Exploration Commences at Mabel Creek IOCG Project
Filed with ASX · · 7 pages · English
Summary by 6ix AI
Talisman Mining Limited has announced the commencement of exploration at the Mabel Creek IOCG Project in South Australia, which includes an extensive Ground Gravity survey over the area. This survey aims to cover the entire project area and will help generate drill targets for future exploration activities planned for later in the year. The survey is being conducted by Atlas Geophysics and is expected to take six to eight weeks to complete.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Talisman Mining Limited on 6ix
In the deck
Earlier from Talisman Mining
- Significant Base Metals Discovery Confirmed at Burning's
- Reinstatement to Quotation
- Suspension from Quotation
- Pause in trading
- Latest results extend Rip n Tear discovery to over 1.8km
Later from Talisman Mining
- Trading Halt
- Strong Copper-Gold and Base Metal Intercepts Confirm Signifi
- Breakthrough Mineral Discoveries on Australia's East Seaboar
- Latest Assays Further Expand Rip n Tear Prospect
- Second High-Grade Copper-Gold and Base Metal Zone Discovered
Follow Talisman Mining into a list and get an email when it puts out news.
Follow Talisman Mining