Drilling Commences at Formentera Lithium Well 9
Filed with ASX · · 3 pages · English
Summary by 6ix AI
The drilling involves preparing steel casing and conducting a gamma porosity survey, followed by a pump test to evaluate aquifer performance. This well is the last required before the company issues a comprehensive updated Mineral Resource Estimate. The Executive Chairman expressed optimism about the well's potential to enhance the mineral resource estimate category.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Patagonia Lithium Limited on 6ix
Story so far
Earlier from Patagonia Lithium
- Well 7 Core and BMR Align on Porosity
- Ten New Locations Identified in Brazil for Rare Earths
- Successful Well 8 reaches end of hole
- Mineral Resource Estimate Interim Progress Report
- Quarterly Activities and Cashflow Report 30 June 2026
Later from Patagonia Lithium
- Significant Porosity Results from Well 8
- Significant Pump Test Results from Well 8
- Well 9 Drilling Completed
- Significant Pump Test Results from Well 8 Correction
- Quarterly Activities and Cashflow Report 30 September 2026
Follow Patagonia Lithium into a list and get an email when it puts out news.
Follow Patagonia Lithium