Early Drill Results Positive at Snowstorm
Filed with ASX · · 13 pages · English
▪ Diamond drilling commenced in mid-February at the Snowstorm Project (EL5505), in the eastern Victorian Goldfields and is nearing completion of the 1,200m drilling program. ▪ Initial assay results have been obtained using Fire Assay only for some of the mineralised intervals (note; these results are only partial assays and are not entire hole assays) – further results are pending from Screen Fire
Story so far
Earlier from First AU
- Extension of Rights Issue Closing Date
- FAU Supplementary Prospectus
- Announcement of despatch of Prospectus Options Rights Issue
- Non-Renounceable Pro-Rata Options Rights Issue
- Drilling commencing at Snowstorm -Completion of Placement
Later from First AU
- Results of Rights Issue
- Binding commitments received for rights issue shortfall
- Snowstorm Drilling Intersects Mineralised Dyke Swarm
- FAU to present at Asia Pacific 121 Conference
- JORC Resource Increases at Gimlet
Follow First AU into a list and get an email when it puts out news.
Follow First AU