Liontown LimitedASX: LTR

Further thick lithium intercepts from drilling at Buldania

· Issued by Liontown Limited

Filed with ASX · · 21 pages · English

o 13m @ 2.1% Li2O from 21m 42m @ 1.0% Li2O from 155m (BDRC0106), including: (See ASX releases dated 26th March 2018, 19th September 2018, 1st November 2018, 20th November 2018 and 22nd July 2019) • Latest assays confirm down-dip extensions of previous mineralised intersections, with further drilling planned to the south-east to test strike continuity. • Mineralised system defined over >1.4km and r

Liontown Limited on 6ix

Story so far

Earlier from Liontown

Later from Liontown

All Liontown news releases