Business
Exploration Expands the High–Grade Silver-Lead Cate-8 Vein Discovered in the Upper Area of the Mine
KELLOGG, Idaho and VANCOUVER, British Columbia, June 01, 2026 (GLOBE NEWSWIRE) -- Bunker Hill Mining Corp. (“Bunker Hill” or the “Company”) (TSX: BNKR | OTCQB: BHLL) reports further successful results from the ongoing exploration drill program testing the high-grade silver-lead Cate-8 Vein discovery adjacent to current development in the upper area of the Bunker Hill mine (the “Bunker Hill Mine”). Seven holes have been drilled to date for a total of 2,750 feet from the 8 Level. Assay results for
About this update from Bunker Hill Mining Corp
KELLOGG, Idaho and VANCOUVER, British Columbia, June 01, 2026 (GLOBE NEWSWIRE) -- Bunker Hill Mining Corp. (“Bunker Hill” or the “Company”) (TSX: BNKR | OTCQB: BHLL) reports further successful results from the ongoing exploration drill program testing the high-grade silver-lead Cate-8 Vein discovery adjacent to current development in the upper area of the Bunker Hill mine (the “Bunker Hill Mine”). Seven holes have been drilled to date for a total of 2,750 feet from the 8 Level. Assay results for the first five drillholes show significant intercepts, summarized below (results for BHE26-01 and BHE26-02 reported in the Company’s press releases dated May 4, 2026 and May 12, 2026). The last two drill holes, BHE26-06 and BHE26-07, also both intersected siderite-galena veins ranging from 1 to 6 feet in length; these holes have been logged, and samples have been submitted to the assay lab. HIGHLIGHTS: Sam Ash, President and CEO, commented: “As we prepare to restart operations this month, these results from the Cate 8 exploration program already exceed our expectations. In particular, the consistency, grade, and thickness of mineralization indicate a new discovery, which will assist with our goal of returning the mine to its historic 50% silver and 50% base-metal mix. Based on this, we are planning to expand the program to potentially define a resource that can be incorporated early in the mine plan. Because of its proximity to existing development and potentially significant tonnage and silver grades in preliminary target estimates, I anticipate that, with continued drill success, we will add the Cate I area to the mine plan in ways that could improve the 2027 and 2028 silver production profile.” WEBINAR The Company will also host a live investor webinar on Wednesday, June 3, 2026, at 10 am PT to discuss the exploration results and the upcoming June restart of opera...
View stock analysis, news, and events for Bunker Hill Mining Corp