Business

Generation Uranium Starts Summer 2026 Field Program at the Yath Project, Kivalliq Region, Nunavut. Project,

(TheNewswire) Vancouver, British Columbia – July 2, 2026 – Generation Uranium I...

articleGeneration Uranium Inc Class AJuly 2, 20265/news/generation-uranium-starts-summer-2026-field-program-at-the-yath-project-kivalliq-region-nunavut-project
Generation Uranium Starts Summer 2026 Field Program at the Yath Project, Kivalliq Region, Nunavut. Project,

About this update from Generation Uranium Inc Class A

Generation Uranium Starts Summer 2026 Field Program at the Yath Project, Kivalliq Region, Nunavut. Project, (TheNewswire) Vancouver, British Columbia – July 2, 2026 – Generation Uranium Inc. (TSX.V: GEN, OTCQB: GENRF, FRA: W85) (“Generation” or the “Company”) is pleased to announce the start of it's inaugural field program for the Yath Project, Kivalliq Region, Nunavut. The Company has assembled a team with strong skills in geophysics, structural geology and prospecting. The focus of this initial program will be to define discrete drill targets at historic showing, ground truth and define drill targets from new anomalies defined from the Expert Geophysics MMT survey, and finally deliver a ranked drill target program for execution on receipt of our drill permit. With the initial database compilation of historical and 2024 MMT data, the company is now focused on drill targeting through:   The ground integration of the MMT conductors into the 17 original targets.  The ground checking new targets defined by the MMT survey, and  Reviewing conductors that are on trend with Atha Energy's LAC 50 historic deposit.  CEO Michael Collins comments, "I joined Generation 8 months ago in November 2025 because I believe Yath has exceptional discovery potential. 2026 is where it is all starting to come together with the final MMT survey being complete, and target selection in anticipation of drilling. I envyie our Geology team’s opportunity to be a part of this project at such a pivotal moment but I also think they have a tough job sifting through so many great targets" With over 17 km32 of ground in the Angikuni Basin, the Yath Project is surrounded, north and south by Atha Energy's Angilak Project* where they have 3 drills running, following up on their 2025 program where they made 5 new discoveries. * Mineralization hosted on an adjacent property is not necessarily indicative of mineralization hosted on Generation’s property. Key targets for Generation's 2026 targeting program include: VGR Trend The VGR Trend extends for approximately five kilometres along a major fault structure that is characterized by elevated radioactivity and extensive clay–silica alteration.  Grab sample grades reaching up to 3.75% U₃O₈. Four RC drill holes tested the main VGR showing, returning e...

View stock analysis, news, and events for Generation Uranium Inc Class A