Gaztransport & Technigaz SAEURONEXT: GTT

GTT Gaztransport: Energy receives an order from Hanwha Ocean for the tank design of two new LNG Carriers

· Issued by Gaztransport & Technigaz SA

Summary by 6ix AI

GTT Energy, the GTT group's business unit for containment and energy management systems, received an order in the third quarter of 2026 from the Hanwha Ocean shipyard. The order is to design cryogenic (very low temperature) tanks for two new liquefied natural gas (LNG) carriers.

Key details

  • Each vessel will have a total capacity of 174,000 m³.
  • The tanks will use the NO96 Super+ membrane containment system, a technology developed by GTT.

What’s still pending

  • Delivery of the vessels is scheduled by the fourth quarter of 2029.

6ix AI wrote this summary from the release below and checked it against the release.

Paris, 14 October 2026 - GTT Energy, the Group's business unit dedicated to containment and energy management systems, announces that it has received, in the third quarter of 2026, an order from the Hanwha Ocean shipyard for the design of cryogenic tanks for two new liquefied natural gas carriers.

Each vessel will have a total capacity of 174,000 m³. The tanks will be fitted with the NO96 Super+ membrane containment system, a technology developed by GTT.

Delivery of the vessels is scheduled by the fourth quarter of 2029.

Media contact:
communication@gtt.fr / +33 (0)1 30 23 56 37

Investor relations contact:
information-financiere@gtt.fr / +33 (0)1 30 23 20 87 / +33 (0)1 30 23 42 64

Gaztransport & Technigaz SA on 6ix

Story so far

Earlier from Gaztransport & Technigaz

All Gaztransport & Technigaz news releases