
TSX:DPM
TSX: DPM ASX: DPM
Uniquely Positioned to Deliver Superior ValueThird Quarter 2026 Results
November 13, 2026
Non-GAAP MeasuresCertain financial measures referred to in this presentation are not measures recognized under IFRS and are referred to as Non-GAAP financial measures or ratios. These measures have no standardized meanings under IFRS and may not be comparable to similar measures presented by other companies. The definitions established and calculations performed by the company are based on management's reasonable judgment and are consistently applied. These measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures prepared in accordance with IFRS. This slide presents the most directly comparable measures under IFRS to those Non-GAAP financial measures used in this presentation. For a detailed reconciliation of Non-GAAP financial measures or ratios, please refer to the "Non-GAAP Financial Measures" section on pages 35 to 43 of the Management's Discussion and Analysis ("MD&A") for the three and nine months ended September 30, 2026, available on our website at www.dpmmetals.com and on SEDAR+ at www.sedarplus.ca.
Mine cost of sales and
All-in sustaining cost1,5 ($/GEO sold)
Cash provided by operating activities and Free cash flow2 ($M)
Net earnings
and Adjusted net earnings3 ($M)
$96
$129
$134
$144
$148
$185
$179
$191
$1,203
$1,580
$1,465
$1,456
Q3 2025 Q3 2026
Q3 2025 Q3 2026
Q3 2025 Q3 2026
Mine cost of sales
All-in sustaining cost
Cash provided by operating activities from continuing operations
Free cash flow from continuing operations
Net earnings
Adjusted net earnings
$272
$212
$523
$530
$1,193
$1,472
$1,273
$1,423
$321
$339
$610
$617
YTD Q3 2025 YTD Q3 2026
YTD Q3 2025 YTD Q3 2026
YTD Q3 2025 YTD Q3 2026
Mine cost of sales
All-in sustaining cost
Cash provided by operating activities from continuing operations
Free cash flow from continuing operations
Net earnings
Adjusted net earnings
1. Refer to footnote #1 on slide 20.
2. Refer to footnote #2 on slide 20.
3. Refer to footnote #3 on slide 20.
5. Refer to footnote #5 on slide 20.
3
Q3 2026 Highlights
4
Third Quarter Highlights Performance demonstrates strengths that underpin growth strategy☑ Operational Delivery
On track to meet 2026 GEO5 production guidance4 for the 12th consecutive year
Achieved Vareš commercial production ahead of schedule; ramp-up on track for year-end 2026
☑ Advancing Growth Pipeline
Increased 2026 exploration spending to
$75 - 80 million, reflecting strong results
High-grade Wedge Zone prospect
Major discovery at Brevene Porphyry South
Advancing Čoka Rakita procurement
Rakita Camp Tier One gold asset potential
☑ Generating Strong Margins
Q3 all-in sustaining cost1,5 per GEO sold:
$1,580/oz. (includes $270/oz. mark-to-market adjustment to share-based compensation)
On track to meet 2026 AISC guidance4
☑ Strong Financial Position
$179 million of free cash flow2
$144 million of adjusted net earnings3
$172 million of capital returned to shareholders YTD
$839 million in cash
Undrawn $400 million credit facility
Vareš Ramping up to Full Production in 2026 On track to achieve ramp-up to 850,000 tonne per year run-rate by year-endGuidance range
AISC
Guidance range
Production
2026
Guidance
YTD Q3
2026
Q3 2026
2026
Guidance
YTD Q3
2026
Q3 2026
44.5
$717
$767
108.7
$900 - $1,050
105 - 130
AISC1,5
$ per GEO sold
GEO Produced5
K
2026 Guidance4
2026 a transitional year for VarešAchieved commercial production in August
Second tailings filter expected to commission in November
Accelerating gold and silver production
Commenced surface drilling program in Q2
Strong third quarter performance:
Produced 44,456 GEO5 and expected to exceed high-end of production guidance4
All-in sustaining cost1,5 of $767 per GEO sold
Optimization for 2027 and beyond
Evaluating opportunities to optimize cost structure following commercial production
Q3 2026 | Q3 2025 | YTD Q3 2026 | YTD Q3 2025 | 2026 Guidance4 | |
Ore processed Kt | 530 | 557 | 1,586 | 1,631 | 2,100 - 2,200 |
Head grades: | |||||
Gold g/t | 2.87 | 3.02 | 2.86 | 2.99 | |
Silver g/t | 6.29 | 7.15 | 12.7 | 6.71 | |
Copper % | 0.56 | 0.77 | 0.70 | 0.68 | |
Recoveries: | |||||
Gold % | 83.6 | 81.9 | 79.5 | 82.0 | |
Silver % | 42.7 | 41.8 | 58.5 | 42.3 | |
Copper % | 83.9 | 82.1 | 83.1 | 82.5 | |
GEO produced5 Koz | 49.7 | 54.9 | 149.1 | 157.6 | 185 - 215 |
GEO sold5 Koz | 45.0 | 49.0 | 134.5 | 135.1 | 170 - 190 |
Cash cost per tonne of ore processed $/t | 78 | 63 | 75 | 60 | 69 - 74 |
Mine cost of sales1,5 $/GEO sold | 1,085 | 915 | 1,070 | 909 | |
All-in sustaining cost1,5 $/GEO sold | 1,460 | 1,217 | 1,365 | 1,152 | 1,250 - 1,400 |
Potential to augment Chelopech life of mine plan and for near-term higher grade mill feed by end of 2028
Drilling in H1 2026 continues to extend mineralization at grades well in excess of existing Mineral Reserves:
EX_WZD_210_01: 68 m at 7.42 g/t AuEq
EX_WZD_165_03: 58 m at 15.28 g/t AuEq
EX_WZD_165_05A: 81 m at 8.05 g/t AuEq
Similar dimensions to DPM's Čoka Rakita project: 150m x 100m x 350m
H2 2026 drilling program seeks to extend and infill
existing mineralization
Ramp development commencing in Q4 2026; expect to commence construction of the twin declines in Q1 2027
Wedge Zone initial Mineral Resource estimate expected by year-end 2026
Brevene Porphyry South Major discovery of high-grade gold-copper porphyry system adjacent to Chelopech mineResults demonstrating grade, scale and continuity
EX_BRES_555_02A: 717 m at 3.30 g/t AuEq, including 139 m at 5.71 g/t AuEq
EX_BRESPO_03: 1,054 m at 2.49 g/t, including 465 m at
3.02 g/t AuEq
Widths and grades are well above typical porphyry benchmarks
Mineralization footprint exceeds 500m x 500m and extends over 1,000 m vertically
Open to the north, south, west and at depth
Results confirmed extension onto the Chelopech mine concession, to where drilling will be transitioning to further expand known mineralization
Up to 8 high-capacity drill rigs
15,000 metres planned through end of 2026
Initial Mineral Resource estimate planned for H2 2027 and to support PEA planned for H1 2028
Čoka Rakita Project: High-Margin Production GrowthSwift advancement to date underpinned by +20 years of in-country experience
High-margin
underground gold mining operation
$644/oz. Au sold
all-in sustaining cost
$448M
initial capital expenditures
1.52 million oz Au
of Probable Mineral Reserves over a 10-year mine life
189,000 oz Au annual production
first 5 full years
From discovery in 2023 to feasibility in 2025
Following October 2026 elections, administrative and regulatory decision making timelines may be extended as new government is formed
DPM will work with relevant authorities to align the scheduling of the project's next phase, if required by the process of the government's formation
Continuing to advance engineering and procurement activities
Dismantling and refurbishing of the Ada Tepe mill components
Ramp-up of purchases and securing of fabrication timelines for critical equipment
Selection of underground contractor
Advancing detailed engineering
Environmental and permitting activities
Special Purpose Spatial Planning process in progress
Project Highlights6
Dumitru Potok: Large Inferred Mineral Resource Demonstrating Rakita camp's potential for district-scale gold-copper systems
From discovery to Mineral Resource in 18 months
Resource expansion as all three deposits remain open in multiple directions
Significant, new 2026 intercepts from Dumitru Potok:
BIDD253: 246 metres grading 1.36% CuEq from 1,377 m
DPDD042: 50 metres grading 3.68% CuEq from 761 m
RADDGTH009C: 76 metres grading 2.66% CuEq from 623 m
Higher-grade core at Dumitru Potok within 64Mt mineral resource
2.2 million ounces of gold and 1.5 billion pounds of copper
Updated Mineral Resource expected by Q1 2027, supporting a PEA targeting year-end 2027
Drill program budget increased up to an additional 15,000 metres with 10 drill rigs to expanding MRE, infill drilling and target testing
Deposit | Tonnes (Mt) | Gold Grade (g/t) | Contained Gold (K oz.) | Copper Grade (%) | Contained Copper (Mlbs.) |
Dumitru Potok | 64.1 | 1.07 | 2,206 | 1.08 | 1,535 |
Rakita North | 17.9 | 0.56 | 320 | 0.84 | 331 |
Frasen | 2.4 | 1.21 | 95 | 0.70 | 37 |
Total | 84.4 | 0.97 | 2,621 | 1.02 | 1,903 |
Mining completed as planned in July 2026; rehabilitation well underway
Technical rehabilitation of Integrated Mine Waste Facility (IMWF) targeted for year-end 2026
On track to complete active site rehabilitation by year-end 2028
Post-closure monitoring is planned for at least 10 years after closure and final reclamation
Follow the Ada Tepe story, visit https://www.dpmmetals-adatepe.com
Ada Tepe's transition to rehabilitation
September 21, 2016 - September 21, 2026
Source: FactSet. Market data as of September 21, 2026.
Peer index represents an equal-weighted index of OceanaGold, Centerra Gold, IAMGOLD, Eldorado Gold, B2Gold, Alamos Gold, Equinox Gold, and G Mining NAVPS, indexed to DPM net asset value per share on September 21, 2016.
4. Refer to endnote #4 on slide 20.
5. Refer to endnote #5 on slide 20.
6. Refer to endnote #6 on slide 20. Chart reflects a full year of production.
13
Financial Results Highlights
1414
Financial Results HighlightsStrong financial position
$839 million
cash balance
Strong adjusted net earnings3
$144.2M | $0.66/sh
Strong free cash flow2
$179.5 million
$ millions except where noted | Q3 2026 | Q3 2025 | % change | YTD Q3 2026 | YTD Q3 % change 2025 |
Revenue | 311.6 | 267.4 17% | 983.5 | 598.0 64% | |
Adjusted net earnings3 | 144.2 | 129.2 12% | 523.2 | 272.2 92% | |
Per share ($/sh) | 0.66 | 0.73 (10%) | 2.37 | 1.57 51% | |
Cash provided from operating activities | 191.3 | 184.5 4% | 616.9 | 339.0 82% | |
Free cash flow2 | 179.5 | 147.7 21% | 610.1 | 321.4 90% | |
Dividends paid | 8.8 | 6.7 | 32% | 26.5 | 20.5 29% |
Payments for share repurchases | 71.7 | - | 100% | 145.2 | 116.1 25% |
203
Key Cost Metrics and Capital ExpendituresAll-in sustaining cost1,5
$ per GEO sold
All-in sustaining cost
Average realized gold price8
Guidance range
$1,300 - $1,450
Q3 2026
YTD Q3 2026
2026 Guidance 4
MTM adjustments to share-based compensation expenses impacted AISC by $270 per GEO sold in Q3 2026 and $154 per GEO sold YTD
$1,472
$1,580
$4,534
$4,314
Capital expenditures
$ millions
Sustaining
Growth
195 - 210
87.7
25.6
8.1
14.5
25 - 32
Q3 2026
YTD Q3 2026
2026 Guidance 4
Reducing growth capital expenditures guidance to $195 million to $210 million
Lead
Zinc
Copper
Silver
Gold
66%
15%
12%
2%
5%
2026E Revenue by Metal
Over 80% of 2026E revenue from gold and silver
Based on the metal price assumptions used for DPM's guidance, and the mid-point of guidance for payable metals in concentrate sold. Refer to endnote #4.
Financial Strength to Fund Growth$198 million of shares repurchased year-to-date*
Growing cash position with no debt and a track record of shareholder returnsFinancial Position
$400M
Total liquidity
$1.2B
$839M
Cash and cash equivalents
Undrawn credit facility
YTD Q3
2026*
2025
2024
2023
2022
2021
2020
$79
$44
$33
$11
$96
$146
$166
$221
$228
$211
$252
$305
$505
$610
Shareholder Returns
$ millions
Free cash flow
Capital returned (dividends paid and payments for shares repurchased)
Growing European Precious Metals Producer Consistent, quality operations in Europe delivering peer-leading growth and margins for high returnsProven operator and production growth
Achieved production guidance for 11-years
Hungary
Croatia
Romania
Tier 1 geological potential
Four European 'discoveries' since 2023
Bosnia and Herzegovina
Serbia
Čoka Rakita gold project
Rakita Camp prospects
Vareš silver mine
Bulgaria
Chelopech gold-copper mine
Ada Tepe gold mine
European presence and scale
Stable, modernizing jurisdictions
Türkiye
Italy
Greece
High margin and capital discipline
Fully funded growth with capital returns
Information Category: Confidential - General
19
FootnotesCost of sales per GEO sold represents cost of sales for Chelopech, Ada Tepe and Vareš, divided by GEO sold. All-in sustaining cost per GEO sold, is a non-GAAP ratio which represents cost of sales less depreciation, amortization and other non-cash items plus treatment charges, penalties, transportation and other selling costs, cash outlays for sustaining capital expenditures and leases, rehabilitation-related accretion and amortization expenses and an allocated portion of the Company's general and administrative expenses based on mine's proportion of total revenue, divided by GEO sold. Non-GAAP measures have no standardized meaning under IFRS. For all non-GAAP measures discussed in this presentation, refer to the "Non-GAAP Financial Measures" section of the Company's MD&A for the three and nine months ended September 30, 2026 on pages 35 to 43 available on our website at https://www.dpmmetals.com and on SEDAR+ at https://www.sedarplus.ca for additional information, including why they are useful to investors, the additional purposes for which management uses these measures and, in the case of historical measures, a reconciliation with the nearest GAAP measures.
Cash provided from operating activities, before changes in working capital, is a non-GAAP financial measure defined as cash provided from operating activities excluding changes in working capital, which includes changes in share-based compensation liabilities, as set out in the Company's consolidated statements of cash flows. This measure is used by the Company and investors to measure the cash flow generated by the Company's operating segments prior to any changes in working capital, which at times can distort performance. Free cash flow is a non-GAAP measure and is defined as cash provided from operating activities, before changes in working capital, less cash outlays for sustaining capital, and any mandatory principal repayments and interest payments related to debt and leases.
Adjusted net earnings is a non-GAAP measure and is defined as net earnings attributable to common shareholders, adjusted to exclude specific items that are significant, but not reflective of the underlying operations of the Company, including: impairment charges or reversals thereof; unrealized and realized gains or losses related to investments carried at fair value; significant tax adjustments not related to current period earnings; and non-recurring or unusual income or expenses that are either not related to the Company's operating segments or unlikely to occur on a regular basis.
Forecast/guidance information is subject to a number of key assumptions, risks and uncertainties. Details of the Company's guidance and three-year outlook can be found in the MD&A for the three and nine months September 30, 2026, available on the Company's website at https://www.dpmmetals.com and on SEDAR+ at https://www.sedarplus.ca. See "Forward Looking Statements" on slide 2.
The Company uses conversion ratios for calculating GEO for its silver, copper, zinc and lead production and sales, which are calculated by multiplying the volumes of metal produced or sold, as applicable, by the respective assumed metal prices, and dividing the resulting figure by assumed gold price. The GEO calculated also includes minor quantities of other metals that are not considered material.
See the "NI 43-101 Technical Report Čoka Rakita Project Feasibility Study, Eastern Serbia" dated January 9, 2026, for additional information, which has been posted on the Company's website at https://www.dpmmetals.com and filed on SEDAR+ at https://www.sedarplus.ca.
For additional information regarding exploration activities in Serbia, see the technical report entitled "Technical Report - Mineral Resource Estimate for Dumitru Potok, Frasen and Rakita North Prospects, Eastern Serbia" dated January 16, 2026, available on the Company's website at www.dpmmetals.com and SEDAR+ at www.sedarplus.ca.
Average realized price is a non-GAAP ratio and represents the average price per unit recognized in the Company's consolidated statements of earnings (loss) prior to any deductions for treatment charges, refining charges, penalties, freight and final settlements to adjust for any differences relative to the provisional invoice.
20
| Attention: This is an excerpt of the original content. To continue reading it, access the original document here. |
