Talisman Mining LimitedASX: TLM

Exploration Update, NSW Lachlan Gold & Base Metal Project

· Issued by Talisman Mining Limited

Filed with ASX · · 14 pages · English

Drilling completed at three of four highly prospective gold targets with assays pending; Plus, the first of two regional geophysical surveys now completed with data interpretation underway Highlights: • Reverse Circulation (RC) drilling programs completed at the Kaolin Shaft, Murrays and Carpina North (Figure 1) gold prospects, with assays pending. • Down-hole electromagnetic (DHEM) surveys comple

Talisman Mining Limited on 6ix

Earlier from Talisman Mining

Later from Talisman Mining

All Talisman Mining news releases