Further drilling planned at Killaloe
Filed with ASX · · 17 pages · English
• Assay results received from recent follow-up Reverse Circulation (RC) drilling at the Killaloe Gold Project, located in the Norseman region of Western Australia. • At Duke Main, drilling has confirmed the down-dip extension of a continuous and broad gold system, with results including: -13m @ 0.52g/t Au from 25m (KRC026) -19m @ 0.24g/t Au from 41m (KRC027) • Drilling has only tested the top 50 m
In the deck
Story so far
Earlier from Lachlan Star
- Quarterly Activities/Appendix 5B Cash Flow Report
- $2.16m Capital raising to accelerate drill testing
- New phase of drilling planned at the Killaloe Gold Project
- High-grade gold intersected at Killaloe project
- Drilling commenced at North Cobar coppergold Project, Lachlan Fold Belt, nsw
Later from Lachlan Star
- Monthly Activities/Appendix 5B Cash Flow Report
- Lachlan Star Acquires High Grade New Waverley Gold Project
- High-Grade Gold Results Confirm New Waverley Potential
- Visible Gold and More High-Grade Results at New Waverley
- Visible Gold at New Waverley - additional disclosure
Follow Lachlan Star into a list and get an email when it puts out news.
Follow Lachlan Star