Elixir Energy LimitedASX: EXR

Drilling operations commence at Lorelle-3

· Issued by Elixir Energy Limited

Filed with ASX · · 3 pages · English

Summary by 6ix AI

The drilling campaign will be conducted in two phases, starting with a pilot hole to evaluate various Permian sandstone targets. This operation is significant as it aims to validate the value of Elixir's acreage in the region and demonstrate commercial flow rates of gas and condensate.

Written by 6ix AI from the company’s filing. How 6ix writes summaries

Elixir Energy Limited on 6ix

Story so far

Earlier from Elixir Energy

Later from Elixir Energy

All Elixir Energy news releases