Excellent Gold Results at Monument Gold Project
Filed with ASX · · 20 pages · English
Summary by 6ix AI
Verity Resources Limited has announced significant progress in infill drilling results at the Monument Gold Project, confirming increasing confidence in the resource. The results include multiple substantial gold intercepts, demonstrating reliable grade continuity and validating historical drilling data. The Phase One drilling program is approximately half complete, with additional results expected soon, and aims to upgrade a portion of the inferred resource to indicated status. The company is well-positioned to continue its resource upgrade and expansion strategy, with further exploration updates anticipated.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Verity Resources Limited on 6ix
Story so far
Earlier from Verity Resources
- Phase 2 Drill Program to Commence at Monument Gold Project
- Historical Drill Validation Confirms High Gold Grade Zones
- $3 Million Oversubscribed Placement Completed
- Resource Upgrade Drilling Complete at Monument Gold Project
- Quarterly Activities Report and Appendix 5B
Later from Verity Resources
- Diamond Drilling Commenced at 154koz Monument Gold Project
- Verity Takes 100% Ownership of Copper-Silver JV Projects
- Drilling Confirms Widespread REE at Pimenta Project, Brazil
- Up to 38g/t Au from Successful Phase 1 Drilling
- IP Survey at Perseverance Gold Target
Follow Verity Resources into a list and get an email when it puts out news.
Follow Verity Resources