Jun. 8, 2011 (Filing Services Canada) -- Bayswater Uranium Corp. (BYU - TSX Venture, BYSWF - OTC Pink Sheets), is pleased to report that AUC LLC ("AUC"), an affiliate that holds the Reno Creek properties and is Operator of the Reno Creek Uranium Project, has made significant progress on its 2011 delineation drilling program and environmental baseline studies at Reno Creek located in Campbell County, Wyoming. In addition, AUC continues to be on schedule to submit its applications to the National Regulatory Commission ("NRC") for a Source Materials License and to the Wyoming Department of Environmental Quality ("WDEQ") for a Permit to Mine uranium at the Reno Creek site. Following are the highlights of the extensive ongoing program.
AUC has completed the first 67 holes of the planned 2011 350 hole drilling program; and in addition, AUC is on schedule to complete environmental baseline studies in 2011. The drilling program includes a combination of confirmation and step-out drilling in the southwestern portions of the project area plus coring of the host sandstones for metallurgical and engineering testing to support the applications for permits to the NRC and WDEQ.
Sixty-seven holes have been completed, including three core holes and two re-entries of historical holes, for a total of about 24,000 feet at SW Reno Creek. The historical holes were cleaned out to total depth previously drilled, re-logged, and then plugged and reclaimed in accordance with WDEQ regulations. The re-entries are designed to verify historical data, and to assess the condition of historical drill hole plugging activities. The current logging of these two holes compared favorably to and confirmed the historical data. Both holes were found to be sealed throughout the entire saturated section, thus maintaining the hydrologic seal through the full reach of the overlying aquitard. Results of sub-regional hydrologic pumping tests conducted early this year in the same area of these historic boreholes also confirmed the hydraulic continuity of the effective overlying aquitard seal.
Highlights from the first 67 holes drilled during 2011, are as follows:
* Drilling confirmed the results of previous historical drilling in two holes;
* Drilling identified additional mineralization along extensions of known resources by stepping out from the historical edge of open areas of mineralization that could potentially add to the resource base for the project; and
* Drilling defined significant uranium intercepts utilizing cutoff grades of greater than or equal to 0.03% eU3O8 and grade-thickness values of 0.30 as highlighted in the table below from the first 67 holes drilled.
LISTING OF INTERCEPTS GRADING 0.02% eU3O8 or HIGHER
2011 DRILLING PROGRAM as of May 20, 2011
Drilling in Southwest Reno Creek Area
In addition, AUC's 2011 environmental baseline studies have resulted in the following important preliminary findings that relate directly to amenability of the Reno Creek Project to ISR mining:
------------------------------------------------------------------------
Hole ID Depth to Intercept Grade Intercept SUM of
Intercept Thickness (% eU3O8) GT Intercept
Top (feet) (feet) GTs
------------------------------------------------------------------------
RC0001 312.0 7.5 0.030 0.225 0.278
358.5 2.5 0.021 0.053
RC0004 260.0 1.5 0.023 0.035 0.035
RC0006 330.0 16.0 0.049 0.784 0.874
349.0 4.5 0.020 0.090
RC0001C 229.5 4.5 0.024 0.108 2.086
236.5 20.5 0.027 0.554
329.0 16.0 0.089 1.424
RC0002C 328.0 24.5 0.117 2.867 2.867
RC0006C 342.5 16.0 0.042 0.672 0.672
RC0011 245.0 5.5 0.026 0.143 0.143
RC0012 236.0 6.5 0.020 0.130 0.130
RC0014 264.0 4.0 0.021 0.084 0.570
327.0 7.5 0.048 0.360
346.0 3.0 0.042 0.126
RC0015 213.0 12.5 0.021 0.263 0.688
318.5 12.5 0.034 0.425
RC0017 220.0 8.0 0.021 0.168 0.324
321.5 6.5 0.024 0.156
RC0018 316.0 7.5 0.030 0.225
RC0019 236.5 22.0 0.030 0.660 1.956
RC0019 330.0 18.0 0.072 1.296
RC0020 316.0 18.5 0.130 2.405 2.405
360.5 2.5 0.040 0.100
RC0029 352.5 3.0 0.026 0.078 0.078
RC0033 229.0 8.0 0.024 0.192 0.242
250.5 2.5 0.020 0.050
RC0034 245.5 3.5 0.153 0.536 0.656
331.0 6.0 0.020 0.120
RC0035 237.0 7.0 0.057 0.399 0.399
RC0036 328.5 4.0 0.035 0.140 0.242
338.0 3.5 0.029 0.102
RC0037 326.0 5.0 0.023 0.115 0.115
RC0038 334.0 10.0 0.043 0.430 0.430
RC0039 327.5 14.5 0.031 0.450 0.450
RC0040 354.5 4.0 0.037 0.148 0.148
RC0041 321.0 17.5 0.031 0.543 0.778
345.5 5.0 0.047 0.235
RC0042 336.5 12.0 0.059 0.708 0.773
349.5 2.5 0.026 0.065
RC0043 355.5 3.5 0.066 0.231 0.231
RC0045 340.5 14.0 0.043 0.602 0.602
RC0046 331.0 18.5 0.029 0.537 0.537
RC0047 316.0 13.5 0.049 0.662 0.662
RC0049 318.5 8.5 0.021 0.179 0.179
RC0051 228.5 8.0 0.032 0.256 1.065
323.5 14.0 0.040 0.560
344.5 3.0 0.083 0.249
RC0052 226.5 23.0 0.056 1.288 1.586
318.0 8.0 0.030 0.240
330.0 2.5 0.023 0.058
RC0053 330.5 7.5 0.036 0.270 0.270
RC0054 252.0 3.0 0.021 0.063 0.063
RC0055 255.5 8.5 0.024 0.204 0.204
RC0057 244.5 8.0 0.028 0.224 0.314
259.5 4.5 0.020 0.090
RC0058 360.0 3.0 0.026 0.078 0.173
364.5 3.5 0.027 0.095
14W360166 279.0 1.5 0.025 0.038 0.038
RC0061 265.5 3.0 0.023 0.069 0.620
360.0 4.5 0.029 0.131
367.0 7.0 0.060 0.420
RC0062 340.0 8.0 0.030 0.240 0.360
362.0 5.0 0.024 0.120
RC0064 338.5 8.5 0.050 0.425 0.425
RC0065 345.5 23.5 0.029 0.682 0.682
-------------------------------------------------------------------------
* Delineation drill hole and monitoring well data confirmed that the mineralized sandstone horizon is physically confined above and below by a low permeability shale or mudstone across the entire project area.
* A second pump test has been successfully completed. The data from the first two pump tests document that the hydrologic conditions such as permeability and transmissivity are within the normal operating ranges exhibited at existing commercial ISR production facilities in Wyoming. In addition, the data document that there is no hydrologic communication between the mineralized sandstone and the underlying and overlying aquifers in the area of the pump testing. This finding also confirms that there is no evidence of hydrologic leakage or communication through historical drill holes.
During February and May of 2011, AUC successfully completed its second and third quarterly meetings with the Nuclear Regulatory Commission (NRC) and the Wyoming Department of Environmental Quality (WDEQ), respectively, to provide an update on the progress of activities, discuss ongoing findings of the baseline studies, and affirm that the baseline program continues to meet the needs of both agencies for their review of future permit applications.
Upon completion of data collection, compilation and analysis for baseline studies, AUC intends to assemble and submit its applications to the NRC and the WDEQ. AUC has carefully studied both the evolving permitting processes and the experiences of Ur-Energy (TSX: URE), Uranium One (TSX: UUU), Uranerz (AMEX: URZ), and Powertech (TSX: PWE) over the past four years, including a detailed review of all of the Requests for Additional Information (RAI) issued by the NRC and WDEQ and the Environmental Impact Statements for each project. Now that licenses and permits are being granted by the agencies, it is possible to use this information and AUC's own detailed discussions with the NRC and WDEQ respective staff to assure that its application documents contain the required information. AUC anticipates that this effort could improve the efficiency of agency review and could substantially reduce the time required for receipt of permits. Bayswater's previously announced schedule, anticipated that AUC would be in a position to commence a feasibility study in early 2013 with construction development to follow once completed and be in production by 2015. AUC now believes that all phases of the Project, including the permitting time-line, may be shortened.
Bayswater and Pacific Road Resources Funds ("PRRF") are developing the Reno Creek Uranium Project through Reno Creek Holdings Inc. ("RCHI"), which holds the Project through RCHI's wholly owned subsidiary AUC. Bayswater currently has a 17.27% interest in RCHI that may be increased to 31.14%. PRRF is entitled to convert its investment in RCHI into common shares of Bayswater at any time up to six months following the later of completion of a feasibility study or receipt of all requisite mining permits, but in any event PRRF shall convert its investment not later than within five years of acquisition of the Project, provided certain conditions are met. Upon conversion of PRRF's investment, Bayswater will own a 100% interest in RCHI which holds the Reno Creek property. Currently, James Viellenave, President of AUC is the Project Manager and reports to the board of AUC in regards of all activities conducted on the Reno Creek project. Two representatives from each of PRRF and Bayswater comprise the board of AUC, with PRRF holding a majority interest in AUC.
In other news, Bayswater reports that it has acquired by staking strategic ground covering a potential extension to its Anna Lake uranium deposit, Labrador. Also, Bayswater reports that Cascade Resources Ltd. have declined to close the acquisition of its uranium concessions in Niger, West Africa and as a result Bayswater has terminated its interest in the concessions.
The Company's exploration activities are conducted under the supervision of George M. Leary, M.Sc. P. Eng. (B.C.), President of the Company, and Victor Tanaka, B.Sc. P.Geo. (B.C.), Executive VP and Chief Operating Officer of the Company. Both are Qualified Persons under NI 43-101. George Leary is the qualified person responsible for the technical information in this news release.
About Bayswater Uranium Corporation - The Super Junior Uranium Company TM
Bayswater Uranium Corporation is an international uranium exploration and development company. The Company owns several advanced uranium properties in the United States with significant NI 43-101 compliant and historical resources that may be amenable to ISR and/or conventional mining. With the acquisition of the Reno Creek Property, WY, the Company's focus is to develop Reno Creek to production in the shortest time frame possible. The Company's Elkhorn/Alzada Project, located approximately 100 miles northeast of Reno Creek, is being advanced as a complementary or stand alone project for future potential production. As well, Bayswater is the only uranium company to have strategic landholdings in each of Canada's most important producing and exploration regions - the Athabasca Basin, the Central Mineral Belt, and the Thelon Basin. Bayswater combines a balanced portfolio of advanced and exploration projects with the uranium expertise of its technical and managerial teams. To capitalize on current market conditions and strong growth of the nuclear industry, the Company will continue to pursue acquisition opportunities of advanced-stage uranium projects with production potential. Bayswater's vision is to build a major international uranium company. Shares of the Company are listed on the TSX Venture Exchange under the symbol "BYU". For further information visit www.bayswateruranium.com.
About Pacific Road Resources Funds and Pacific Road Capital Management Pty Limited
The Pacific Road Resources Funds are private equity funds investing in the global mining industry. They provide expansion and buyout capital for mining projects, mining related infrastructure and mining services businesses located throughout resource-rich regions of the world. The Pacific Road Resources Funds are managed and advised by Pacific Road Capital Management Pty Ltd ("PRCM"). The PRCM team, located in Sydney, Australia, San Francisco and New York, USA, is comprised of experienced mining investment professionals that have extensive knowledge and experience in the mining and infrastructure sectors, including considerable operating, project development, transactional and investment banking experience. For further information on the Pacific Road Resources Funds and PRCM, please go to their website at www.pacroad.com.au.
On behalf of the Board of:
BAYSWATER URANIUM CORPORATION
George M. Leary
President
For further information contact:
John Gomez
Manager, Investor Relations
Telephone: (604) 687-2153
Statements in this news release other than purely historical information, including statements relating to the Company's future plans and objectives or expected results, constitute forward-looking statements. Forward-looking statements are based on numerous assumptions and are subject to all of the risks and uncertainties inherent in the Company's business, including risks inherent in mineral exploration, development and mining. There can be no assurance that such forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on such statements. The Company does not undertake to update any forward-looking statements that are incorporated by reference herein, except in accordance with applicable securities laws. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.
1111 Melville Street, Suite 1100 .
Vancouver, BC, Canada . V6E 3V6 .
Tel 604-687-2153
www.bayswateruranium.com
To view this press release as a web page, please click on the following link:
http://www.usetdas.com/pr/bayswater06082011.htm
Source: Bayswater Uranium Corporation (TSX-V: BYU) http://www.bayswateruranium.com
Maximum News Dissemination by Filing Services Canada Inc. http://www.usetdas.com