to, customers in future rates. Thus, the Company's income tax expense or income tax recovery differs from the amount that would have been recorded using the statutory income tax rate. As the Company operates in Ontario, it is subject to the combined Canadian federal and Ontario statutory rates of 26.5%.

    The reconciliation between the statutory and the effective tax rates is provided as follows:

    2026 2025

    Three months ended September 30 (millions of dollars) (percentage) (millions of dollars) (percentage)

    Income before income tax expense 477

    485

    Income tax expense at statutory rate of 26.5% (2025 - 26.5%) 126

    26.5 %

    129

    26.5 %

    Increase (decrease) resulting from:

    Net temporary differences recoverable in future rates charged to customers: Capital cost allowance in excess of depreciation and amortization1

    (34)

    (7.2)%

    (30)

    (6.2)%

    Overheads capitalized for accounting but deducted for tax purposes

    (21)

    (4.4)%

    (22)

    (4.5)%

    Interest capitalized for accounting but deducted for tax purposes

    (9)

    (1.9)%

    (9)

    (1.9)%

    Pension and post-retirement benefit contributions in excess of pension expense

    (2)

    (0.4)%

    1

    0.2 %

    Environmental expenditures

    -

    - %

    (1)

    (0.2)%

    Non refundable tax credit

    -

    - %

    (3)

    (0.6)%

    Other

    1

    0.2 %

    (5)

    (0.9)%

    Net temporary differences attributable to regulated business

    (65)

    (13.7)%

    (69)

    (14.1)%

    Net permanent differences

    (1)

    (0.2)%

    -

    - %

    Total income tax expense

    60

    12.6 %

    60

    12.4 %

    1 Included in current period's amount is the accelerated tax depreciation of up to three times the first-year rate for certain eligible capital investments acquired after 2024 and placed in-service before 2034, as re-introduced under Bill C-15, enacted in the first quarter of 2026.

    2026 2025

    Nine months ended September 30 (millions of dollars) (percentage) (millions of dollars) (percentage)

    Income before income tax expense

    1,355

    1,304

    Income tax expense at statutory rate of 26.5% (2025 - 26.5%)

    359

    26.5 %

    346

    26.5 %

    Increase (decrease) resulting from:

    Net temporary differences recoverable in future rates charged to customers: Capital cost allowance in excess of depreciation and amortization1

    (110)

    (8.1)%

    (74)

    (5.6)%

    Overheads capitalized for accounting but deducted for tax purposes

    (47)

    (3.5)%

    (46)

    (3.5)%

    Interest capitalized for accounting but deducted for tax purposes

    (28)

    (2.1)%

    (26)

    (2.0)%

    Pension and post-retirement benefit contributions in excess of pension expense

    (8)

    (0.6)%

    (2)

    (0.2)%

    Environmental expenditures

    -

    - %

    (1)

    (0.1)%

    Non refundable tax credit

    -

    - %

    (3)

    (0.2)%

    Other

    4

    0.3 %

    (6)

    (0.5)%

    Net temporary differences attributable to regulated business

    (189)

    (14.0)%

    (158)

    (12.1)%

    Net permanent differences

    -

    - %

    1

    0.1 %

    Total income tax expense

    170

    12.5 %

    189

    14.5 %

    1 Included in current period's amount is the accelerated tax depreciation of up to three times the first-year rate for certain eligible capital investments acquired after 2024 and placed in-service before 2034, as re-introduced under Bill C-15, enacted in the first quarter of 2026.

  7. ACCOUNTS RECEIVABLE

September 30, December 31,

As at (millions of dollars)

2026

2025

Accounts receivable - billed

519

467

Accounts receivable - unbilled

709

673

Accounts receivable, gross

1,228

1,140

Allowance for doubtful accounts

(58)

(57)

Accounts receivable, net

1,170

1,083

The following table shows the movements in the allowance for doubtful accounts for the nine months ended September 30, 2026 and the year ended December 31, 2025:

September 30, December 31,

As at (millions of dollars)

2026

2025

Allowance for doubtful accounts - beginning

(57)

(61)

Write-offs

10

23

Additions to allowance for doubtful accounts

(11)

(19)

Allowance for doubtful accounts - ending

(58)

(57)

8. OTHER CURRENT ASSETS

September 30, December 31,

As at (millions of dollars)

2026

2025

Prepaid expenses and other assets

102

92

Materials and supplies

31

31

Regulatory assets (Note 11)

16

10

149

133

9. PROPERTY, PLANT AND EQUIPMENT

September 30, December 31,

As at (millions of dollars)

2026

2025

Property, plant and equipment

45,393

43,894

Less: accumulated depreciation

(15,550)

(15,042)

29,843

28,852

Construction in progress

3,381

2,598

33,224

31,450

10. INTANGIBLE ASSETS

As at (millions of dollars)

September 30,

2026

December 31,

2025

Intangible assets

1,603

1,590

Less: accumulated depreciation

(1,034)

(965)

569

625

Development in progress

55

29

624

654

11. REGULATORY ASSETS AND LIABILITIES

Regulatory assets and liabilities arise as a result of the rate-setting process. Hydro One has recorded the following regulatory assets and liabilities:

September 30,

December 31,

As at (millions of dollars)

2026

2025

Regulatory assets:

Deferred income tax regulatory asset

3,814

3,549

Broadband deferral

130

73

Post-retirement and post-employment benefits - non-service cost

50

49

Incremental cloud computing implementation costs deferral

49

20

Getting Ontario Connected Act variance

46

39

Environmental

41

43

Distribution rate riders

31

26

Stock-based compensation

13

18

Other

59

50

Total regulatory assets

4,233

3,867

Less: current portion

(16)

(10)

4,217

3,857

Regulatory liabilities:

Pension benefit regulatory liability

715

610

Retail settlement variance (RSVA)

343

242

Post-retirement and post-employment benefits

336

336

Earnings sharing mechanism (ESM) deferral

193

310

External revenue variance

91

75

Tax rule changes variance

84

36

Capitalized overhead tax variance

62

50

Other post-employment benefits (OPEB) asymmetrical carrying charge variance

61

49

Pension cost differential variance

47

30

Asset removal costs cumulative variance

44

48

Advanced Metering Infrastructure (AMI) 2.0 variance

36

29

Distribution rate riders (2026)

21

-

Deferred income tax regulatory liability

14

9

Other

37

27

Total regulatory liabilities

2,084

1,851

Less: current portion

(38)

(230)

2,046

1,621

Tax Rule Changes Variance

In the first quarter of 2026, federal budget measures enacted as part of Bill C - 15 included time-limited investment incentives permitting Hydro One to claim enhanced capital cost allowance of up to three times the first-year rate for eligible capital investments acquired after 2024 and placed in-service before 2034. Hydro One is required to refund the tax benefits related to the accelerated depreciation rules to ratepayers.

Distribution Rate Riders (2026)

As part of the Ontario Energy Board's (OEB's) Decision and Order on Hydro One Networks' distribution rates for 2026, the OEB approved the disposition of certain deferral and variance account balances as at December 31, 2024, including accrued interest, on both a final and interim basis. The amounts are being returned to customers over a one-year period ending on December 31, 2026.

Hydro One Limited on 6ix