Drilling Recommences West of RPM 132m @ 10.1g/t Intercept
Filed with ASX · · 7 pages · English
Summary by 6ix AI
Nova Minerals Limited has announced the recommencement of drilling at the RPM deposit as part of its Estelle Gold Project in Alaska, following the construction of drill pads. The initial drilling is taking place west of a previous major discovery hole, where a significant intercept was recorded. Continuous updates on drill results are expected throughout the year as assays become available.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Story so far
Earlier from Nova Minerals
- Further High Grade Lithium Results for Snow Lake Lithium
- Further Significant Drill Results from Snow Lake Lithium
- Drilling Recommences at the Estelle Gold Trend
- Snow Lake Lithium Announces Drill Results
- Snow Lake Lithium Proposed Lithium Hydroxide Plant
Later from Nova Minerals
- RPM Gold Deposit Operational Update
- Exceptional High-Grade Gold Continues at RPM North
- Concentrate Leach Recoveries of over 96% achieved at RPM
- Nova Hits 78m @ 16.0 g/t Gold Within 258m @ 5.1g/t at RPM
- Drilling Now Commenced at Cathedral within the Korbel Valley
Follow Nova Minerals into a list and get an email when it puts out news.
Follow Nova Minerals