Daisy South Drilling Confirms High Grade Lode Extensions
Filed with ASX · · 24 pages · English and French
Summary by 6ix AI
Pantoro Gold Limited has announced results from its ongoing drilling program at the Daisy South deposit, confirming high-grade lode extensions and supporting the existing mineralization model. The infill drilling has returned significant high-grade intersections, which are expected to enhance the open pit mining study and mine planning. Additionally, initial step-out drilling has identified extensions to mineralization within the Daisy Shear Zone, indicating potential for further resource development. The company is progressing with mine design and planning, aiming to develop Daisy South alongside the Gladstone Everlasting Open Pit.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Earlier from Pantoro Gold
- S&P DJI Announces December 2025 Quarterly Rebalance
- Scotia Underground Depth Extensions Confirmed
- Tulla Resources Share Sale
- Continued High Grade Results from Mainfield Drilling
- Quarterly Results Presentation
Later from Pantoro Gold
- Quarterly Activities/Appendix 5B Cash Flow Report
- On-Market Share Buy-Back
- December 25 Half Year Report and FY 26 Guidance Update
- Development of Third Underground Mine at Norseman
- Impressive Results in the Butterfly Area of Mainfield
Follow Pantoro Gold into a list and get an email when it puts out news.
Follow Pantoro Gold