Dumbarton Drilling Recommences
Filed with ASX · · 7 pages · English
• RC Drilling has recommenced at the Dumbarton Prospect (P37/8825). • A fifteen-hole program is planned to test and confirm the strike extensions of the main shaft workings, a second old working to the southern end of the lode system some 320m away and follow up significant intersections returned from 22DBRC0004 and 22DBRC0005. • The drill program is designed to extend the known mineralisation’s s
Earlier from Mt Malcolm Mines NL
- Emu Egg Prospect Area Update
- 121 Conference Investor Briefing
- AMEC Investor Briefing
- Calypso Exploration Update
- Dumbarton Drill Results
Later from Mt Malcolm Mines NL
- Diamond Drilling Recommences at Calypso
- RC Drilling Completed at Dumbarton
- Diamond Drilling Complete at Calypso
- Diamond Drilling Complete at Calypso (Updated)
- Constance Lodes Confirm T3 Discovery Zone at Calypso
Follow Mt Malcolm Mines NL into a list and get an email when it puts out news.
Follow Mt Malcolm Mines NL