Corporate Update
March 2026
Uranium Development & Exploration
The Athabasca Basin, Northern Saskatchewan
#1 Non-Precious Mining
Development Project
in the World
Key Investment Highlights(1):
Advanced Athabasca Basin uranium developer with unique asset mix
Portfolio of four low-cost uranium development projectsPhoenix, Gryphon, Midwest and THT/Waterbury all projected within UxC's "First Tier" of global assets(2)
#1 Phoenix combines lowest-cost mining method with Athabasca Basin high-gradesRanked #1 non-precious mining development project globally in 2025 by Mining Journal Intelligence
Construction planned to commence in March 2026 for flagship In-Situ Recovery ('ISR') mine(3)
Final Investment Decision made shortly after regulatory approvals received to commence construction(3,4)
Technical de-risking completed; C$47M spent on long-lead procurement(5,6)
First production targeted by mid 2028(6)
Ownership interest in strategic regional asset with McClean Lake mill and producing mineExcess licensed milling capacity, with approval for expanded tailings management facility
2025 mining restart at McClean North deposit announced by Orano Canada
High-potential exploration portfolio and interests in key mines / projects operated by "majors"Large Athabasca Basin exploration portfolio, including Moon Lake South and Johnston Lake properties
Minority interests in Cameco-JCU's Millennium project and Orano-JCU's Kiggavik project
Strong balance sheet with ~C$718M in cash, physical uranium and investments(7)Denison's financial and liquid assets on hand, relative to initial capex(6) for the flagship Phoenix development project
(C$570M for Denison's effective 95% interest) puts the company in a strong position
Focused on the infrastructure-rich Eastern Athabasca Basin in Saskatchewan, Canada Nuclear energy commitments: 30+ nations pledge to triple nuclear energy capacity by 2050(8)3
NOTES: (1) See supporting slides for details. (2) UxC's Uranium Production Cost Study dated Aug. 2025. (3) See news release dated Feb. 24, 2026. (4) See news release dated Feb. 19th, 2026. (5) The amount spent on long lead procurement is a non-GAAP measure and reflects spend on items reported in property plant and equipment as of Nov. 30, 2025. (6) See news release dated Jan. 2, 2026. (7) As of Sep. 30, 2025. For additional details see financial statements and MD&A for the period ended Sep. 30, 2025. (8) World Nuclear News article dated Nov. 17, 2025.
Multi-asset leverage to uranium market from advanced + diversified Athabasca Basin asset base
95%(1) effective interest in Flagship Wheeler River project Consisting of two projects: Construction-stage Phoenix, Development-stage Gryphon Phoenix construction planned to begin in March 2026(2) Final Investment Decision made + regulatory approvals received to commence construction (2,3) Largest Mineral Reserves of undeveloped uranium projects in the infrastructure rich eastern Athabasca Basin | 22.5% interest in Strategic McClean Lake Uranium mill & mines ~12% of global uranium production processed through mill(4) Mining restarted June 2025 using SABRE mining at McClean North deposit(5) Excess licensed milling capacity | 25.17% interest in High-grade Midwest project close to McClean mill 2025 Preliminary Economic Assessment ('PEA') for ISR mining at Midwest Main deposit(6) High-grades and close proximity to the McClean Lake mill support robust PEA economics Also being evaluated for potential development with SABRE mining method | 70.55% interest in Well-situated Waterbury Lake project PEA stage development project for ISR mining proximal to McClean mill(7) Tthe Heldeth Túé ('THT') deposit highlights potential for future development project pipeline(7) Successful completion of 2023 ISR field test(8) |
50% ownership of JCU(9), adding portfolio of interests including sizeable share of development-stage assets operated by "majors" JCU holds various Athabasca Basin exploration project interests, plus 30.099% in Millennium (Cameco) and 33.8118% in Kiggavik (Orano) | ~457,000 hectares of exploration ground(10) | ||
NOTES:.
Denison's effective interest
held directly and 5% held
in Wheeler River includes 90%
indirectly through its 50%
Exploration Company,
ownership of JCU (Canada) Limited.
Feb. 24, 2026.
See news release dated
(4) Derived from UxC's
(3) Phoenix Project - See news
release dated Feb 19, 2026 Uranium Market Outlook
dated Q4'2025
(5) See news release dated Jul. 17, 2025.
(6) See news release dated
Aug. 6, 2025.
(7) Refer to the Waterbury
Lake Technical Report titled
Assessment for the Tthe
"Preliminary Economic
Northern Saskatchewan,
Heldeth Túé (J Zone) Deposit,
Waterbury Lake Property,
Canada" dated Oct. 30, 2020.
See news release dated
Nov. 6, 2023.
See news release dated
Aug. 3, 2021.
(10) Denison direct land
positions held by JCU.
position shown as of Dec. 17, 2025; excludes the land
4
Denison's Development Portfolio Projects:Four assets amongst the lowest all-in cost assets of UxC's First Tier
Sample of Global Production Costs - August 2025(1)(2)(3)(4)
Planned and Producing Operations (with Mining Method)
UxC's "First Tier"
(includes lowest-cost projects with full costs up to ~US$37.50/lb U3O8)
"Second Tier"
(up to ~US$50.01/lb U3O8)
"Third/Fourth Tier"
(up O )
to ~US$97.51/lb U3
8
$18.41 (2026)(2)
$24.93 (2020)
$25.47 (2023)
$25.78
(2025)
$80
All-in / Full Costs - USD$/lb U3O8
$70
$60
$50
$40
$30
ISR ISR ISR
ISR UG
UG
UG UG ISR
UG ISR UG
ISR
$20
UG OP OP OP ISR ISR ISR OP
OP
$10
$0
Denison/Canada (Technical Reports)Denison/Canada (UxC Est.)
Canada
Kazakhstan
Australia
Africa
ISR: In-Situ Recovery UG: Underground OP: Open Pit
NOTES:
Chart data, including "full costs" and UxC's categorization of
production cost "tiers", have been derived from UxC's estimates of worldwide production costs from the Uranium Production Cost Study dated Aug. 2025.
For Phoenix and Gryphon, see the Wheeler River Technical Report titled "NI 43-101 Technical Report on the Wheeler River Project, Athabasca Basin, Saskatchewan, Canada" dated Jun. 23, 2023 and Denison's news release on Jun. 26, 2023. Phoenix all-in costs reflects updated initial
capital, refer to Denison's news release dated Jan. 2, 2026
For THT/Waterbury, refer to the Waterbury Lake Technical Report titled "Preliminary Economic Assessment for the Tthe Heldeth Túé (THT) (J Zone) Deposit, Waterbury Lake Property, Northern Saskatchewan, Canada" dated Oct. 30, 2020 and Denison's news release on Nov. 17, 2020.
For Midwest, refer to Denison's news release dated Aug. 6, 2025.
5
Large land position in the infrastructure-rich
eastern portion of the Athabasca Basin(1)
Midwest (Denison 25.17%)
Waterbury Lake (Denison 70.55%)
McClean Lake Mill
(Denison 22.5%)
McClean Lake North
(Denison 22.5%)
Moon Lake South (Denison 75%)
All Season Highway
/ Haul Road
Waterfound (Denison 24.68%)(2)
Johnston Lake (Denison 100%)
McArthur River Mine
Wheeler River (Denison 95%)(2)
Provincial Power Grid
Key Lake Mill
Rabbit Lake Mill
Cigar Lake Mine
NOTES:
Denison direct land position shown as of Sept. 30, 2025 and pro forma for the completed transaction with Skyharbour Resources. For more information see news release dated Dec. 17, 2025.
Denison's effective interest in Wheeler River includes 90% held directly and 5% held indirectly through its 50% ownership of JCU (Canada) Exploration Company, Limited.
6
Robust Balance Sheet with ~CAD$718M(1)in cash, physical uranium and investments
1.9M lbs U3O8
in holdings of physical uranium(1)
Market value ~CAD$217M (US$82.00/lb U3O8)(1) Acquired at average cost of USD$29.70/lb U3O8(1)
Long-term holding expected to support project
financing for flagship Wheeler River Project(2)
All material received and held in licenced North American storage facilities (Cameco + ConverDyn)
CAD$471M
in
cash and cash equivalents(1)
CAD$30M
investments in
uranium
equities and convertibles held by Denison(3)
USD$345M
issuance of
2031
convertible notes
Capped call increases effective conversion premium to 100% of share price on the pricing date of the offering(4,5)
Balance sheet position, relative to initial project capex for flagship development asset (Phoenix), is strong among uranium development-stage peers
NOTES:
(1) As of Sept. 30, 2025. For additional details see financial statements and MD&A for the period ended Sept. 30, 2025.
(2) See Denison's news
releases dated Mar. 15, 2021,
2021.
Mar. 22, 2021, and Apr. 1,
As of Sept. 30, 2025, for statements and MD&A for the
additional details see financial
includes investments in
period ended Sept. 30, 2025;
uranium equities and
by Denison.
convertible debentures held
Gross proceeds of convertible note offering. For more details please see Denison's press release dated Aug. 15, 2025.
The Company has no other
debt drawn as of Sept. 30,
as more fully described in the
2025; however, the company has a letters of credit facility in place that is used to secure reclamation letters of credit,
MD&A for the period ended
financial statements and Sept. 30, 2025.
7
95% owned flagship Wheeler River project(1)(2)
Potential to deliver meaningful production when the market needs It
Two premier and viable development assets Phoenix - In-Situ Recovery ("ISR") operation with on-site processing to finished U3O8 Gryphon - contributes additional production via conventional underground mining with assumed toll milling at 22.5% Denison owned McClean Lake mill | ~16.5 years Aggregate operating Mine life(3) | CAD$600M Estimated (100% basis) Initial CAPEX (Phoenix)(7) |
Construction imminent at Phoenix(4) Final Investment Decision ('FID') made and commencement of construction planned for March 2026(4) Final regulatory approvals to commence construction received in February 2026(5,6) Total engineering ~87% complete(7) Rigorous multi-year technical de-risking 2022 Feasibility Field Test successfully recovered uranium bearing solution(8) | Gryphon expected to be funded from internal cash flows Phoenix cash flow expected to fund Gryphon CAPEX Project benefits from existing or planned Denison-owned infrastructure | |
106.4M lbs U3O8 (combined, 100% basis)(1) Proven & Probable Reserves | ~2-year Construction Planned construction period for Phoenix prior to first production(4) | Mid-2028 Planned Production Start-up for Phoenix(4) |
NOTES:
(1) Refer to the Wheeler
Report on the Wheeler
River Technical Report
titled "NI 43-101 Technical
River Project, Athabasca
Canada" dated Jun.
(2) Denison increased its
Basin, Saskatchewan, 23, 2023.
effective interest in
Wheeler River as part of
the acquisition of 50% of
Company, Limited. See
JCU (Canada) Exploration
Denison's news release
dated Aug. 3, 2021.
Reflects 10-year mine life estimated for Phoenix and 6.5-year mine life
estimated for Gryphon.
See news release dated
Feb. 24, 2026.
See news release dated
Feb 19, 2026.
See news release dated
Aug. 5, 2025.
(7) See news release
dated Jan. 2, 2026.
dated Oct. 17, 2022 and
(8) See news releases Nov. 22, 2022.
8
Phoenix In-Situ Recovery ("ISR") Feasibility Study (2023)(1):
Reflects rigour of multi-year technical de-risking and delivers impressive economic results
#1 Non-Precious Mining Development Project
in the World(3)
70.5M lbs U3O8 @ 11.4% U3O8 Measured & Indicated Mineral Resources (280,200 tonnes, 100% basis) One of the highest-grade undeveloped uranium deposits globally | C$1.57B estimated Base-case post-tax NPV8% (100% basis)(4) | C$600M Updated 2026 Initial CAPEX(2) (100% basis) |
73% estimated Base-case post-tax IRR(2,4) | 2.6 to 1 Base-case post-tax NPV to initial capital cost ratio(2) | |
Including… 56.3M lbs U3O8 @ 46.0% U3O8 M&I mineral resources for Zone A high-grade domain | US$6.28 / lbs U3O8 average Cash Operating Costs (C$8.51/lb U3O8) | US$18.41 / lbs U3O8 average All-in Cost(5) (C$24.92/lb U3O8) |
PHOTOS:
Phoenix Feasibility Field Test (FFT) facilities during operations in 2022.
NOTES:
See the Wheeler River Technical Report titled "NI 43-101 Technical Report on
the Wheeler River Project, Athabasca Basin, Saskatchewan,
Canada" dated Jun. 23, 2023.
See news release dated Jan. 2, 2026.
Mining Journal Project Pipeline Handbook 2025.
NPV and IRR are calculated to the start of construction activities for the Phoenix operation and excludes $100 million in pre-FID expenditures. Post-tax NPV, IRR and payback period are based on the "adjusted Post-tax" scenario, which includes the benefit of entity level tax attributes which are expected to be available and used to reduce taxable income from the Phoenix operation. See Jan. 2, 2026 press release for further details.
All-in cost is estimated on a pre-tax basis and includes all project operating costs, capital costs post-FID, and decommissioning costs divided by the estimated number of pounds U3O8to be produced. Includes updated initial capital costs (2026). See Wheeler River Technical Report and Denison's news release dated Jan. 2 2026 for details.
9
Phoenix ISR Feasibility Study (2023) with 2026 Capex Update(1,2):
Optimized production profile based on detailed ISR mine planning efforts
56.7 million lbs U3O8 in proven and
probable reserves (219,000 tonnes at 11.7% U3O8)
First production targeted by mid 2028(3)
Planned ~2-year construction period
Robust economics
2026 Capex Update reflects inflation + construction ready project plans(2)
Assumptions / Results(1,2) | Base Case | $100/lb Case(2) |
Selling price / lb U3O8 | US$68.89-US$78.36 | US$100.00 |
USD:CAD FX Rate | 1.35 | 1.35 |
Post-tax NPV (2,4) 8% (100%) | $1.57 billion | $2.35 billion |
Change from 2023 FS | +1% | +51% |
Post-tax payback period(2,5) | ~12 months | ~10 months |
Post-tax IRR(2,4) | 73% | 94% |
NOTES: (1) Refer to the Wheeler River Technical Report titled "NI 43-101 Technical Report on the Wheeler River Project, Athabasca
Basin, Saskatchewan, Canada" dated Jun. 23, 2023; (2) Refer to the press release titled "Denison Reports Readiness to Commence Construction of Flagship Phoenix ISR Project and Provides Capital Cost Update" dated Jan. 2, 2026; (3) See press release Feb. 24, 2026; (4) NPV and IRR are calculated to the start of construction activities for the Phoenix operation and excludes $100 million in pre-FID expenditures; (5) Payback period
is stated as number of months to payback from the start of uranium production. 10
Phoenix Construction to Commence March 2026
De-risking complete and project is construction-ready
Significant
De-risking and Engineering to Position for Execution
High-grade, low-cost project justified technical studies and extensive test work, detailed engineering, permitting + team building during period prior to improved uranium market
Total engineering ~87% complete, including most scopes planned for the first year of construction at 100% total engineering(1,2)
Grid power available, with new SaskPower line completed to Phoenix(3)
Construction management contract awarded to Wood Canada Limited(4)
Leading Permitting & Community Engagement
Final Federal regulatory approval received to construct the Phoenix ISR Uranium Mine, with CNSC approval of the EA, and Licence to Prepare Site and Construct a Mine and Mill (5)
Received Saskatchewan EA approval for Phoenix, harmonized with federal EA and CNSC approval(5)
Multiple impact-benefit type agreements with Indigenous nations and northern communities, plus leading engagement practices(7)
Advanced Procurement & Construction Mobilization
Teams Mobilizing to Begin Construction with the procurement process for planned 2026 construction nearly complete and remaining contract awards pending and expected in early 2026(2)
Final Investment Decision completed with construction anticipated to commence immediately(8)
Project timeline on track for targeted first production by mid-2028
Robust Balance Sheet
Strong Balance Sheet to fund construction with ~CAD$718M
in cash, physical uranium and investments(1)
Physical uranium holdings intended to support project financing and offer significant financial flexibility(1)
PHOTO:
View of new SaskPower 138kV Transmission Line to the site of the Future Phoenix Uranium Mine.
NOTES:
For additional details see financial statements and MD&A for the period ended Sept. 30, 2025.
See news release dated Jan. 2, 2026.
See news release dated Jan. 8 2026.
See news release dated Feb. 17, 2026
See news release
dated Feb. 19, 2026
See news releases dated Aug. 5, 2025.
See news releases dated Sept. 27, 2023, Jul.
11, 2024, and Oct. 20,
2022, and MD&A for the period ended Dec. 31,
Commercial Strategy Aligned with Project Financing Objectives and Asset Base
Active engagement with future customers for potential commercial contracting
Multiple sources of supply is a differentiator: Physical U3O8, McClean Lake North production, & future Phoenix production
2022.
See news releases
dated Feb, 24, 2026.
11
Gryphon Underground ("UG") Pre-Feasibility Study Update (2023):
Provides Denison with additional source of low-cost production to reinvest Phoenix cash flows(1)
61.9M lbs U3O8@ 1.7% U3O8 Indicated Mineral Resources (1,643,000 tonnes, 100% basis) Moderate grade allows low-cost conventional UG mining approach | C$864M estimated Base-case after-tax NPV8% (100% basis)(2) | C$737M estimated Initial CAPEX (100% basis) |
37.6% estimated Base-case after-tax IRR(2) | 2023 PFS Update Scope limited to cost update and minor schedule optimization | |
Plus… 1.9M lbs U3O8 Inferred mineral resources (73,000 tonnes @ 1.2% U3O8, 100% basis) | US$12.75 / lbs U3O8 | US$25.47 / lbs U3O8 |
average | average | |
Cash Operating Costs | All-in Cost(3) | |
(C$17.27/lb U3O8) | (C$34.50/lb U3O8) |
PHOTO:
View inside the SX circuit at Denison's 22.5% owned McClean Lake mill, which is assumed to toll mill production from the Gryphon UG operation.
NOTES:
See the Wheeler River Technical Report titled "NI 43-101 Technical Report on the Wheeler River Project, Athabasca Basin, Saskatchewan, Canada" dated Jun. 23, 2023.
NPV and IRR are calculated to the start of pre-production activities for the Gryphon operation.
All-in cost is estimated on a pre-tax basis and includes all project operating costs, capital costs post-FID, and decommissioning costs divided by the estimated number of pounds U3O8to be produced. See Wheeler River Technical Report and Denison's news release dated Jun. 26, 2023 for details.
12
Gryphon UG Pre-Feasibility Study Update (2023)(1):
Capital and operating costs updated from 2018 PFS + minor scheduling optimizations
49.7 million lbs U3O8 in probable reserves (1,275,000 tonnes at 1.8% U3O8)
Payback period under 2-years
for pre- and post-tax base-case scenarios
Benefits from existing or planned Denison-owned infrastructure
Assumptions / Results(1) | Base Case |
Selling price / lb U3O8 | US$75 |
USD:CAD FX Rate | 1.35 |
Pre-tax NPV8%(2)(4) (100%) | $1.43 billion |
Change from 2018 PFS | +148% |
Pre-tax payback period(3)(5) | ~20 months |
Pre-tax IRR(2)(6) | 41.4% |
NOTES: (1) Refer to the Wheeler River Technical Report titled "NI 43-101 Technical Report on the Wheeler River Project, Athabasca Basin, Saskatchewan, Canada" dated Jun. 23, 2023; (2) NPV and IRR are calculated to the start of construction activities for the Gryphon operation, and excludes $56.5 million in pre-FID expenditures; (3) Payback period is stated as number of months to payback from the start of uranium production; (4) Post-tax NPV is estimated to be $864.2 million in the Base Case; (5) Post-tax payback period is estimated to be 23 months in the Base-Case; (6) Post-tax IRR is estimated to be 37.6% in the Base Case.
13
22.5% Denison-owned McClean Lake Mill:Strategic asset uniquely positioned to support new sources of supply from JV owners
~12% of global uranium production(1) 2025 operating production of 19.1M lbs U3O8 from Cigar Lake under toll milling agreement(3) | 24M lbs U3O8 Licensed annual mill capacity(2) | 6M lbs U3O8 Excess licensed mill capacity |
10-Year CNSC Operating License(2) Renewed in 2017 for operations up to June 30, 2027 | Orano Canada Inc. French nuclear giant serves as site operator and is owner of 77.5% interest | |
750km north of Saskatoon(4) Accessible by road over all-weather highways and by air via Points North | +50M lbs U3O8 Historic uranium production from mined McClean Lake deposits (JEB + Sue A, B, C, & E)(4) | TMF Expansion Approved(2) CNSC approval obtained to increase tailings capacity |
PHOTO:
Aerial view of Denison's 22.5% owned McClean Lake mill facility.
NOTES:
Per UxC's Q4' 2025
Uranium Market Outlook and Cameco's management's discussion and analysis dated Feb. 13, 2026.
See Denison's news release dated Jan. 19, 2022.
Denison monetized its share of tolling revenues from the Cigar Lake toll milling agreement. See Denison's news releases dated Feb. 1, 2017 and
Feb. 13, 2017. Please also refer to Denison's current Annual Information Form and Financial Statements and Management, Discussion and Analysis for additional details related to the toll milling agreement.
See Denison's current Annual Information Form for additional details regarding the McClean Lake mill facility.
14
22.5% Denison-owned McClean Lake Mine:
Mining restart achieved via SABRE mining method at McClean North deposit
SABRE Patented & Operating Successful 5-year test mining program for "Surface Access Borehole Resource Extraction" (SABRE) mining method SABRE is property of McClean Lake JV (MLJV) with patent issued in 2016 | Successful Mining Start in June 2025 MLJV (100%) production of ~85,000 lbs U3O8in Q3'2025 at operating cash costs of ~US$19/lb(1) | |
17.8M lbs U3O8 Indicated Mineral Resources(2) (100% basis) Combined 374,900 tonnes @ 2.2% U3O8 | 7.6M lbs U3O8 Inferred Mineral Resources(2) (100% basis) Combined 510,900 tonnes @ 0.68% U3O8 | |
2025 Activities Mining activities for 2025 are planned to include eight SABRE cavities(3) | Orano Canada Inc. French nuclear giant serves as project operator and is owner of 77.5% interest | 8.67% U3O8 over 13.5 metres Discovered "new" mineralization at McClean South(4) in 2021 + expanded footprint in 2022 and 2025(5) |
PHOTO:
2021 SABRE test mining program in action, with view of specialized mining pipes in inset photo.
NOTES:
As of Sept. 30, 2025, 100% basis. See Denison's financial statements and MD&A for the three months ended Sept. 30, 2025 for details.
See Denison's current AIF for additional details regarding the McClean Lake deposits and SABRE mining method.
See Denison's financial statements and MD&A for the three months ended Sept. 30, 2025 for details.
See Denison's current
AIF for additional details.
See Denison's news releases dated Sept. 8, 2022 and Jul. 21, 2025.
15
25.17% Denison-owned Midwest Property:
In-Situ Recovery PEA for Midwest Main leverages high-grades & proximity to McClean mill(1)
38.7M lbs U3O8@ 3.5% U3O8 Indicated Mineral Resources (100% basis, 510,000 tonnes) Plus… 12.6M lbs U3O8 Inferred mineral resources (100% basis, 905,000 tonnes @ 0.64% U3O8) | C$965M estimated Base-case after-tax NPV8% (100% basis)(3) | C$254M estimated Initial CAPEX (100% basis) |
82.7% estimated Base-case after-tax IRR(3) | 3.8 to 1 Base-case post-tax NPV to initial capital cost ratio | |
Approved EIS as Open Pit with processing at McClean Lake CNSC approved final EIS in 2012(2) | US$11.69 / lbs U3O8 average Cash Operating Costs (C$15.78/lb U3O8) | US$25.78 / lbs U3O8 average All-in Cost(4) (C$34.80/lb U3O8) |
PHOTO:
Aerial view of Midwest Project.
NOTES:
See Denison's news release dated Aug. 6, 2025.
See Denison's current Annual Information Form for additional details regarding the Midwest project.
NPV and IRR are calculated to the start of construction activities for the Midwest project and excludes the C$16.8M in pre-FID expenditures.
All-in cost is estimated on a pre-tax basis and includes all project operating costs, capital costs post-FID, and decommissioning costs divided by the estimated number of pounds U3O8to be produced.
16
Midwest ISR Preliminary Economic Assessment (2025)(1):
Demonstrates economic and technical potential at the Midwest Main deposit
7,000,000
6,000,000
Pounds U3O8per year
5,000,000
4,000,000
3,000,000
Midwest mine production per year
37.4 million lbs U3O8 in potentially mineable
resources (650,000 tonnes at 2.6% U3O8)
Evaluation of MLJV's SABRE mining method also being advanced in parallel
Payback period under 1 year
for pre- and post-tax base-case scenarios
2,000,000
1,000,000
-
Calendar Years
Production lbs U3O8
1 2 3 4 5 6 7
Assumptions / Results(1) | Base Case |
Selling price / lb U3O8 | US$80 |
USD:CAD FX Rate | 1.35 |
Pre-tax NPV8%(2)(4) (100%) | $1.62 billion |
Pre-tax payback period(3)(5) | ~6 months |
Pre-tax IRR(2)(6) | 111.1% |
6.1M 6.1M 6.1M 6.1M 6.1M 6.1M 0.8M
NOTES: (1) Refer to Denison's news release dated Aug. 6, 2025; (2) NPV and IRR are calculated to the start of construction activities for the Midwest project and excludes $16.8 million in pre-FID expenditures; (3) Payback period is stated as number of months to payback from the start of uranium production; (4) Post-tax NPV is estimated to be $964.7.2 million in the Base Case; (5) Post-tax payback period is estimated to be ~9 months in the Base-Case; (6) Post-tax IRR is estimated to be 82.7% in the Base Case.
17
70.55% owned Waterbury Lake project:PEA (2020) shows potential for ISR to change uranium mining landscape in Canada(1)
ISR Mining Method Tthe Heldeth Túé ("THT") deposit (formerly J Zone) designed as a low-cost ISR operation with freeze wall design Uranium Bearing Solution ("UBS") to be transported by truck to McClean Lake mill for toll processing Minimal site infrastructure Successful 2023 ISR field test(2) | 1.6M lbs lbs U3O8 Average annual production over 6 years (100% basis) | C$112M estimated Initial CAPEX (100% basis) |
US$12.23 / lbs U3O8 average Cash Operating Costs (C$16.27/lb U3O8) | US$24.93 / lbs U3O8 average All-in Cost(3) (C$33.16/lb U3O8) | |
Partnership with consortium led by state-owned nuclear company Korea Hydro Nuclear Power ("KHNP") | C$265M estimated Pre-Tax NPV8% (100% basis) US$65/lb U3O8selling price (see note 4, 5) | 50.0% estimated Pre-Tax IRR US$65/lb U3O8selling price (see note 4, 6) |
PHOTOS:
Aerial rendering of surface facilities for the THT ISR operation
NOTES:
Refer to the Waterbury Lake Technical Report titled "Preliminary Economic Assessment for the Tthe Heldeth Túé (J Zone) Deposit, Waterbury Lake Property, Northern Saskatchewan, Canada" dated Oct. 30, 2020.
See Denison's news
release dated Nov. 6, 2023
All-in cost is estimated on a pre-tax basis and includes all project operating costs and capital costs divided by the estimated number of finished pounds U3O8produced.
NPV and IRR are calculated based on assessed "high-case" uranium price, to the start of pre-production activities.
Post-tax NPV attributable to Denison's then 66.90% interest is estimated to be between
$72 million (base-case) and $109 million ($65/lb high-case).
Post-tax IRR attributable to Denison's then 66.90% interest is estimated to be between 30.4% (base-case) and
38.9% ($65/lb high-case).
18
Team Denison
Strengthening exposure to exploration upside through strategic investment
TSX-V: COSA |
|
More information: cosaresources.ca |
TSX-V: SYH |
| (3) See Denison's news releases dated Nov. 17, 2025 and Dec. 17, 2025. More information: skyharbourltd.com |
Nasdaq: FMST CSE: FAT |
| (4) See Denison's news release dated Sept. 24, 2024. More information: foremostcleanenergy.com |
TSX-V: FUU |
|
|
(9) As of September 30, 2025. See Denison's Q3 2025 MD&As for more information. 19
Environmental, Social, Governance & Indigenous (ESG+I)Fundamental considerations driving Denison's operations
Comprehensive ESG Reporting Designed to address GRI, SASB, TCFD + other global frameworks | Top 115 in Canada Leading Governance Practices Denison recognized by Globe & Mail "Board Games" as top uranium emerging producer / developer for corporate governance practices & disclosure in its assessment of leading companies and trusts included in Canada's benchmark S&P/TSX Composite Index(2, 3) | |
Board approved Indigenous Peoples Policy First-in-sector policy reflecting Denison's commitment to take action towards advancing reconciliation with Indigenous peoples in Canada(1) | ||
Multiple Indigenous Agreements Shared Prosperity Agreement with English River First Nation(4) Mutual Benefits and Community Benefit Agreements with Kineepik Métis Local #9, and the Village of Pinehouse(5) Regional Mutual Benefits Agreement with the Ya'thi Néné Land and Resource Office and the Regional Athabasca Communities(6)** Impact Benefit Agreement and Exploration Agreement with Métis Nation - Saskatchewan(7) | Authentic Social Programs Denison's community / social investment program targets community-based initiatives | Strong EHS&S Culture & Results One lost time injury across all operations and no significant environmental events for 2024(8) |
PHOTO:
Highlights of the Elders of Sakitawak's market garden in Ile a la Crosse, a community-based initiative sponsored by Denison.
NOTES:
See news release dated Dec. 2, 2021.
For more information: https://www.theglobeand mail.com/business/career s/management/board-games/article-canada-corporate-boards-ranking-2025/
See Denison's news release dated Mar. 15, 2021.
See news release dated Sep. 27, 2023.
See news release dated Jul. 11, 2024.
See news release dated Dec. 1,2025.
See news release dated Dec. 4 2025.
See Denison's AIF for additional details.
**includes the Hatchet Lake Denesułiné First Nation, Black Lake Denesułiné First Nation, Fond du Lac Denesułiné First Nation, the Northern Hamlet of Stony Rapids, the Northern Settlement of Uranium City, the Northern Settlement
of Wollaston Lake, and the Northern Settlement of Camsell Portage
20