Drilling to Re-commence at Yidby Gold Deposit
Filed with ASX · · 5 pages · English
30 August 2021 __________________________________________________________________________________ DRILLING TO RE-COMMENCE AT YIDBY GOLD DEPOSIT Testing a 400 m wide mineralised shear corridor st Up to 2,000 m of RC drilling expected to commence on 1 September to test and extend the Yidby Road gold mineralisation Structural interpretation of the Yidby Gold Deposit completed to identify the Cryp
Story so far
Earlier from Surefire Resources NL
- Perenjori Iron Project Scoping Study Confirms Economic Poten
- Yidby Gold Project Further Massive Gold Intersections
- Kooline Project 100% Major Copper-Gold Potential Identified
- Perenjori High Grade Iron Ore Production Study Commenced
- Yidby Gold Project Massive Gold Intersects
Later from Surefire Resources NL
- Large Au MMI Soil Anomaly Defined at Yidby Gold Project
- Kooline Project Strong Bedrock Conductors Identified
- Exploration Update - Yidby Gold 100% WA
- Perenjori WA New Lease Granted
- Yidby Recent Drilling Intersects Wide Gold Mineralisation
Follow Surefire Resources NL into a list and get an email when it puts out news.
Follow Surefire Resources NL