Denison Mines Corp.TSX: DML

Investor Update - March 2026

· MarketScreener

Corporate Update

March 2026

Uranium Development & Exploration

The Athabasca Basin, Northern Saskatchewan

#1 Non-Precious Mining

Development Project

in the World





Key Investment Highlights(1):

Advanced Athabasca Basin uranium developer with unique asset mix

Portfolio of four low-cost uranium development projects
  • Phoenix, Gryphon, Midwest and THT/Waterbury all projected within UxC's "First Tier" of global assets(2)

    #1 Phoenix combines lowest-cost mining method with Athabasca Basin high-grades
  • Ranked #1 non-precious mining development project globally in 2025 by Mining Journal Intelligence

  • Construction planned to commence in March 2026 for flagship In-Situ Recovery ('ISR') mine(3)

  • Final Investment Decision made shortly after regulatory approvals received to commence construction(3,4)

  • Technical de-risking completed; C$47M spent on long-lead procurement(5,6)

  • First production targeted by mid 2028(6)



    Ownership interest in strategic regional asset with McClean Lake mill and producing mine
  • Excess licensed milling capacity, with approval for expanded tailings management facility

  • 2025 mining restart at McClean North deposit announced by Orano Canada

    High-potential exploration portfolio and interests in key mines / projects operated by "majors"
  • Large Athabasca Basin exploration portfolio, including Moon Lake South and Johnston Lake properties

  • Minority interests in Cameco-JCU's Millennium project and Orano-JCU's Kiggavik project



    Strong balance sheet with ~C$718M in cash, physical uranium and investments(7)
  • Denison's financial and liquid assets on hand, relative to initial capex(6) for the flagship Phoenix development project

(C$570M for Denison's effective 95% interest) puts the company in a strong position

Focused on the infrastructure-rich Eastern Athabasca Basin in Saskatchewan, Canada Nuclear energy commitments: 30+ nations pledge to triple nuclear energy capacity by 2050(8)

3

NOTES: (1) See supporting slides for details. (2) UxC's Uranium Production Cost Study dated Aug. 2025. (3) See news release dated Feb. 24, 2026. (4) See news release dated Feb. 19th, 2026. (5) The amount spent on long lead procurement is a non-GAAP measure and reflects spend on items reported in property plant and equipment as of Nov. 30, 2025. (6) See news release dated Jan. 2, 2026. (7) As of Sep. 30, 2025. For additional details see financial statements and MD&A for the period ended Sep. 30, 2025. (8) World Nuclear News article dated Nov. 17, 2025.

Multi-asset leverage to uranium market from advanced + diversified Athabasca Basin asset base

95%(1)

effective interest in

Flagship

Wheeler River project

Consisting of two projects: Construction-stage Phoenix, Development-stage Gryphon

Phoenix construction planned to begin in March 2026(2)

Final Investment Decision made

+ regulatory approvals received to commence construction (2,3)

Largest Mineral Reserves of undeveloped uranium projects in the infrastructure rich eastern Athabasca Basin

22.5%

interest in

Strategic McClean Lake Uranium mill & mines

~12% of global uranium production processed through mill(4)

Mining restarted June 2025 using SABRE mining at McClean North deposit(5)

Excess licensed milling capacity

25.17%

interest in

High-grade Midwest project close to McClean mill

2025 Preliminary Economic Assessment ('PEA') for ISR mining at

Midwest Main deposit(6)

High-grades and close proximity to the McClean Lake mill support robust PEA economics

Also being evaluated for potential development with SABRE mining method

70.55%

interest in

Well-situated

Waterbury Lake project

PEA stage development project for ISR mining

proximal to McClean mill(7)

Tthe Heldeth Túé ('THT') deposit highlights potential for future development project pipeline(7)

Successful completion of 2023 ISR field test(8)

50% ownership of JCU(9), adding portfolio of interests including sizeable share of

development-stage assets operated by "majors"

JCU holds various Athabasca Basin exploration project interests, plus 30.099% in Millennium (Cameco) and 33.8118% in Kiggavik (Orano)

~457,000

hectares of exploration ground(10)

NOTES:.

  1. Denison's effective interest

    held directly and 5% held

    in Wheeler River includes 90%

    indirectly through its 50%

    Exploration Company,

    ownership of JCU (Canada) Limited.

    Feb. 24, 2026.

  2. See news release dated

    (4) Derived from UxC's

    (3) Phoenix Project - See news

    release dated Feb 19, 2026 Uranium Market Outlook

    dated Q4'2025

    (5) See news release dated Jul. 17, 2025.

    (6) See news release dated

    Aug. 6, 2025.

    (7) Refer to the Waterbury

    Lake Technical Report titled

    Assessment for the Tthe

    "Preliminary Economic

    Northern Saskatchewan,

    Heldeth Túé (J Zone) Deposit,

    Waterbury Lake Property,

    Canada" dated Oct. 30, 2020.

    1. See news release dated

      Nov. 6, 2023.

    2. See news release dated

    Aug. 3, 2021.

    (10) Denison direct land

    positions held by JCU.

    position shown as of Dec. 17, 2025; excludes the land

    4



    Denison's Development Portfolio Projects:

    Four assets amongst the lowest all-in cost assets of UxC's First Tier

    Sample of Global Production Costs - August 2025(1)(2)(3)(4)

    Planned and Producing Operations (with Mining Method)

    UxC's "First Tier"

    (includes lowest-cost projects with full costs up to ~US$37.50/lb U3O8)

    "Second Tier"

    (up to ~US$50.01/lb U3O8)

    "Third/Fourth Tier"

    (up O )

    to ~US$97.51/lb U3

    8

    $18.41 (2026)(2)

    $24.93 (2020)

    $25.47 (2023)

    $25.78

    (2025)



    $80

    All-in / Full Costs - USD$/lb U3O8

    $70

    $60

    $50

    $40

    $30

    ISR ISR ISR

    ISR UG

    UG

    UG UG ISR

    UG ISR UG

    ISR

    $20

    UG OP OP OP ISR ISR ISR OP

    OP

    $10

    $0





    Denison/Canada (Technical Reports)

    Denison/Canada (UxC Est.)

    Canada

    Kazakhstan

    Australia

    1. Africa

      ISR: In-Situ Recovery UG: Underground OP: Open Pit

      NOTES:

      1. Chart data, including "full costs" and UxC's categorization of

        production cost "tiers", have been derived from UxC's estimates of worldwide production costs from the Uranium Production Cost Study dated Aug. 2025.

      2. For Phoenix and Gryphon, see the Wheeler River Technical Report titled "NI 43-101 Technical Report on the Wheeler River Project, Athabasca Basin, Saskatchewan, Canada" dated Jun. 23, 2023 and Denison's news release on Jun. 26, 2023. Phoenix all-in costs reflects updated initial

        capital, refer to Denison's news release dated Jan. 2, 2026

      3. For THT/Waterbury, refer to the Waterbury Lake Technical Report titled "Preliminary Economic Assessment for the Tthe Heldeth Túé (THT) (J Zone) Deposit, Waterbury Lake Property, Northern Saskatchewan, Canada" dated Oct. 30, 2020 and Denison's news release on Nov. 17, 2020.

      4. For Midwest, refer to Denison's news release dated Aug. 6, 2025.

      5



      Large land position in the infrastructure-rich

      eastern portion of the Athabasca Basin(1)

Midwest (Denison 25.17%)

Waterbury Lake (Denison 70.55%)

McClean Lake Mill

(Denison 22.5%)

McClean Lake North

(Denison 22.5%)

Moon Lake South (Denison 75%)

All Season Highway

/ Haul Road

Waterfound (Denison 24.68%)(2)

Johnston Lake (Denison 100%)

McArthur River Mine

Wheeler River (Denison 95%)(2)

Provincial Power Grid

Key Lake Mill

Rabbit Lake Mill

Cigar Lake Mine

NOTES:

  1. Denison direct land position shown as of Sept. 30, 2025 and pro forma for the completed transaction with Skyharbour Resources. For more information see news release dated Dec. 17, 2025.

  2. Denison's effective interest in Wheeler River includes 90% held directly and 5% held indirectly through its 50% ownership of JCU (Canada) Exploration Company, Limited.

    6



    Robust Balance Sheet with ~CAD$718M(1)in cash, physical uranium and investments

    1.9M lbs U3O8

    in holdings of physical uranium(1)

    Market value ~CAD$217M (US$82.00/lb U3O8)(1) Acquired at average cost of USD$29.70/lb U3O8(1)

    Long-term holding expected to support project

    financing for flagship Wheeler River Project(2)

    All material received and held in licenced North American storage facilities (Cameco + ConverDyn)

    CAD$471M

    in

    cash and cash equivalents(1)

    CAD$30M

    investments in

    uranium

    equities and convertibles held by Denison(3)

    USD$345M

    issuance of

    2031

    convertible notes

    Capped call increases effective conversion premium to 100% of share price on the pricing date of the offering(4,5)

    Balance sheet position, relative to initial project capex for flagship development asset (Phoenix), is strong among uranium development-stage peers

    NOTES:

    (1) As of Sept. 30, 2025. For additional details see financial statements and MD&A for the period ended Sept. 30, 2025.

    (2) See Denison's news

    releases dated Mar. 15, 2021,

    2021.

    Mar. 22, 2021, and Apr. 1,

  3. As of Sept. 30, 2025, for statements and MD&A for the

    additional details see financial

    includes investments in

    period ended Sept. 30, 2025;

    uranium equities and

    by Denison.

    convertible debentures held

  4. Gross proceeds of convertible note offering. For more details please see Denison's press release dated Aug. 15, 2025.

  5. The Company has no other

debt drawn as of Sept. 30,

as more fully described in the

2025; however, the company has a letters of credit facility in place that is used to secure reclamation letters of credit,

MD&A for the period ended

financial statements and Sept. 30, 2025.

7



95% owned flagship Wheeler River project(1)(2)

Potential to deliver meaningful production when the market needs It

Two

premier and viable

development assets

Phoenix - In-Situ Recovery

("ISR") operation with on-site processing to finished U3O8

Gryphon - contributes additional production via conventional underground mining with assumed toll milling at 22.5% Denison owned McClean Lake mill

~16.5 years

Aggregate operating

Mine life(3)

CAD$600M

Estimated (100% basis)

Initial CAPEX (Phoenix)(7)

Construction imminent at

Phoenix(4)

Final Investment Decision ('FID') made and commencement of construction planned for March 2026(4)

Final regulatory approvals to commence construction received in February 2026(5,6)

Total engineering ~87% complete(7)

Rigorous multi-year technical de-risking

2022 Feasibility Field Test successfully recovered uranium bearing solution(8)

Gryphon expected to be funded from internal cash flows

Phoenix cash flow expected to fund Gryphon CAPEX

Project benefits from existing or planned Denison-owned infrastructure

106.4M lbs U3O8

(combined, 100% basis)(1)

Proven & Probable Reserves

~2-year Construction

Planned construction period

for Phoenix prior to first production(4)

Mid-2028

Planned Production Start-up

for Phoenix(4)

NOTES:

(1) Refer to the Wheeler

Report on the Wheeler

River Technical Report

titled "NI 43-101 Technical

River Project, Athabasca

Canada" dated Jun.

(2) Denison increased its

Basin, Saskatchewan, 23, 2023.

effective interest in

Wheeler River as part of

the acquisition of 50% of

Company, Limited. See

JCU (Canada) Exploration

Denison's news release

dated Aug. 3, 2021.

  1. Reflects 10-year mine life estimated for Phoenix and 6.5-year mine life

    estimated for Gryphon.

  2. See news release dated

    Feb. 24, 2026.

  3. See news release dated

    Feb 19, 2026.

  4. See news release dated

Aug. 5, 2025.

(7) See news release

dated Jan. 2, 2026.

dated Oct. 17, 2022 and

(8) See news releases Nov. 22, 2022.

8



Phoenix In-Situ Recovery ("ISR") Feasibility Study (2023)(1):

Reflects rigour of multi-year technical de-risking and delivers impressive economic results

#1 Non-Precious Mining Development Project

in the World(3)

70.5M

lbs U3O8

@

11.4%

U3O8

Measured & Indicated Mineral Resources

(280,200 tonnes,

100% basis)

One of the highest-grade undeveloped uranium deposits globally

C$1.57B

estimated

Base-case post-tax NPV8% (100% basis)(4)

C$600M

Updated 2026

Initial CAPEX(2)

(100% basis)

73%

estimated

Base-case post-tax IRR(2,4)

2.6 to 1

Base-case

post-tax NPV to initial capital cost ratio(2)

Including…

56.3M

lbs U3O8

@ 46.0% U3O8

M&I mineral resources for Zone A high-grade domain

US$6.28

/ lbs U3O8

average

Cash Operating Costs

(C$8.51/lb U3O8)

US$18.41

/ lbs U3O8

average

All-in Cost(5)

(C$24.92/lb U3O8)



PHOTOS:

Phoenix Feasibility Field Test (FFT) facilities during operations in 2022.

NOTES:

  1. See the Wheeler River Technical Report titled "NI 43-101 Technical Report on

    the Wheeler River Project, Athabasca Basin, Saskatchewan,

    Canada" dated Jun. 23, 2023.

  2. See news release dated Jan. 2, 2026.

  3. Mining Journal Project Pipeline Handbook 2025.

  4. NPV and IRR are calculated to the start of construction activities for the Phoenix operation and excludes $100 million in pre-FID expenditures. Post-tax NPV, IRR and payback period are based on the "adjusted Post-tax" scenario, which includes the benefit of entity level tax attributes which are expected to be available and used to reduce taxable income from the Phoenix operation. See Jan. 2, 2026 press release for further details.

  5. All-in cost is estimated on a pre-tax basis and includes all project operating costs, capital costs post-FID, and decommissioning costs divided by the estimated number of pounds U3O8to be produced. Includes updated initial capital costs (2026). See Wheeler River Technical Report and Denison's news release dated Jan. 2 2026 for details.

9





Phoenix ISR Feasibility Study (2023) with 2026 Capex Update(1,2):

Optimized production profile based on detailed ISR mine planning efforts

56.7 million lbs U3O8 in proven and

probable reserves (219,000 tonnes at 11.7% U3O8)

First production targeted by mid 2028(3)

Planned ~2-year construction period

Robust economics

2026 Capex Update reflects inflation + construction ready project plans(2)



Assumptions / Results(1,2)

Base Case

$100/lb Case(2)

Selling price / lb U3O8

US$68.89-US$78.36

US$100.00

USD:CAD FX Rate

1.35

1.35

Post-tax NPV (2,4)

8%

(100%)

$1.57 billion

$2.35 billion

Change from 2023 FS

+1%

+51%

Post-tax payback

period(2,5)

~12 months

~10 months

Post-tax IRR(2,4)

73%

94%

NOTES: (1) Refer to the Wheeler River Technical Report titled "NI 43-101 Technical Report on the Wheeler River Project, Athabasca

Basin, Saskatchewan, Canada" dated Jun. 23, 2023; (2) Refer to the press release titled "Denison Reports Readiness to Commence Construction of Flagship Phoenix ISR Project and Provides Capital Cost Update" dated Jan. 2, 2026; (3) See press release Feb. 24, 2026; (4) NPV and IRR are calculated to the start of construction activities for the Phoenix operation and excludes $100 million in pre-FID expenditures; (5) Payback period

is stated as number of months to payback from the start of uranium production. 10

Phoenix Construction to Commence March 2026

De-risking complete and project is construction-ready

Significant

De-risking and Engineering to Position for Execution

  • High-grade, low-cost project justified technical studies and extensive test work, detailed engineering, permitting + team building during period prior to improved uranium market

  • Total engineering ~87% complete, including most scopes planned for the first year of construction at 100% total engineering(1,2)

  • Grid power available, with new SaskPower line completed to Phoenix(3)

  • Construction management contract awarded to Wood Canada Limited(4)

Leading Permitting & Community Engagement

  • Final Federal regulatory approval received to construct the Phoenix ISR Uranium Mine, with CNSC approval of the EA, and Licence to Prepare Site and Construct a Mine and Mill (5)

  • Received Saskatchewan EA approval for Phoenix, harmonized with federal EA and CNSC approval(5)

  • Multiple impact-benefit type agreements with Indigenous nations and northern communities, plus leading engagement practices(7)

    Advanced Procurement & Construction Mobilization

  • Teams Mobilizing to Begin Construction with the procurement process for planned 2026 construction nearly complete and remaining contract awards pending and expected in early 2026(2)

  • Final Investment Decision completed with construction anticipated to commence immediately(8)

  • Project timeline on track for targeted first production by mid-2028

    Robust Balance Sheet

  • Strong Balance Sheet to fund construction with ~CAD$718M

    in cash, physical uranium and investments(1)

  • Physical uranium holdings intended to support project financing and offer significant financial flexibility(1)

PHOTO:

View of new SaskPower 138kV Transmission Line to the site of the Future Phoenix Uranium Mine.

NOTES:

  1. For additional details see financial statements and MD&A for the period ended Sept. 30, 2025.

  2. See news release dated Jan. 2, 2026.

  3. See news release dated Jan. 8 2026.

  4. See news release dated Feb. 17, 2026

  5. See news release

    dated Feb. 19, 2026

  6. See news releases dated Aug. 5, 2025.

  7. See news releases dated Sept. 27, 2023, Jul.

    11, 2024, and Oct. 20,

    2022, and MD&A for the period ended Dec. 31,

    Commercial Strategy Aligned with Project Financing Objectives and Asset Base

    • Active engagement with future customers for potential commercial contracting

    • Multiple sources of supply is a differentiator: Physical U3O8, McClean Lake North production, & future Phoenix production

      2022.

  8. See news releases

dated Feb, 24, 2026.

11



Gryphon Underground ("UG") Pre-Feasibility Study Update (2023):

Provides Denison with additional source of low-cost production to reinvest Phoenix cash flows(1)

61.9M

lbs U3O8@

1.7%

U3O8

Indicated Mineral

Resources

(1,643,000 tonnes,

100% basis)

Moderate grade allows low-cost conventional UG mining approach

C$864M

estimated

Base-case after-tax NPV8% (100% basis)(2)

C$737M

estimated

Initial CAPEX

(100% basis)

37.6%

estimated

Base-case after-tax IRR(2)

2023 PFS

Update

Scope limited to cost update and minor schedule optimization

Plus…

1.9M

lbs U3O8

Inferred mineral resources

(73,000 tonnes @

1.2% U3O8, 100% basis)

US$12.75

/ lbs U3O8

US$25.47

/ lbs U3O8

average

average

Cash Operating Costs

All-in Cost(3)

(C$17.27/lb U3O8)

(C$34.50/lb U3O8)



PHOTO:

View inside the SX circuit at Denison's 22.5% owned McClean Lake mill, which is assumed to toll mill production from the Gryphon UG operation.

NOTES:

  1. See the Wheeler River Technical Report titled "NI 43-101 Technical Report on the Wheeler River Project, Athabasca Basin, Saskatchewan, Canada" dated Jun. 23, 2023.

  2. NPV and IRR are calculated to the start of pre-production activities for the Gryphon operation.

  3. All-in cost is estimated on a pre-tax basis and includes all project operating costs, capital costs post-FID, and decommissioning costs divided by the estimated number of pounds U3O8to be produced. See Wheeler River Technical Report and Denison's news release dated Jun. 26, 2023 for details.

12





Gryphon UG Pre-Feasibility Study Update (2023)(1):

Capital and operating costs updated from 2018 PFS + minor scheduling optimizations

49.7 million lbs U3O8 in probable reserves (1,275,000 tonnes at 1.8% U3O8)

Payback period under 2-years

for pre- and post-tax base-case scenarios

Benefits from existing or planned Denison-owned infrastructure



Assumptions / Results(1)

Base Case

Selling price / lb U3O8

US$75

USD:CAD FX Rate

1.35

Pre-tax NPV8%(2)(4) (100%)

$1.43 billion

Change from 2018 PFS

+148%

Pre-tax payback period(3)(5)

~20 months

Pre-tax IRR(2)(6)

41.4%

NOTES: (1) Refer to the Wheeler River Technical Report titled "NI 43-101 Technical Report on the Wheeler River Project, Athabasca Basin, Saskatchewan, Canada" dated Jun. 23, 2023; (2) NPV and IRR are calculated to the start of construction activities for the Gryphon operation, and excludes $56.5 million in pre-FID expenditures; (3) Payback period is stated as number of months to payback from the start of uranium production; (4) Post-tax NPV is estimated to be $864.2 million in the Base Case; (5) Post-tax payback period is estimated to be 23 months in the Base-Case; (6) Post-tax IRR is estimated to be 37.6% in the Base Case.

13

22.5% Denison-owned McClean Lake Mill:

Strategic asset uniquely positioned to support new sources of supply from JV owners

~12%

of global uranium production(1)

2025 operating production of

19.1M lbs U3O8

from Cigar Lake under toll milling agreement(3)

24M

lbs U3O8

Licensed annual mill capacity(2)

6M

lbs U3O8

Excess licensed mill capacity

10-Year

CNSC Operating

License(2)

Renewed in 2017 for operations up to June 30, 2027

Orano

Canada Inc.

French nuclear giant serves as site operator and is owner of 77.5% interest

750km

north of

Saskatoon(4)

Accessible by road over all-weather highways and by air via Points North

+50M

lbs U3O8

Historic uranium production from mined McClean Lake deposits (JEB + Sue A, B, C, & E)(4)

TMF

Expansion

Approved(2)

CNSC approval obtained to increase tailings capacity



PHOTO:

Aerial view of Denison's 22.5% owned McClean Lake mill facility.

NOTES:

  1. Per UxC's Q4' 2025

    Uranium Market Outlook and Cameco's management's discussion and analysis dated Feb. 13, 2026.

  2. See Denison's news release dated Jan. 19, 2022.

  3. Denison monetized its share of tolling revenues from the Cigar Lake toll milling agreement. See Denison's news releases dated Feb. 1, 2017 and

    Feb. 13, 2017. Please also refer to Denison's current Annual Information Form and Financial Statements and Management, Discussion and Analysis for additional details related to the toll milling agreement.

  4. See Denison's current Annual Information Form for additional details regarding the McClean Lake mill facility.

14



22.5% Denison-owned McClean Lake Mine:

Mining restart achieved via SABRE mining method at McClean North deposit

SABRE

Patented &

Operating

Successful 5-year test mining program for

"Surface Access Borehole Resource Extraction" (SABRE) mining method

SABRE is property of McClean Lake JV (MLJV) with patent issued in 2016

Successful Mining Start in June 2025

MLJV (100%) production of ~85,000 lbs U3O8in

Q3'2025 at operating cash costs of ~US$19/lb(1)

17.8M

lbs U3O8 Indicated Mineral Resources(2) (100% basis)

Combined 374,900

tonnes @ 2.2% U3O8

7.6M

lbs U3O8 Inferred Mineral Resources(2) (100% basis)

Combined 510,900 tonnes

@ 0.68% U3O8

2025

Activities

Mining activities for 2025 are planned to include eight SABRE cavities(3)

Orano

Canada Inc.

French nuclear giant serves as project operator and is owner of 77.5% interest

8.67% U3O8

over 13.5 metres

Discovered "new" mineralization at McClean South(4) in 2021 + expanded footprint in 2022 and 2025(5)



PHOTO:

2021 SABRE test mining program in action, with view of specialized mining pipes in inset photo.

NOTES:

  1. As of Sept. 30, 2025, 100% basis. See Denison's financial statements and MD&A for the three months ended Sept. 30, 2025 for details.

  2. See Denison's current AIF for additional details regarding the McClean Lake deposits and SABRE mining method.

  3. See Denison's financial statements and MD&A for the three months ended Sept. 30, 2025 for details.

  4. See Denison's current

    AIF for additional details.

  5. See Denison's news releases dated Sept. 8, 2022 and Jul. 21, 2025.

15



25.17% Denison-owned Midwest Property:

In-Situ Recovery PEA for Midwest Main leverages high-grades & proximity to McClean mill(1)

38.7M

lbs U3O8@

3.5%

U3O8

Indicated Mineral

Resources (100%

basis, 510,000 tonnes)

Plus…

12.6M

lbs U3O8

Inferred mineral

resources

(100% basis, 905,000

tonnes @ 0.64% U3O8)

C$965M

estimated

Base-case after-tax NPV8% (100% basis)(3)

C$254M

estimated

Initial CAPEX

(100% basis)

82.7%

estimated

Base-case after-tax IRR(3)

3.8 to 1

Base-case post-tax NPV

to initial capital

cost ratio

Approved

EIS as Open Pit

with processing at

McClean Lake

CNSC approved final EIS in 2012(2)

US$11.69

/ lbs U3O8

average

Cash Operating Costs

(C$15.78/lb U3O8)

US$25.78

/ lbs U3O8

average

All-in Cost(4)

(C$34.80/lb U3O8)



PHOTO:

Aerial view of Midwest Project.

NOTES:

  1. See Denison's news release dated Aug. 6, 2025.

  2. See Denison's current Annual Information Form for additional details regarding the Midwest project.

  3. NPV and IRR are calculated to the start of construction activities for the Midwest project and excludes the C$16.8M in pre-FID expenditures.

  4. All-in cost is estimated on a pre-tax basis and includes all project operating costs, capital costs post-FID, and decommissioning costs divided by the estimated number of pounds U3O8to be produced.

16





Midwest ISR Preliminary Economic Assessment (2025)(1):

Demonstrates economic and technical potential at the Midwest Main deposit

7,000,000

6,000,000

Pounds U3O8per year

5,000,000

4,000,000

3,000,000

Midwest mine production per year



37.4 million lbs U3O8 in potentially mineable

resources (650,000 tonnes at 2.6% U3O8)

Evaluation of MLJV's SABRE mining method also being advanced in parallel

Payback period under 1 year

for pre- and post-tax base-case scenarios

2,000,000

1,000,000

-

Calendar Years

Production lbs U3O8

1 2 3 4 5 6 7

Assumptions / Results(1)

Base Case

Selling price / lb U3O8

US$80

USD:CAD FX Rate

1.35

Pre-tax NPV8%(2)(4) (100%)

$1.62 billion

Pre-tax payback period(3)(5)

~6 months

Pre-tax IRR(2)(6)

111.1%

6.1M 6.1M 6.1M 6.1M 6.1M 6.1M 0.8M

NOTES: (1) Refer to Denison's news release dated Aug. 6, 2025; (2) NPV and IRR are calculated to the start of construction activities for the Midwest project and excludes $16.8 million in pre-FID expenditures; (3) Payback period is stated as number of months to payback from the start of uranium production; (4) Post-tax NPV is estimated to be $964.7.2 million in the Base Case; (5) Post-tax payback period is estimated to be ~9 months in the Base-Case; (6) Post-tax IRR is estimated to be 82.7% in the Base Case.

17

70.55% owned Waterbury Lake project:

PEA (2020) shows potential for ISR to change uranium mining landscape in Canada(1)

ISR

Mining

Method

Tthe Heldeth Túé ("THT") deposit (formerly J Zone) designed as a low-cost

ISR operation with freeze wall design

Uranium Bearing Solution ("UBS") to be transported by truck to McClean Lake mill for toll processing

Minimal site infrastructure

Successful 2023 ISR field test(2)

1.6M lbs lbs U3O8 Average annual production over 6 years

(100% basis)

C$112M

estimated

Initial

CAPEX

(100% basis)

US$12.23

/ lbs U3O8

average

Cash Operating Costs

(C$16.27/lb U3O8)

US$24.93

/ lbs U3O8

average

All-in Cost(3)

(C$33.16/lb U3O8)

Partnership

with consortium led by state-owned nuclear company Korea Hydro Nuclear Power

("KHNP")

C$265M

estimated

Pre-Tax NPV8%

(100% basis)

US$65/lb U3O8selling price

(see note 4, 5)

50.0%

estimated

Pre-Tax IRR

US$65/lb U3O8selling price

(see note 4, 6)



PHOTOS:

Aerial rendering of surface facilities for the THT ISR operation

NOTES:

  1. Refer to the Waterbury Lake Technical Report titled "Preliminary Economic Assessment for the Tthe Heldeth Túé (J Zone) Deposit, Waterbury Lake Property, Northern Saskatchewan, Canada" dated Oct. 30, 2020.

  2. See Denison's news

release dated Nov. 6, 2023

  1. All-in cost is estimated on a pre-tax basis and includes all project operating costs and capital costs divided by the estimated number of finished pounds U3O8produced.

  2. NPV and IRR are calculated based on assessed "high-case" uranium price, to the start of pre-production activities.

  3. Post-tax NPV attributable to Denison's then 66.90% interest is estimated to be between

    $72 million (base-case) and $109 million ($65/lb high-case).

  4. Post-tax IRR attributable to Denison's then 66.90% interest is estimated to be between 30.4% (base-case) and

38.9% ($65/lb high-case).

18





Team Denison

Strengthening exposure to exploration upside through strategic investment



TSX-V: COSA

  • In January 2025, Denison and Cosa completed an agreement to form JVs on certain properties(1,2), resulting in Cosa acquiring 70% of Murphy Lake North, Darby and Packrat + requirement to spend C$6.5M on exploration on these properties

  • Cosa has a proven exploration + management team, involved in multiple discoveries, including IsoEnergy's Hurricane Deposit

  • 180,000 hectares in the Athabasca Basin, including 10 wholly-owned properties + 3 joint ventures with Denison

  • Denison owns ~18.8% of Cosa's shares outstanding as of September 30, 2025(9)

  1. See Denison's news

    release dated Nov. 27, 2024.

  2. For more information, see Cosa news release dated Jan. 14, 2025.

More information:

cosaresources.ca



TSX-V: SYH

  • In December 2025, Denison and Skyharbour formed four joint ventures from Skyharbour's Russell Lake Uranium Project

    • Large Russell Lake property situated directly adjacent to Wheeler River(3)

    • New JVs (Denison's initial interest): Wheeler Inliers (70%), Wheeler North (49%), Getty East (30%), Russell Lake (RL) (20%)

    • Denison and Skyharbour also entered into earn-in option agreements under which Denison can increase ownership in both the Wheeler North and Getty East JVs up to 70%.

    • Transaction strengthens Denison's foothold immediately east and north of its flagship Wheeler River Property

  • Denison owns ~ 5.7% of Skyharbour's shares outstanding as of September 30, 2025(9)

(3) See Denison's news releases dated Nov. 17, 2025 and Dec. 17, 2025.

More information:

skyharbourltd.com



Nasdaq: FMST CSE: FAT

  • In September 2024, Denison and Foremost announced an option agreement(4), resulting in:

    • Option to acquire up a 70% interest in 10 properties in the Athabasca Basin from Denison, which cover >330,000 ha

    • Foremost is required to spend C$20.0m in exploration to earn the full interest in the properties

  • Using Dahrouge Geological Consulting, a premier exploration and discovery consultant, to conduct exploration programs

  • Denison owns ~19.5% of Foremost's shares outstanding as of September 30, 2025(9)

(4) See Denison's news release dated Sept. 24, 2024.

More information:

foremostcleanenergy.com



TSX-V: FUU

  • In 2023, Denison completed a C$15m strategic investment in F3 uranium with unsecured convertible debentures(5)

  • F3 owns Patterson Lake North ("PLN"), Minto and Broach projects located in the Western Athabasca Basin

  • The PLN property includes the JR Zone deposit, estimated to contain 11.8M lbs U3O8at 4.39% U3O8Indicated Resources(6)

    • PLN property also host to the uranium mineralized Tetra Zone(7)

  • In 2024, F3 spun out a portfolio of 16 early-stage assets to create F4 Uranium(8)

    • Denison to receive one-tenth ( 1/10th ) of a common share of F4 for every share of F3 if convert is exercised

  1. See Denison's news

    release dated Oct. 6, 2023.

  2. See F3's news release

    dated Dec. 22, 2025

  3. See F3 news release dated Dec. 15, 2025

  4. See F3 news release dated Aug. 16, 2024 More information: f3uranium.com

(9) As of September 30, 2025. See Denison's Q3 2025 MD&As for more information. 19

Environmental, Social, Governance & Indigenous (ESG+I)

Fundamental considerations driving Denison's operations



Comprehensive ESG Reporting

Designed to address GRI, SASB, TCFD + other global frameworks

Top 115 in Canada

Leading Governance Practices

Denison recognized by Globe & Mail "Board Games" as top uranium emerging producer / developer for corporate governance practices & disclosure in its assessment of leading companies and trusts

included in Canada's benchmark S&P/TSX Composite Index(2, 3)

Board approved

Indigenous Peoples Policy

First-in-sector policy reflecting Denison's commitment to take action towards advancing reconciliation with Indigenous peoples in Canada(1)

Multiple Indigenous Agreements

Shared Prosperity Agreement with English River First Nation(4)

Mutual Benefits and Community Benefit Agreements with Kineepik Métis Local #9, and the Village of Pinehouse(5)

Regional Mutual Benefits Agreement with the Ya'thi Néné Land and Resource Office and the Regional Athabasca Communities(6)**

Impact Benefit Agreement and Exploration Agreement

with Métis Nation - Saskatchewan(7)

Authentic Social Programs

Denison's community / social investment program targets community-based initiatives

Strong EHS&S Culture & Results

One lost time injury across all operations and no significant environmental events for 2024(8)

PHOTO:

Highlights of the Elders of Sakitawak's market garden in Ile a la Crosse, a community-based initiative sponsored by Denison.

NOTES:

  1. See news release dated Dec. 2, 2021.

  2. For more information: https://www.theglobeand mail.com/business/career s/management/board-games/article-canada-corporate-boards-ranking-2025/

  3. See Denison's news release dated Mar. 15, 2021.

  4. See news release dated Sep. 27, 2023.

  5. See news release dated Jul. 11, 2024.

  6. See news release dated Dec. 1,2025.

  7. See news release dated Dec. 4 2025.

  8. See Denison's AIF for additional details.

**includes the Hatchet Lake Denesułiné First Nation, Black Lake Denesułiné First Nation, Fond du Lac Denesułiné First Nation, the Northern Hamlet of Stony Rapids, the Northern Settlement of Uranium City, the Northern Settlement

of Wollaston Lake, and the Northern Settlement of Camsell Portage

20