Drilling Recommences at Halls Peak Project
Filed with ASX · · 3 pages · English and French
Critical Resources Limited (ASX: CRR) (“Critical Resources” or the “Company”), is pleased to announce that drilling has recommenced at its Halls Peak project in New South Wales. Of the planned ~2,500m drilling program at the Gibsons prospect, five holes totalling ~650m have already been completed. Visual Massive Sulphide intervals and disseminated sulphide mineralisation has been intersected in th
Story so far
Earlier from Critical Resources
- Mavis Lake Lithium Project Acquisition Completed
- Massive & Disseminated Sulphide Intersection- 4th Drill Hole
- Massive Sulphides Intersected in Second Drill Hole - Gibsons
- More Mineralisation and Visual Massive Sulphides at Gibsons
- Visual Massive Sulphides Intersected in First Drill Hole
Later from Critical Resources
- Outstanding High Grade Zinc, Copper and Silver Assays
- Visual Massive and Base Metal Sulphides Intersected
- Pause in Trading
- Intervals of Visible Chalcopyrite across 7.6m-Step Out Hole
- Acquisition of Graphic Lake Lithium Project - Ontario Canada
Follow Critical Resources into a list and get an email when it puts out news.
Follow Critical Resources