Business
Fury Reports 7.86 g/t Gold Over 9.43 Metres in Infill Drilling at the Eau Claire Gold Project, Quebec
TORONTO, June 02, 2026 (GLOBE NEWSWIRE) -- Fury Gold Mines Limited (TSX and NYSE American: FURY) (“Fury” or the “Company”) is pleased to announce the final batch of assay results from its Phase 1, 13,000-metre (“m”) drill program, as well as the initial assay results from its ongoing Phase 2, 15,000–25,000-metre drill program at the Eau Claire gold project (“Eau Claire” or the “Project”), located in the Eeyou Istchee Territory in the James Bay Region of Northern Quebec. Phase 1 drilling focused
About this update from Fury Gold Mines Limited
TORONTO, June 02, 2026 (GLOBE NEWSWIRE) -- Fury Gold Mines Limited (TSX and NYSE American: FURY) (“Fury” or the “Company”) is pleased to announce the final batch of assay results from its Phase 1, 13,000-metre (“m”) drill program, as well as the initial assay results from its ongoing Phase 2, 15,000–25,000-metre drill program at the Eau Claire gold project (“Eau Claire” or the “Project”), located in the Eeyou Istchee Territory in the James Bay Region of Northern Quebec. Phase 1 drilling focused on expanding mineral resources along high-grade shoots and improving continuity within the existing resource, particularly outside the stopes identified in the preliminary economic assessment (PEA). A total of 21 drill holes, comprising of 12,700m, were completed, and all assay results have now been received. The last two holes of the Phase 1 program (26EC-102 and 26EC-103), which totals 1,330m, are discussed below in Table 1 and Figure 1. Phase 2 drilling is currently ongoing and aimed at converting inferred mineral resources into higher-confidence categories and expanding the indicated mineral resource. To date, 14 drill holes totalling approximately 7,100m have been completed, with assay results currently available for 720m (holes 26EC-107 and 26EC-109), which are also highlighted in Table 1 and Figure 1 below. Table 1: Recent Drill Highlights “Drilling at Eau Claire continues to reinforce resource continuity, confirming mineralization remains well developed and predictable within the deposit,” stated Tim Clark, CEO of Fury Gold Mines. “We look forward to further de-risking the project with additional drilling being carried out to convert resources into higher confidence categories and expanding the Eau Claire mineralization which should unlock additional value for shareholders.” Figure 1: Long section of the Eau Claire Deposit looking north showing the locations of the completed and current drill holes in relation to the block model. The most significant result from this batch of drilling is returned from expansion drill hole 26EC 103, which tested approximately 45m down plunge of a historic intercept within the inferred portion of the Eau Claire mineral resource. The hole intersected 7.86 g/t gold over 9.43m (Figure 2), confirming the continuity of mineralization within the modelled zone. In addition, drill hole 26EC 102, which also targeted mineralizatio...
View stock analysis, news, and events for Fury Gold Mines Limited