Further Significant Gold Intercepts In TGO Gold Corridor
Filed with ASX · · 15 pages · English and French
Summary by 6ix AI
Alkane Resources Ltd reports significant gold intercepts from drilling in the Tomingley Gold Corridor, confirming a continuous strike length of mineralization between the Roswell and San Antonio prospects. The exploration program has revealed broad, high-grade results, indicating potential for extending the mine life of the Tomingley Gold Operations. A resource definition drilling program of substantial length is set to commence, aimed at further confirming these findings and enhancing resource estimates.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Watch Alkane Resources' latest callAlkane Resources (ASX:ALK) Q4 2026 Earnings Call · Replay · Jul 20Read the transcript of Alkane Resources (ASX:ALK) Q4 2026 Earnings CallStory so far
Earlier from Alkane Resources
- Response to ASX Aware Query
- Investment in Clean Metal Processing Technology
- Tomingley Gold Production Update and Revised FY 19 Guidance
- Third Near-Mine Discovery Confirms 2.5km TGO Gold Corridor
- Significant Au Intercepts Confirm Potential Tomingley ext.
Later from Alkane Resources
- Significant Exploration Target Defined At Tomingley
- Gold Mineralisation Drilling at Peak Hill
- Strategic Investment in Genesis Minerals
- Discovers Significant Porphyry Au Cu Mineralisation at Boda
- Resource and Reserve Statements FY19
Follow Alkane Resources into a list and get an email when it puts out news.
Follow Alkane Resources