Feasibility Study - Bowdens Silver Project
Filed with ASX · · 32 pages · English
• Feasibility Study completed for a two million tonne per annum open-pit mining and conventional processing operation. • Low strip ratio of 1.6:1. • Production of 52.9 million ounces of silver plus 108.0 kilotonnes of zinc and 79.26 kilotonnes lead. • Life of Mine (LOM) 16 years. • Operating margin of A$558.70 million with project payback of 4.8 years. • Initial three years of operations to produc
Story so far
Earlier from Silver Mines
- Maiden Ore Reserve - Bowdens Silver Project
- Drilling Commences on High Impact Bowdens Targets
- Cleansing Prospectus
- Share Placement
- Voluntary Suspension
Later from Silver Mines
- Drill results extend high grade Northwest mineralised zone
- Geophysics Produces Multiple Targets at Barabolar Project
- $3.85 Million rights issue to fund exploration at Barabolar
- Entitlements Issue Prospectus
- Geophysics Reveal Exceptional Drill Targets at Barabolar
Follow Silver Mines into a list and get an email when it puts out news.
Follow Silver Mines