Formentera Lithium Drilling Update
Filed with ASX · · 12 pages · English
• Drilling at Formentera concession well JAM 26-06 has reached 488m depth and has intersected bedrock. The end of the hole (EOH) has been called. • Encouraging porous sands that may contain lithium brines, have been observed from 80-200m and 340-400m. • Eight out of nine packer tests have been successful pumped to provide assay samples. Infield measurements of specific gravity of the brine have re
Patagonia Lithium Limited on 6ix
Story so far
Earlier from Patagonia Lithium
- Successful Placement to Fund Formentera Project
- Trading Halt
- Quarterly Activities and Cashflow Report 31 December 2025
- Formentera Lithium Drilling Reaches 335 metres
- Quarterly Activities and Cashflow Report 30 September 2025
Later from Patagonia Lithium
- Formentera Lithium Drilling Assay Update
- Formentera Strong Flow Pump Test Results
- Formentera Lithium Well 5 Porosity Results
- Outstanding Porosity Results from Formentera Lithium Well 6
- Quarterly Activities and Cashflow Report 31 March 2026
Follow Patagonia Lithium into a list and get an email when it puts out news.
Follow Patagonia Lithium