Further to its previous interim release, Anglesey Mining plc has now received
the final assay results from the last diamond drill hole in its current
programme. The hole reached total depth of 598 metres.
Significant mineral intersections recorded were as follows:
From To Interval Cu Pb Zn Ag Au
(metres) (metres) (metres) (%) (%) (%) (g/t) (g/t)
82.00 82.20 0.20 0.19 1.35 5.21 6 0.06
257.70 261.90 4.20 1.05 0.02 0.04 <5 0.10
342.70 343.10 0.40 5.43 5.35 12.21 33 0.06
432.70 434.70 2.00 2.86 0.11 1.11 15 0.12
487.40 489.70 2.30 1.54 0.86 3.45 9 0.04
493.60 494.65 1.05 1.05 3.33 7.96 29 0.01
496.60 502.10 5.50 3.73 6.06 12.51 78 0.37
525.50 529.60 4.10 1.49 0.03 0.04 5 0.01
As previously reported, and as detailed above, AMC17 included the following
composite intersection within the Engine Zone:
From To Interval Cu Pb Zn Ag Au
(metres) (metres) (metres) (%) (%) (%) (g/t) (g/t)
487.40 502.10 14.70 1.78 2.67 5.90 33 0.15
In the area of the Morris Shaft, some 600 metres distant from AMC 17, the Engine
zone represents a significant component of the resources published by the
company. This intersection in AMC 17 and that reported previously in AMC 15,
also in the Engine zone and a further 400 metres away from the Morris Shaft, are
considered to be highly important to the development of the Parys Mountain
property.
On-going review
The company's geological consultants are currently reviewing and analysing all
the results from the drilling programme for AMC15, AMC 16 and AMC 17 including
the assay results shown here together with the results from lithogeochemical
investigations. It is expected that their conclusions will be reported within
the next few weeks.
For further information please contact:
Ian Cuthbertson, Finance Director + (44) 1248 361333
Bill Hooley, Executive Director + (44) 1492 541981
John F. Kearney, Chairman + (1) 416 362 6686
Cathy Malins / Annabel Leather,
Parkgreen Communications + (44) 20 7493 3713