Drilling underway at El Palmar
Filed with ASX · · 10 pages · English
Plus, latest soil sampling assays identify coherent gold and copper anomalies in the target area of the circular magnetic anomaly, which is interpreted to be a mineralised porphyry body Sunstone Metals Ltd (ASX: STM) is pleased to announce that the Phase 1 drilling program has started at the highly prospective El Palmar copper-gold porphyry target in northern Ecuador (Figure 1). Sunstone will unde
Story so far
Earlier from Sunstone Metals
- Drilling about to commence at El Palmar
- Brama - Drilling intersects 505m of mineralised porphyry
- A$10.3 million from part sell down of Copperstone investment
- El Palmar copper gold porphyry - compelling drill target
- Brama drillhole - 450m gold-copper intersection from surface
Later from Sunstone Metals
- Copper porphyry intersected in first hole at El Palmar
- El Palmar first hole completed
- Copper porphyry intersected in second hole at El Palmar
- Bramaderos Drilling Results and Plans for 2021
- El Palmar Gold-Copper Porphyry Discovery
Follow Sunstone Metals into a list and get an email when it puts out news.
Follow Sunstone Metals