Jubilee Platinum PLC
19 July 2005
19 July 2005
AIM: JLP
JUBILEE PLATINUM PLC
('Jubilee' or 'the Company')
Step-out Drilling (Two Holes) on Tjate Project Confirms
Merensky and UG2 Reefs at Projected Horizons
Jubilee announces results for its step-out holes DT2 (overall reefs' grade and
thickness) and DT3 (Merensky reef thickness only) on the Dsjate farm ('Tjate
Project') in the Bushveld Complex of South Africa.
Highlights
• Step out drilling (up to 650 metres on plan) intersected at projected
horizons the Merensky reef ('MR') and UG2 chromitite reef ('UG2') for hole DT2
and the MR for hole DT3
• UG2 in hole DT2 included one high grade intersection of 9.23 g/t 4E
(platinum, palladium rhodium and gold)and showed an overall grade including two
deflections of 8.01 g/t 4E over an average 96 centimetre thickness
• Current hole DT3 intersected the MR at 916 metres which was target
depth with a wide 1.8 metre mineralised reef. Drilling continues to intersect
the UG2
The detailed drill results for hole DT2 are shown below:
Merensky Reef (intersected 722 metres)
Apparent 4E Pt Pd Rh Au Ni Cu Pt:Pd
thickness g/t g/t g/t g/t g/t % % ratio
cm
Motherhole 62 3.44 2.19 0.89 0.13 0.23 0.22 0.11
Deflection 1 60 1.52 1.00 0.34 0.03 0.16 0.11 0.07
Deflection 2 60 6.53 3.80 2.16 0.17 0.40 0.34 0.16
Weighted
average 61 3.83 2.33 1.13 0.11 0.26 0.22 0.11 2.1
UG2 Chromitite Reef (intersected 1109 metres)
Apparent 4E Pt Pd Rh Au Pt:Pd
thickness g/t g/t g/t g/t g/t ratio
cm
Motherhole 96 7.35 3.29 3.24 0.67 0.14
Deflection 1 92 6.66 3.43 3.15 0.73 0.13
Deflection 2 97 9.23 3.54 4.82 0.71 0.16
Weighted
average 95 8.01 3.42 3.75 0.70 0.14 0.91
Colin Bird, CEO of Jubilee and Tjate and Tjate Project Manager, said 'These
results are very pleasing since they represent significant step-outs from the
location of our first hole. They also confirm the size and mineralisation of
the deposit down dip and along strike and again have more than matched our
expectations. Our third hole DT3, intersected the Merensky reef horizon at
targeted depth and with projected thickness. We anticipate good grades from this
hole and are still on target to commence pre-feasibility studies during the
summer and early autumn.'
The Dsjate farm is one of three contiguous farms in the Tjate project, which
comprises 5,143 hectares in total.
Jubilee has a 25% stake in Tjate, together with an earn-in right to a further
10% interest by expending ZAR14 million towards a bankable feasibility study.
For further information please contact:
Colin Bird Cathy Malins / Annabel Leather
Jubilee Platinum plc Parkgreen Communications Ltd
Tel: 07768 397 627 Tel +44 20 7493 3713
This information is provided by RNS
The company news service from the London Stock Exchange
Drilling update from Tjate
Watch Jubilee Metals explain itJUBILEE METALS GROUP PLC (JLP) — Molefe Mine Update · Replay · Jun 10