Highly Encouraging Metallurgy Results from Inhambane
Filed with ASX · · 7 pages · English
i Metallurgy results have been received with test work confirming that the Inhambane mineral sands can be processed readily using typical mineral sands processing methodologies and equipment i The following key products were produced: o Primary Ilmenite containing 49.8% TiO2, 0.6% SiO2, 0.4% Al2O3 and <0.1% Cr2O3 o Zircon containing 66% ZrO2 + HfO2, < 0.1% TiO2 and < 500ppm U + Th o High Titanium
In the deck
Story so far
Earlier from Heavy Minerals
- Port Gregory Maiden JORC Mineral Resource Exceeds Target
- Pause in Trading
- Port Gregory Scoping Study And PEA Awarded
- Significant Garnet Mineralisation Discovery at Red Hill
- Quarterly Activities & Cashflow Reports
Later from Heavy Minerals
- Favourable Metallurgy Results Received for Port Gregory
- Scoping Study - Port Gregory Garnet Project
- Director Resignation
- Drilling at Port Gregory & Red Hill to Commence in November
- Drilling Completed at Port Gregory
Follow Heavy Minerals into a list and get an email when it puts out news.
Follow Heavy Minerals