Goldstream Commences Summer Exploration at Hardrock East
Toronto, Ontario CANADA, July 16, 2013 /FSC/ - Goldstream Minerals Inc. (GSX - TSX Venture), ("Goldstream" or "Goldstream Minerals") is pleased to announce that it has commenced its summer exploration program on the Hard Rock East Gold Project. The recently completed winter exploration program saw three new exploration grids cut for a total of 61.3 line-km with the completion of a detailed ground IP and magnetic survey. The new geophysical survey highlights coincident IP and magnetic high anomalies and at least one distinct iron formation unit that has been delineated for a minimum strike length of 1.5 km. Goldstream has received the necessary exploration work plan and permits for its summer exploration program from the Ministry of Northern Development and Mines (MNDM).
The lithologic units of the Southern Meta-sedimentary Belt (SMB), which host the major gold deposits in the Geraldton Gold Camp, have been delineated in detail and dominate the eastern half of the Hard Rock East property. A Soil Gas Hydrocarbon (SGH) sampling program has been designed to cover the new anomaly as well as the easterly extension of the Klotz Lake shear zone that hosts gold mineralization on the Milestone claim block previously drill tested by Kodiak Exploration Lld. in 2010. This soil survey will cover the strike extension of this structure for an additional 6.4 km along the KLMS exploration grid. SGH will also be used to explore for concentrated gold mineralization over the Grid 2 iron formation and Lucky gold showing on the Pagwachuan Lake claim blocks. Further exploration work is also underway at Titan to delineate the structure that host gold-bearing quartz veins within surface outcrop which was previously trenched.
Richard Kilpatrick, President and CEO of Goldstream commented "The winter geophysics program identified a new 1.5 km structure on the SMB that is the focus of the summer geologic and soil sampling program. I anticipate that once the soil results are received and evaluated, numerous coincident geophysical and soil anomalies will be revealed, thereby identifying high priority drill targets for the fall drill program."
About Goldstream:
Goldstream Minerals Inc. is a gold exploration and development company with its material property being the Hardrock East Gold Project located in the Beardmore-Geraldton gold camp of northern Ontario. The Hardrock East Property consists of over 350 square kilometres in the eastern portion of the Beardmore-Geraldton gold camp and is comprised of four different properties: Milestone, Adel, Pagwachuan Lake and Klotz Lake (Solarus).
The geological information reported has been reviewed and approved by Paul Dunbar P.Geo, VP Exploration, who is a qualified person under the definitions established by National Instrument 43-101
ON BEHALF OF THE BOARD OF DIRECTORS
GOLDSTREAM MINERALS INC.
"Richard Kilpatrick"
Richard Kilpatrick
President and CEO
For further information, please contact Richard Kilpatrick, President and CEO at (416) 775-8774.
GOLDSTREAM MINERALS INC.
155 University Ave., Suite 1920
Toronto, ON M5H 3B7
Telephone: (416) 775-8774
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) has in any way passed upon the merits of the Transaction or approved or disapproved the contents of this press release. The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.
Cautionary Statement Regarding Forward-Looking Information
This press release contains "forward-looking information" within the meaning of applicable Canadian legislation, concerning the business, operations and financial performance and condition of the Company. Forward-looking information includes, but is not limited to statements with respect to the anticipated developments in operations in future periods; planned exploration and development activities; the adequacy of financial resources; the interpretation of drill results; and the success of exploration activities. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled estimates", "forecasts", "intends", "anticipates", "does not anticipate", or "believes", or variations of such words and phrases or statement that certain actions, events or results "may", "could", "would", "might", "will" or "will be taken", "occur", or "be achieved". Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made, and they are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: unexpected events during exploration and operation; delay or failure to receive board or government approvals; timing and availability of external financing on acceptable terms; conclusions of economic evaluations; changes in project parametres as plans continue to be refined; future prices of commodities; possible variations in resource, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; acts of terrorism; accidents, labour disputes and other risks of the mining industry; delays in the completion of development or construction activities, as well as those factors discussed herein. Although management has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking statements that are incorporated herein, except in accordance with applicable securities laws.
To view this press release as a PDF, please click on the following link:
http://www.usetdas.com/pr/goldstream07162013.pdf
Source: Goldstream Minerals Inc. (TSX-V: GSX)
Maximum News Dissemination by FSCwire. http://www.fscwire.com
Toronto, Ontario CANADA, July 16, 2013 /FSC/ - Goldstream Minerals Inc. (GSX - TSX Venture), ("Goldstream" or "Goldstream Minerals") is pleased to announce that it has commenced its summer exploration program on the Hard Rock East Gold Project. The recently completed winter exploration program saw three new exploration grids cut for a total of 61.3 line-km with the completion of a detailed ground IP and magnetic survey. The new geophysical survey highlights coincident IP and magnetic high anomalies and at least one distinct iron formation unit that has been delineated for a minimum strike length of 1.5 km. Goldstream has received the necessary exploration work plan and permits for its summer exploration program from the Ministry of Northern Development and Mines (MNDM).
The lithologic units of the Southern Meta-sedimentary Belt (SMB), which host the major gold deposits in the Geraldton Gold Camp, have been delineated in detail and dominate the eastern half of the Hard Rock East property. A Soil Gas Hydrocarbon (SGH) sampling program has been designed to cover the new anomaly as well as the easterly extension of the Klotz Lake shear zone that hosts gold mineralization on the Milestone claim block previously drill tested by Kodiak Exploration Lld. in 2010. This soil survey will cover the strike extension of this structure for an additional 6.4 km along the KLMS exploration grid. SGH will also be used to explore for concentrated gold mineralization over the Grid 2 iron formation and Lucky gold showing on the Pagwachuan Lake claim blocks. Further exploration work is also underway at Titan to delineate the structure that host gold-bearing quartz veins within surface outcrop which was previously trenched.
Richard Kilpatrick, President and CEO of Goldstream commented "The winter geophysics program identified a new 1.5 km structure on the SMB that is the focus of the summer geologic and soil sampling program. I anticipate that once the soil results are received and evaluated, numerous coincident geophysical and soil anomalies will be revealed, thereby identifying high priority drill targets for the fall drill program."
About Goldstream:
Goldstream Minerals Inc. is a gold exploration and development company with its material property being the Hardrock East Gold Project located in the Beardmore-Geraldton gold camp of northern Ontario. The Hardrock East Property consists of over 350 square kilometres in the eastern portion of the Beardmore-Geraldton gold camp and is comprised of four different properties: Milestone, Adel, Pagwachuan Lake and Klotz Lake (Solarus).
The geological information reported has been reviewed and approved by Paul Dunbar P.Geo, VP Exploration, who is a qualified person under the definitions established by National Instrument 43-101
ON BEHALF OF THE BOARD OF DIRECTORS
GOLDSTREAM MINERALS INC.
"Richard Kilpatrick"
Richard Kilpatrick
President and CEO
For further information, please contact Richard Kilpatrick, President and CEO at (416) 775-8774.
GOLDSTREAM MINERALS INC.
155 University Ave., Suite 1920
Toronto, ON M5H 3B7
Telephone: (416) 775-8774
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) has in any way passed upon the merits of the Transaction or approved or disapproved the contents of this press release. The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.
Cautionary Statement Regarding Forward-Looking Information
This press release contains "forward-looking information" within the meaning of applicable Canadian legislation, concerning the business, operations and financial performance and condition of the Company. Forward-looking information includes, but is not limited to statements with respect to the anticipated developments in operations in future periods; planned exploration and development activities; the adequacy of financial resources; the interpretation of drill results; and the success of exploration activities. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled estimates", "forecasts", "intends", "anticipates", "does not anticipate", or "believes", or variations of such words and phrases or statement that certain actions, events or results "may", "could", "would", "might", "will" or "will be taken", "occur", or "be achieved". Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made, and they are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: unexpected events during exploration and operation; delay or failure to receive board or government approvals; timing and availability of external financing on acceptable terms; conclusions of economic evaluations; changes in project parametres as plans continue to be refined; future prices of commodities; possible variations in resource, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; acts of terrorism; accidents, labour disputes and other risks of the mining industry; delays in the completion of development or construction activities, as well as those factors discussed herein. Although management has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking statements that are incorporated herein, except in accordance with applicable securities laws.
To view this press release as a PDF, please click on the following link:
http://www.usetdas.com/pr/goldstream07162013.pdf
Source: Goldstream Minerals Inc. (TSX-V: GSX)
Maximum News Dissemination by FSCwire. http://www.fscwire.com